irgendwie findet sich doch immer interessantes, wenn sie mal wieder hartnäckig gegenteiliges behaupten...Dank dafür ...Chief Engineer of China Huadian New Energy Development Co., Ltd. Yuan Kaifeng also "intensified" to describe the wind power to power rationing problem. Yuankai Feng pointed out that the 2011 China Wind Power "power rationing" has more than 1.5 billion kwh, accounting for 12% of wind power generating capacity. Individual areas, especially in the "Three North" in some areas nearly 20%, including five power generation groups limit the power accumulated more than 90% of the total power rationing.
Yuankai Feng pointed out that since last year, many of our local power grid do not have low voltage ride through capability of wind farm power rationing this year, the power rationing measures will continue.... http://www.86wind.com/html/2012-02/fenglifadian-13978.htm folgendes hatte ich mal erwähnt...ja die Google Übersetzungen sind immer was schwer zu interpretieren...man könnt aber meinen der behauptet, dass die "Basis" im Testcenter in Zhangbei eine Nordex Anlage bildet... NORDEX wind power project director of Ni Zhongren recalled that Zhangbei base wind turbines from his hand, is a fan of a 1.5 MW S77 models, and is customized in accordance with the requirements of EPRI, adding time the most advanced low voltage across the module. http://finance.sina.com.cn/leadership/mroll/...808/115710278475.shtml Was wohl mit Basis für lvrt-capability denn? gemeint ist...)...also die "grid compliance" der Nordex-Anlagen scheint auf jeden Fall "hervorragend"?... Nordex 2.5MW wind turbines comply with all known grid codes across the globe. It has outstanding grid compliance, i.e., a flexible and powerful fault ride through capability. During the process of Low Voltage Ride Through (LVRT) or High Voltage Ride Through (HVRT), the turbine can continuously output reactive power; with the adoption of new circuit topology design, Zero Voltage Ride Through (ZVRT) and fast reacting speed can be achieved. It is also worth noting that parameters can be defined to achieve flexible project-specific configurations. http://www.eqmaglive.com/...s&catid=13:asiapacific&Itemid=174 |