#9091 da gehts nicht um die " 2" Anlagen gestellt haben, sondern das sie hingegen der Meinung unserer Fachleute im Fachthread muecke1 nun EU Standard haben und hier auf zu stellen beginnen.
Daran kann man sehen, dass dieser Thread in keinster Weise der Information für die Aktionäre dient, sondern lediglich ein Pro Propaganda Thread sein soll.....
Hehe, das Wort "Propaganda" aus Ihrem Munde ist Klasse...Dank für diese Erheiterung...vielleicht ein bisschen "westliche Propaganda" zu den Problemen der Chinesen...wobei... es sind auch chinesische Artikel bei...)
Yuankai Feng pointed out that since last year, many of our local power grid do not have low voltage ride through capability of wind farm power rationing this year, the power rationing measures will continue.... http://www.86wind.com/html/2012-02/fenglifadian-13978.htm LVRT capability relies greatly on the LVRT capability of individual wind turbines. CEPRI has made substantial progress in the LVRT testing of wind turbines, developing (in cooperation with FGH Germany) the first mobile wind turbine LVRT test facility in China. http://blog.chinaero.com.cn/jiangliping/html/blog/...4885580754.shtml
ups...Ihr Sinovel scheint da Probleme zu haben?...und nicht nur dort...)
Sinovel estimated that its net income for FY2011 declined by more than 50% compared with 2010 profits of 2.856 billion Yuan (~$450 million USD). The decline in profitability of Sinovel in 2011 was attributed to several factors: intense competition in the Chinese wind turbine market, delays in the development of certain wind farm projects and a series of mishaps that adversely affected the grid, which were caused by turbine defects evident during low voltage ride through (LVRT) events. According to an official with Longyuan Power, the detection of turbine defects, which brought about the low voltage ride through issues has resulted in new rules, which, among other things, require that all wind turbines undergoing upgrades to address this problem obtain the approval of the State Grid Electric Power Research Institute prior to being put back in service. These inspections, being time consuming, have put further pressure on turbine manufacturers. This is an issue that certainly impacts Sinovel because of its large base of installed turbines, and particularly because some of the most prominent incidents occurred at the Gansu Province, Jiuquan wind farm, where Sinovel’s turbines predominate.
In addition to the fiscal and technical challenges Sinovel faces this year, the company also is confronting legal claims of more than $1.2 billion USD and a worldwide public relations blowback as a consequence of the souring of its relationship with AMSC (AMSC), formerly American Superconductor Corporation; indeed Sinovel has become a poster child for U.S. government complaints about Chinese trade practices in discussions with Xi Jinping, China’s incoming leader, who is visiting the U.S. this week.
http://www.altenergystocks.com/archives/2012/02/...nd_industry_1.html
falls sie sich fragen wie die "grid compliance" von Nordex Anlagen ist...
Nordex 2.5MW wind turbines comply with all known grid codes across the globe. It has outstanding grid compliance, i.e., a flexible and powerful fault ride through capability. During the process of Low Voltage Ride Through (LVRT) or High Voltage Ride Through (HVRT), the turbine can continuously output reactive power; with the adoption of new circuit topology design, Zero Voltage Ride Through (ZVRT) and fast reacting speed can be achieved. It is also worth noting that parameters can be defined to achieve flexible project-specific configurations.
http://www.eqmaglive.com/...s&catid=13:asiapacific&Itemid=174
auch als Fortsetzung hierzu http://forum.finanzen.net/forum/..._und_Kontra-t450829?page=362...ist ja schon wieder kaum zu finden, was vor wenigen Stunden erst gepostet wurde...ganz in Ihrem Sinne?...schon nah dran an Schrott, wie ich finde....) |