ADX jetzt auf 1300 m Tiefe und untersucht die Ergebnisse von 2 möglichen durchschnittenen Lagerstätten.
Für die weiteren Untersuchungen ist das Setzen des 9 5/8” casing point
notwendig. Die Höhe dieses Reservoirs beträgt ca 250m!
"To date the well has intersected two potential reservoir zones, which will be evaluated by wireline logging prior to setting casing at the 9 5/8” casing point.
Weekly operations forecast:
• Drill ahead to next casing point (9 5/8” casing)
• Prepare hole for wireline logging operations - which amongst other things will determine hydrocarbon potential
• Commence 9 5/8” casing operations and continue with drilling the final 8 ½ hole to end of well"Eine Stellungnahme aus HC:
"I'm not an expert but drilling ahead to the next casing point must come first (as per the ann.), after which the hole must be prepared for the wire line log.
I don't know what logging tools have been selected but typically a tool is drawn up the hole at about 250 metres/hr.... so that element shouldn't take very long.
Time to interpret can also vary depending on the formation .... tight formations taking longer. A quick analysis may be possible but in any case, once all the tools are retrieved, casing then drilling can continue.
From the ann. all I can say is that the tools should be out of the well and the 9 3/8" casing operations then completed to allow drilling ahead by the the end of the week (Sunday I guess).
All I can say in summary is .....so far so good.
expert comment is required."