da wird einem einiges Klar ! http://www.vggoldcorp.com/propertyreports/DT_43-101.pdf SanGold und VG werden da sehr wahrscheinlich genau wissen was sie machen, Auszug aus dem Exploration Report (2003 – 2005) Tisdale Project Seite 13 und folgende: Getty Program -1986/87 -Phase 2 Commencing in November 1986, the objectives of this program were: • To detail the geometry of the mineralized shoots above the 106 m (350 ft) Level • To upgrade the reserve category from drill probable to mine proven and to generate sufficient information for the proposed feasibility study • To determine the most efficient mining method • To process the bulk sample at a custom Go-Mill Under the Phase II underground exploration program the main ramp was driven 17 metres below the 5th Level, a total distance of 1,081m and the west ramp was drive 506 m to the "S" Zone. In excess of 6,000 m of underground diamond drilling was completed. Detailed channel sampling was carried out on the 5th Level and the results indicated two areas with very high grade (up to 4075 g Au/t in one channel) which was well supported with other samples ranging from 200 to >1000 g Au/t (Fig. 4). Total underground excavation was as follows: • Ramping – 1,504.7 metres • Drifting – 960.5 metres • Raising – 199.0 metres ps.. diese Ostereier sind somit schon im Nest, auch wenn der Wert dieses noch nicht reflektiert ----------- Wer Rechtschreibfehler findet, der darf diese gerne behalten |