The company with offices in Manchester is proposing a wind farm with up to 20 turbines that would produce at most 50 megawatts of energy. It would be located just south of Grandpa’s Knob to Biddie Knob in the towns of West Rutland, Hubbardton, Castleton and Pittsford. They have partnered with Nordex USA. The turbines would be 300- to 328-foot towers with three blades between 160 to 188 feet. The project would be interconnected to the VELCO substation in West Rutland. http://www.wind-watch.org/news/2012/05/16/...en-against-wind-project/ http://translate.google.de/...26biw%3D1680%26bih%3D881%26prmd%3Dimvns http://www.reunionpower.com/projectportfolio.html |