Ich habs gefunden http://www.blm.gov/pgdata/etc/medialib/blm/ca/pdf/palmsprings/blythe_feis0.Par.18342.File.dat/Blythe_ROD_FINAL.pd 1.1.1 Application/Applicant Pursuant to an agreement with Solar Millennium jointly to develop the Blythe Solar Power Project, Chevron Energy Solutions submitted a Standard Form 299–“Application for Transportation and Utility Systems and Facilities on Federal Lands” with the BLM Palm Springs/South Coast Field Office for a ROW grant to Palo Verde Solar I, LLC. Palo Verde Solar I, LLC is a wholly-owned subsidiary of Solar Millennium and is the single applicant (Applicant) for the Blythe Solar Power Project. Solar Millennium is part of an international company in the renewable energy sector and a global leader in the2 "Paolo Verde Solar I LLC is wholly-owened by SM and the single Applicant", thats it Auch noch wichtig One ROW grant will be issued to Palo Verde Solar I, LLC for a term of 30 years with a right of renewal so long as the lands are being used for the purposes specified in the grant. The ROW grant will allow Palo Verde Solar I, LLC, the right to use, occupy and develop the described public lands to construct, operate, maintain, and terminate a concentrated solar thermal electric generating facility with four adjacent, independent solar plants of 250 megawatt (MW) nominal capacity each (for a total capacity of about 1,000 MW nominal capacity) in eastern Riverside County, as the BLM identified and evaluated in the PA/FEIS. The project site is located approximately two miles north of the I-10 freeway, and eight miles west of the city of Blythe, California, within Township 6 South, Ranges 21 and 22 East and Township 5 South, Range 22 East. Figure 1, provided in Appendix 5, Location Maps, shows the location of the project site. SM darf hier "für immer " ein CSP-Kraftwerk betreiben. Das ist besser als eine Ölquelle, die ist nämlich mal leer. Frage: Was ist dieses Recht wert?? |