St. Barbara

Seite 1 von 1
neuester Beitrag: 16.11.24 14:05
eröffnet am: 13.04.24 21:01 von: peter47 Anzahl Beiträge: 15
neuester Beitrag: 16.11.24 14:05 von: peter47 Leser gesamt: 2970
davon Heute: 10
bewertet mit 0 Sternen

13.04.24 21:01

254 Postings, 5951 Tage peter47St. Barbara

New Sorowar – Pigiput Mineralised Zone Confirmed by Latest Diamond Drilling Assays

https://stbarbara.com.au/wp-content/uploads/2024/...eri-confirmed.pdf  

13.04.24 21:04

254 Postings, 5951 Tage peter47Appendix 3H - Notification of cessation of securit

Appendix 3H - Notification of cessation of securities

https://stbarbara.com.au/wp-content/uploads/2024/...x-appendix-3h.pdf  

28.09.24 13:45

254 Postings, 5951 Tage peter47Form 604

Form 604
Corporations Act 2001
Section 671B
Notice of change of interests of substantial holder

Brightstar Resources Limited ("BTR")

...

https://stbarbara.com.au/wp-content/uploads/2024/...urces-limited.pdf  

05.10.24 13:30

254 Postings, 5951 Tage peter47Form 604

Form 604
Corporations Act 2001
Section 671B
Notice of change of interests of substantial holder
To Company Name/Scheme Patronus Resources Limited (ASX:PTN)
ACN/ARSN ACN 150 597 541
1. Details of substantial holder (1)
Name St Barbara Limited (ASX:SBM) and the entities listed in Annexure A
ACN/ARSN (if applicable) ACN 009 165 066
There was a change in the interests of the
substantial holder on 11/09/2024
The previous notice was given to the company on 15/02/2023
The previous notice was dated 15/02/2023

...

https://stbarbara.com.au/wp-content/uploads/2024/...urces-limited.pdf  

05.10.24 13:31

254 Postings, 5951 Tage peter47Appendix 3H - Notification of cessation of securit

Appendix 3H - Notification of cessation of securities
Appendix 3H - Notification of cessation of securities 1 / 4
Announcement Summary
Entity name
ST BARBARA LIMITED
Announcement Type
New announcement
Date of this announcement
Wednesday October 02, 2024
Details of +securities that have ceased

https://stbarbara.com.au/wp-content/uploads/2024/...2-appendix-3h.pdf  

12.10.24 12:38

254 Postings, 5951 Tage peter47Updated Pre-Feasibility for Atlantic Projects

Updated Pre-Feasibility for Atlantic Projects
NPV5 of A$468 million and Post Tax IRR of 37.3% at US$2,000/oz gold price

Highlights
The Pre-Feasibility study for the consolidated 15-Mile and Beaver Dam Projects has been updated with fresh
assumptions utilising the relocated Touquoy processing plant at full production capacity of 2.1 million tonnes per
annum. The results are very attractive, offering a capital-efficient project with strong economics, should the permitting
environment improve in Canada (and in particular Nova Scotia) under the proposed Canadian Federal regulatory
environmental approvals reforms.
• Significant Economic Contribution to Nova Scotia and Canada: Capital construction cost investment of nearly
C$200 million in the first twelve months after environmental approval, with a further C$1.03 billion in spending over
the Project’s planned operating life. More than 1,000 direct jobs in construction and over 300 direct jobs in the
operating phase are anticipated – rural and well paid.
• Upgraded Environmental Protection Design Elements: Efficient infrastructure layout to fit within environmental
and social constraints, with the open pit backfilling of waste leading to final landforms more closely aligned with the
original project area. Pit optimisation and efficient layout designs drastically reduce disturbance at the Beaver Dam
project.
• Strong Project Economics: Optimised project study with improved processing rate, operating costs and
optimised overall design. Post-tax NPV (discount rate 5%) of C$411 million (A$468 million) and post-tax IRR of
37.3% using a long-term gold price of US$2,000 per ounce (exchange rates of C$1.00 = US$0.78 and C$1.00 = A
$1.14).
• Capital Efficient Outcome: Initial capital of a modest C$194 million (A$222 million), including a C$26 million
contingency, is achieved as a result of the relocation of a substantial portion of Touquoy process plant. Capital
includes mine pre-production, mine fleet, processing and infrastructure. Additional capital cost of C$43 million
incurred in Year 5 of the Life of Mine to bring on the 450,000 oz Beaver Dam satellite pit development.
• Low unit costs: Life of mine All-In Sustaining Cost for this low strip ratio project estimated to be US$1,025 per
ounce (A$1,499 per ounce). Synergies with shared equipment and services across 15-Mile and Beaver Dam
reduces overall unit costs.
• Stable Production Profile: Average annual production of 74koz of gold produced over the 11 year mine life.
• Short Construction and Ramp-Up Time Frame: Optimised tailings dam construction and the re-use of existing
Touquoy mill equipment reduces the construction to one year. Utilisation of existing equipment from the Touquoy
mine will minimise capital inflation and lead times, de-risk commissioning, and allow a quick ramp up to commercial
production.
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce the completion of an
updated Pre-Feasibility Study (PFS) for the 15-Mile and Beaver Dam Projects, located in Trafalgar and Marinette
respectively in Nova Scotia, prepared in accordance with Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (“the JORC Code”).

https://stbarbara.com.au/wp-content/uploads/2023/...refeasibility.pdf

 

19.10.24 14:04

254 Postings, 5951 Tage peter47Significant Intercept of 31 m at 6.1 g/t Au at Sor

17 October 2024
Significant Intercept of 31 m at 6.1 g/t Au at Sorowar – Pigiput Trend
Highlights

Assay results have been received for the first 13 resource definition, exploration and sterilisation drill
holes (SDH570 to SDH582) from the FY25 Simberi drill program, significant intercepts from the
Sorowar – Pigiput Trend include:
o SDH576: 31 m @ 6.1 g/t Au from 35 m, including 8 m @ 20.1 g/t Au from 53 m, including
4 m @ 37.8 g/t Au from 54 m,
o SDH578: 45 m @ 1.5 g/t Au from 5 m,
o SDH580: 25 m @ 1.9 g/t Au from 17 m, including 3 m @ 8.2 g/t Au from 35 m,
o SDH581: 31 m @ 1.7 g/t Au from 96 m, including 8 m @ 3.9 g/t Au from 111 m,
o SDH582: 20 m @ 2.3 g/t Au from 21 m, including 8 m @ 4.2 g/t Au from 25 m and 19 m @
2.8 g/t Au from 50 m, including 14 m @ 3.5 g/t Au from 52 m.
• Resource definition holes SDH576 and SDH582 both intersected significant near-surface higher-
grade mineralisation, extending vertically between 15 m and 40 m below the sulphide Ore Reserve
pit design.
• Mineralisation intersected in both SDH576 and SDH582 remains open along strike to the southeast
and down dip.

St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce the completion of
24 diamond drill holes from the proposed 62 hole FY25 sulphide drilling program, with assay results returned for the first 13 holes (including sterilisation drill holes SDH572, SDH577 and SDH579)
These include the first new results reported from the Sorowar – Pigiput Trend since June 2024 (refer to the ASX release on 17 June 2024 titled “More Encouraging Assay Results from Sorowar – Pigiput Mineralised Zone”). This series of results forms part of the FY25 resource definition, exploration and sterilisation drill program comprising 62 holes for 9,000 m that commenced on 1 July 2024 at the Simberi Operations in Papua New Guinea (PNG). The program includes approximately 4,750 m of resource definition drilling at both the Sorowar-Pigiput Trend and the Samat deposit; and approximately 4,250 m of exploration and sterilisation drilling testing in six further areas. Drilling is progressing ahead of schedule with approximately 40% of the overall program completed.
St Barbara Managing Director and CEO Andrew Strelein said:
“The decision to move quickly to follow up on the FY24 discovery of the new Sorowar – Pigiput mineralised zone has been rewarded with hole SDH576 returning 31 metres at 6.1 g/t Au from just 35 metres, including 8 metres at 20.1 g/t Au.”
“This assay result is another very encouraging broad intercept at shallow depth in this new mineralisation
zone between Sorowar and Pigiput pits, located immediately below the sulphide Ore Reserve pit design.
Hole SDH533, drilled as part of our FY24 program, is located 27 m immediately up-dip and forms part of the same trend, and returned 45 metres at 2.2 g/t Au from 0 metres including 10 metres at 5.1 g/t Au from 26 metres. An additional hole is planned to test the mineralisation 40 metres down dip from hole SDH576, some 50 metres below the sulphide Ore Reserve pit design.”
“Hole SDH582 included 20 metres at 2.3 g/t Au from 21 metres and 19 metres at 2.8 g/t Au from 50 metres
and is another very encouraging intercept at shallow depth in between Sorowar and Pigiput pits, located
between 15 and 40 metres vertically below the sulphide Ore Reserve pit design.”
“The shallow high-grade mineralisation intersected in both SDH576 and SDH582 remains open along strike to the southeast and down dip to the southwest.”
“During the December quarter we anticipate the return of assay results for the remainder of the 24 resource definition, exploration and sterilisation holes drilled to date at Sorowar – Pigiput trend and Pigibo North. The sterilisation and exploration holes have been proposed to close out the mineralisation boundaries and are important for the finalisation of pit designs and waste deposition plans.”

...

https://stbarbara.com.au/wp-content/uploads/2024/...at-6.1-g-t-au.pdf  

26.10.24 14:49

254 Postings, 5951 Tage peter47Withdrawal of Resolution 6

23 October 2024
Withdrawal of Resolution 6 (Approval of 10% placement capacity) at
2024 Annual General Meeting
St Barbara Limited (“St Barbara” or the “Company”) (ASX:SBM) advises that it has withdrawn Resolution 6 (Approval
of 10% placement capacity) from consideration at the Company’s Annual General Meeting (Meeting) to be held today,
Wednesday, 23 October 2024 at 2:00 pm AWST.
Resolution 6 requested approval of an additional 10% placement capacity, as detailed in the Company Notice of Meeting
dated 13 September 2024 (Notice).
To be eligible to seek approval for the 10% placement capacity under ASX Listing Rule 7.1A, a listed entity must have
a market capitalisation of $300 million or less and not be included in the S&P/ASX300 Index. The Company’s market
capitalisation has increased beyond $300 million since the Notice and it is therefore ineligible to seek approval under
ASX Listing Rule 7.1A.
The withdrawal of Resolution 6 will have no material adverse impact on the Company and will not affect the validity of
the proxy form provided in connection with the Meeting or any proxy already submitted in respect of the remaining items
of business.
All other items of business included in the Notice will be put to shareholders at the Meeting

Authorised by
Kylie Panckhurst
General Counsel and Company Secretary

https://stbarbara.com.au/wp-content/uploads/2024/...neral-meeting.pdf  

26.10.24 14:53

254 Postings, 5951 Tage peter47Quarterly Report Q1 September FY25

Q1 September FY25
3 months to 30 September 2024 (unaudited)

Highlights

https://stbarbara.com.au/wp-content/uploads/2024/...eport-q1-fy25.pdf  

26.10.24 14:55

254 Postings, 5951 Tage peter47Presentations to 2024 Annual General Meeting

26.10.24 14:55

254 Postings, 5951 Tage peter472024 Annual General Meeting Results

16.11.24 14:03

254 Postings, 5951 Tage peter47Appendix 2A - Application for quotation of securit

16.11.24 14:03

254 Postings, 5951 Tage peter47Completion of Tranche 1

Completion of Tranche 1 of the Placement and Share Purchase Plan to
open

https://stbarbara.com.au/wp-content/uploads/2024/...d-spp-to-open.pdf  

16.11.24 14:05

254 Postings, 5951 Tage peter47St Barbara Limited (ASX:SBM) Share Purchase Plan

St Barbara Limited (ASX:SBM) Share Purchase Plan (SPP)

https://stbarbara.com.au/wp-content/uploads/2024/...-shareholders.pdf  

   Antwort einfügen - nach oben