Top-Foren
|
|
|
---|---|---|
Gesamt | 76 | 1067 |
Talk | 5 | 469 |
Börse | 60 | 459 |
Blockchain | 20 | 141 |
Hot-Stocks | 8 | 92 |
DAX | 11 | 54 |
Montezuma Mining Mangan Gigant vor dem Erwachen
Seite 23 von 30
neuester Beitrag: 25.04.21 12:59
|
||||
eröffnet am: | 10.02.11 00:12 von: | 102030Fips | Anzahl Beiträge: | 746 |
neuester Beitrag: | 25.04.21 12:59 von: | Lauraworea | Leser gesamt: | 128670 |
davon Heute: | 47 | |||
bewertet mit 21 Sternen |
||||
|
--button_text--
interessant
|
witzig
|
gut analysiert
|
informativ
|
1
0
2
8 November 2011 Ms Elizabeth Harris ASX Limited Exchange Plaza Level 8, 2 The Esplanade PERTH WA 6000 Dear Elizabeth RE: PRICE AND VOLUME QUERY I refer to the price and volume query from ASX Limited of 8 November 2011 to Montezuma Mining Company Ltd (the Company) and provide the following responses: 1. The Company is not aware of any market sensitive information that has not been released to the market. As released on 1 November 2011, early assay results from the recently completed RC drilling programme at the Company’s 100% owned Butcherbird Copper Project returned outstanding copper results.
Assays received for the first two (2) holes intersected 47m of continuous copper mineralisation. The mineralisation is open along strike and at depth within a >6km striking corridor. Remaining assay results are pending.
2. Not applicable. 3.
The Company is not aware of any explanation for the price change. 4. The Company confirms that it is in compliance with the listing rules and in particular listing rule 3.1.
Should you have any queries or require any further clarification please contact me on (08) 9389 2123. Yours faithfully John Ribbons Director and Company Secretary Montezuma Mining Ltd. ABN 46 119 711 929 PO Box 910, West Perth WA 6872 Ground Floor, 31 Ventnor Ave, West Perth WA 6005 Phone: +61 8 6315 1400 Fax: +61 8 9486 7093 Website: www.montezumamining.com.au admin@montezumamining.com.au ASX Compliance Pty Limited ABN 26 087 780 489 Level 8 Exchange Plaza 2 The Esplanade PERTH WA 6000 GPO Box D187 PERTH WA 6840 Telephone 61 8 9224 0000 Facsimile 61 8 9221 2020 www.asx.com.au 8 November 2011 Mr John Ribbons Company Secretary Montezuma Mining Company Limited 31 Ventnor Avenue WEST PERTH WA 6005 Dear John Montezuma Mining Company Limited (“the Company”) PRICE AND VOLUME QUERY We have noted a change in the price of the Company’s securities from a closing price on Monday 31 October November 2011 of 30 cents to an intra-day high today, Tuesday, 8 November 2011 of 71 cents.
We have also noted an increase in the volume of trading in the securities over this period. In light of the price and volume change, please respond to each of the following questions. 1.
Is the Company aware of any information concerning it that has not been announced which, if known, could be an explanation for recent trading in the securities of the Company? Please note that ....
google Übersetzung----
Response to ASX Preis-und Volumen-Abfrage Tue, 8 November 2011 17.18.00 1000 33 Minuten
8 November 2011 Frau Elizabeth Harris ASX Ltd Exchange Plaza Level 8, 2 The Esplanade PERTH WA 6000 Sehr geehrte Elizabeth RE: Preis und VOLUME QUERY Ich verweise auf die Preis-und Mengenentwicklung Abfrage von ASX von 8 November 2011, um Montezuma Mining Company Ltd (die Company Limited ) und geben Sie die folgenden Antworten: 1. Das Unternehmen ist nicht bekannt, dass Markt sensible Informationen, die nicht auf den Markt freigegeben wurde. Wie am 1 November 2011 veröffentlicht, kehrte Anfang der Untersuchungsergebnisse aus dem kürzlich abgeschlossenen RC-Bohrprogramm auf dem zu 100% im Besitz butcherbird Kupfer-Projekt hervorragende Kupfer-Ergebnisse. Assays für die ersten zwei (2) Bohrlöchern durchschnitten 47m kontinuierliche Kupfer-Mineralisierung. Die Mineralisierung ist entlang des Streichens und in der Tiefe in einem> 6km markanten Korridor zu öffnen. Verbleibende Assay-Ergebnisse sind noch ausständig. 2. Nicht anwendbar. 3. Das Unternehmen ist nicht bekannt, eine Erklärung für den Preis zu ändern. 4. Das Unternehmen bestätigt, dass es in Übereinstimmung mit dem Kotierungsreglement und insbesondere Listing Rule 3.1 ist. Sollten Sie Fragen haben oder benötigen keine weiteren Klärung kontaktieren Sie mich bitte an (08) 9389 2123. Mit freundlichen Grüßen John Ribbons Director und Company Secretary Montezuma Mining Ltd ABN 46 119 711 929 PO Box 910, West Perth WA 6872 Ground Floor, 31 Ventnor Ave, West Perth WA 6005 Tel: +61 8 6315 1400 Fax: +61 8 9486 7093 Website: www.montezumamining.com.au admin@montezumamining.com.au ASX Einhaltung Pty Limited ABN 26 087 780 489 Level 8 Austausch Plaza 2 The Esplanade PERTH WA 6000 GPO Box D187 PERTH WA 6840 Telefon 61 8 9224 0000 Fax 61 8 9221 2020 www.asx.com.au 8 November 2011 Herr John Ribbons Company Secretary Montezuma Mining Company Limited 31 Ventnor Avenue West Perth WA 6005 Dear John Montezuma Mining Company Limited (das "Unternehmen") Preis und QUERY Wir haben eine Veränderung in der festgestellt Preis von Wertpapieren der Gesellschaft von einem Schlusskurs am Montag, 31. Oktober November 2011 von 30 Cent auf ein Intra-Day hoch heute, Dienstag 8. November, 2011 von 71 Cent. Wir haben auch eine Zunahme des Volumens der Handel mit Wertpapieren beachten, über diesem Zeitraum. In Anbetracht des Preises und der Lautstärke zu verändern, beantworten Sie bitte jede der folgenden Fragen. 1. Ist das Unternehmen bekannt, dass Informationen über sie, dass nicht angekündigt wurde, die, soweit bekannt, könnte eine Erklärung für den letzten der Handel mit Wertpapieren des Unternehmens werden? Bitte beachten Sie, dass ....
http://media.wotnews.com.au/asxann/01238899.pdf
Optionen
3
Wednesday, November 09, 2011 by John Phillips
Montezuma Mining Company (ASX: MZM) has received some very strong support from investors in recent weeks, with the share price rallying to $0.71 intra-day yesterday (Tuesday 8 November), from $0.30 a little over a week earlier on Monday 31 October.
The 137% share spike attracted attention from the ASX, which issued Montezuma a price and volume query.
Montezuma replied to the ASX that the company is not aware of any market sensitive information that has not been released to the market, and stated:
'As released on 1 November 2011, early assay results from the recently completed reverse circulation drilling program at the company’s 100% owned Butcherbird Copper Project returned outstanding copper results.'
These results included the broad 47 metres at 1.81% copper from 113 metres, which included the stunning high grade intercept of 6 metres at 6.08% copper and 631 parts per million cobalt.
What is so significant about the intersection is that it was discovered at the very start of the recent drilling campaign, with assays still pending for 17 of the 19 hole program - which covered around 2700 metres.
Providing a further prospectivity boost to the project, previously completed IP, aeromagnetic and EM surveys highlight numerous copper/cobalt targets over 6 kilometres of strike - which remains open.
google Übersetzung----------------
Montezuma Mining Company Antworten auf ASX 'please explain "nach 137% Aktien spike
Mittwoch, 9 November, 2011 von John Phillips
Montezuma Mining Company ( ASX: MZM ) hat einige sehr starke Unterstützung von Investoren in den letzten Wochen erhalten haben, mit dem Aktienkurs Rallyesport zu $ 0,71 intra-day gestern (Dienstag, den 8. November), von $ 0,30 ein wenig mehr als eine Woche zuvor am Montag, 31. Oktober. Die 137%-Anteil Spike zog die Aufmerksamkeit von der ASX, die Montezuma eine Preis-und Volumen-Abfrage ausgegeben. Montezuma antwortete dem ASX, dass das Unternehmen nicht bewusst ist, jeden Markt sensible Informationen, die nicht auf den Markt freigegeben wurde, und erklärte: "Als veröffentlicht am 1 November 2011, kehrte Anfang der Assay-Ergebnisse des vor kurzem abgeschlossenen Reverse-Circulation-Bohrprogramm auf dem zu 100% im Besitz butcherbird Kupfer-Projekt hervorragende Kupfer-Ergebnisse. " Diese Ergebnisse enthalten die breite von 47 Metern bei 1,81% Kupfer ab 113 Metern, was den mitgelieferten atemberaubende hochgradigen Abschnitt von 6 Metern bei 6,08% Kupfer und 631 Teilen pro Million Kobalt. Was ist so bedeutsam, um den Schnittpunkt ist, dass es ganz am Anfang des letzten Bohrprogramms, mit Tests entdeckt wurde, noch nicht abgeschlossen für 17 der 19 Loch Programm -. etwa 2700 Metern bedeckt , die eine weitere Prospektivität steigern, um das Projekt, bereits abgeschlossenen IP, aeromagnetischen und EM Umfragen Highlight zahlreichen Kupfer / Kobalt-Ziele über 6 Kilometer von Streik - die offen bleibt.
Quelle proactivinvestor
Optionen
3
hui das scheint ja richtig fix zu gehen mit den ergebnissen.
wieder einer tranche oder direkt alle?
Optionen
2
1
Optionen
0
Montezuma Mining (ASX:MZM)
Asian Activities Report for November 15, 2011: Montezuma Mining (ASX:MZM) Reports Further High Grade Copper Results from Butcherbird Copper Project
Sydney, Nov 15, 2011 (ABN Newswire) - Montezuma Mining Company Limited (ASX:MZM) says today that further assay results from the recently completed drilling programme at the Butcherbird Copper Project have returned further high grade copper results, with a total of 61 metres of continuous copper mineralisation averaging 1.96% Cu and 228ppm Co. The Company has commenced additional drilling to confirm the orientation of the mineralisation zone and to test the depth and strike extent.
Universal Coal plc (ASX:UNV) has received all large diameter drill sample analysis and test work for Berenice-Cygnus coking coal project. The results provide a better understanding of the type and quality of coking coal present at the project, indicating that coking coal product yields in the practical mining situation may be significantly higher than previously indicated. The project currently hosts a JORC compliant coal resource of 1.325 billion tonnes.
Guildford Coal Limited (ASX:GUF) announces an initial JORC resource estimate for EL13780X in the South Gobi Coal Project of 63.1 million tonnes, which underpins the potential start-up open cut mining opportunity of 1-2 Mtpa for the South Gobi Project for at least 20 years. The Company plans to continue drilling on the other key tenements in the South Gobi Project to define the JORC resource. Discussions with potential offtake partners have commenced.
Aguia Resources Limited (ASX:AGR) has received excellent drilling results from the TE project in southern Brazil. The new results highlight the prospective nature of the TE Project, returning wide zones of phosphate mineralisation at good grades from the surface over a wide area that is open in all directions. The Company plans to complete the initial drilling program, to be followed by beneficiation studies and the delineation of a JORC Mineral Resource estimate.
google Übersetzung----------
Asian Tätigkeitsbericht für 15. November 2011: Montezuma Mining (ASX: MZM) Berichte Weitere High Grade Copper Ergebnisse aus butcherbird Kupfer-Projekt
Montezuma Mining (ASX: MZM)
Asian Tätigkeitsbericht für 15. November 2011: Montezuma Mining (ASX: MZM) Berichte Weitere High Grade Copper Ergebnisse aus butcherbird Kupfer-Projekt
Sydney, 15. November 2011 (ABN Newswire) - Montezuma Mining Company Limited ( ASX: MZM ) sagt heute, dass weitere Analysenergebnisse aus der kürzlich abgeschlossenen Bohrprogramm auf dem butcherbird Kupfer-Projekt wurden weitere hochgradige Kupfer-Ergebnisse zurückgegeben, mit einer Gesamtfläche von 61 Meter kontinuierliche Kupfer-Mineralisierung mit einem durchschnittlichen 1,96% Cu und 228ppm Co. Das Unternehmen hat zusätzliche Bohrungen, um die Ausrichtung der Mineralisierung Zone zu bestätigen und die Tiefe und Streichlänge zu testen. Universal-Coal plc ( ASX: UNV ) erhalten hat, alle mit großem Durchmesser bohren Analyse von Proben und Test-Arbeit für Berenice-Cygnus Kokskohle Projekt. Die Ergebnisse liefern ein besseres Verständnis der Art und Qualität der Kokskohle derzeit am Projekt, was darauf hinweist, dass Kokskohle Produktausbeuten in der praktischen Bergbau Situation kann wesentlich höher sein als bisher angegeben. Das Projekt beherbergt derzeit eine JORC konforme Ressource von Kohle 1,325 Mrd. Tonnen. Guildford Coal Limited ( ASX: GUF ) gibt bekannt, eine erste JORC Ressourcenschätzung für EL13780X in der Süd-Gobi Coal Project von 63,1 Millionen Tonnen, auf der die potenzielle Start-up in offener Bauweise Bergbau Chance von 1-2 Mtpa für die Süd-Gobi-Projekt für mindestens 20 Jahre. Das Unternehmen plant, die Bohrungen auf dem anderen wichtigen Liegenschaften in der Süd-Gobi-Projekt auch weiterhin die JORC Ressource zu definieren. Gespräche mit potenziellen Partnern Abnahme haben begonnen. Aguia Resources Limited ( ASX: AGR ) erhalten hat hervorragende Bohrergebnisse aus dem TE-Projekt im Süden Brasiliens. Die neuen Ergebnisse unterstreichen die zukünftige Art der TE-Projekt, wieder breite Zonen von Phosphat Mineralisierung auf gute Noten von der Oberfläche über einen weiten Bereich, der in alle Richtungen offen ist. Das Unternehmen plant, die anfängliche Bohrprogramm, um Aufbereitung von Studien und die Abgrenzung einer JORC Ressourcenschätzung gefolgt abgeschlossen sein.
Optionen
2
Tuesday, November 15, 2011 by Angela Kean
Previous and current intersections of continuous copper mineralisation at Butcherbird are starting to reveal the huge copper potential of the project with broad mineralisation that appears to increase in grade at depth.
Montezuma Mining Company (ASX: MZM) is continuing its impressive run of copper hits with strong widths and grade at the Butcherbird Copper Project with the second round of assays from reverse circulation drilling extending the mineralisation and increasing the grade.
The company intersected a total of 61 metres of continuous copper mineralisation at 1.96% copper and 228 parts per million cobalt from 113 metres.
This follows previously announced intercepts of 47 metres at 1.81% copper from 113 metres, which includes a stunning high grade intercept of 6 metres at 6.08% copper and 631 parts per million cobalt.
Managing director Justin Brown commented "It's a fantastic intersection and obviously we’ve only got limited drilling so it’s hard to know how big it’s going to get, but certainly with grades and widths of that sort of tenor it’s pretty exciting."
Importantly, the mineralisation remains open, ending in 0.46% copper. Drilling about 300 metres along strike from the discovery hole returned 83 metres at 0.43% copper from 118 metres including 3 metres at 4.15% copper.
A further boost to the project is the fact that the results for the last 14 metres of the hole were generally of a higher tenor, averaging 2.44% copper, increasing the overall average grade of the discovery intersection.
Several holes testing separate reconnaissance geophysical targets returned no significant copper or cobalt results, however non-copper sulphide minerals may be present and multi element analyses including the platinum group elements are still pending.
Only copper, cobalt and nickel results have been received to date for this latest round of results.
The mineralisation is open along strike and at depth within a greater than 6 kilometre striking corridor.
Previous drilling by Montezuma Mining 130 metres west of the 61 metres at 1.96% copper intersection along this shear zone initially confirmed the presence of copper sulphide mineralisation.
Results included 18 metres at 0.63% copper and 859 parts per million cobalt from 154 metres, and 10 metres at 0.82% copper and 581 parts per million cobalt from 180 metres, including 3 metres at 1.94% copper and 0.12% cobalt.
Montezuma Mining has begun further drilling to confirm the orientation of the zone and to test the depth and strike extent.
Brown told Proactive Investors today the company is in the process of sourcing a larger capacity rig to do some deeper testing because the current rig cannot get to the depths Montezuma Mining is targeting.
"It can only get down to a little over 200 metres so we’d really like to be getting beyond 300 metres because we still haven’t touched the bottom of this thing. It ends in mineralisation even at the depths we got to with that hole," he said.
Once the rig has been secured and mobilised to site, Montezuma Mining is planning an agressive exploration program to test along strike and down dip to assess the size of the deposit.
Butcherbird Potential Revealed Early On
Earlier intersections of 47 metres at 1.81% copper from 113 metres were discovered at the very start of the recent drilling campaign, when assays from just two holes of the 19 hole program had been returned.
Brown said Montezuma Mining is currently reassaying the older drill holes in light of the new results.
google Übersetzung-----------
Montezuma Mining Company meldet beeindruckende 61m bei 1,96% Kupfer aus Bohrungen auf butcherbird abfangen
Dienstag, 15. November, 2011 von Angela Kean
Frühere und aktuelle Schnittpunkte der kontinuierliche Kupfer-Mineralisierung bei butcherbird beginnen, den riesigen Kupfer-Potenzial des Projekts mit breiten Mineralisierung, die in Klasse in der Tiefe zu erhöhen scheint zu offenbaren.
Montezuma Mining Company ( ASX: MZM ) setzt seine beeindruckende Serie von Kupfer-Hits mit starken Breiten und Grade an der Neuntöter-Kupfer-Projekt mit der zweiten Runde der Tests aus Reverse-Circulation-Bohrungen Erweiterung der Mineralisierung und die Erhöhung der Qualität. Das Unternehmen durchschnitt insgesamt 61 Meter von kontinuierlichen Kupfer-Mineralisierung bei 1,96% Kupfer und 228 Teilen pro Million Cobalt von 113 Metern. Dies folgt bereits Abschnitte von 47 Metern bei 1,81% Kupfer ab 113 Metern, die eine atemberaubende hochgradigen Abschnitt von 6 Metern bei 6,08% Kupfer enthält angekündigt und 631 Teilen pro Million Kobalt.
Geschäftsführer Justin Brown kommentierte: "Es ist eine fantastische Kreuzung und natürlich wir haben nur begrenzte Bohrungen so ist es schwer zu wissen, wie groß es wird kommen, aber sicherlich mit Gehalte und Mächtigkeiten von dieser Art der Tenor, es ist ziemlich aufregend." Wichtig ist, dass die Mineralisierung bleibt offen, enden in 0,46% Kupfer. Drilling etwa 300 Meter entlang des Streichens der Entdeckung Bohrloch ergab 83 Meter mit 0,43% Kupfer ab 118 Meter, einschließlich 3 Meter bei 4,15% Kupfer. Ein weiterer Impuls für das Projekt ist die Tatsache, dass die Ergebnisse für die letzten 14 Meter des Bohrlochs in der Regel wurden einer höheren Laufzeit, durchschnittlich 2,44% Kupfer, eine Erhöhung der Gesamt-Notendurchschnitt von der Entdeckung Kreuzung. Mehrere Löcher Tests separaten Aufklärung geophysikalische Ziele ergab keine signifikante Kupfer oder Kobalt Ergebnisse jedoch nicht-Kupfer-Sulfid-Mineralien vorhanden sein können und Multi-Element-Analysen, einschließlich der Elemente der Platingruppe stehen noch aus. Nur Kupfer, Kobalt und Nickel Ergebnisse wurden bisher für diese letzte Runde der Ergebnisse erhalten. Die Mineralisierung ist entlang des Streichens und in der Tiefe offen in einem von mehr als 6 km markanten Korridor. Frühere Bohrungen von Montezuma Mining 130 Meter westlich des 61 Meter bei 1,96% Kupfer Kreuzung entlang dieser Scherzone zunächst bestätigte die Anwesenheit von Kupfer-Sulfid-Mineralisierung. Die Ergebnisse umfassten 18 Meter mit 0,63% Kupfer und 859 Teilen pro Million Kobalt aus 154 Metern und 10 Metern bei 0,82% Kupfer und 581 parts per million Kobalt aus 180 Meter, einschließlich 3 Meter mit 1,94% Kupfer und 0,12% Kobalt. Montezuma Mining hat weitere Bohrungen begonnen, um die Ausrichtung der Zone zu bestätigen und die Tiefe und Streichlänge zu testen.
quelle proactivinvestor
Optionen
2
0
1
es gibt wohl weitere bohrergebnisse! ich bin gespannt..
gruß black.jack
Optionen
1
Monday, November 28, 2011 by John Phillips
Montezuma Mining Company (ASX: MZM) has been grabbing some market attention of late, and has this morning been granted a trading halt by the ASX pending the release of an announcement on the Butcherbird project, with the company's shares placed in pre-open.
Montezuma Mining has not yet elaborated on what the announcement relates to, but the company has recently been delivering some stunning intercepts from the project.
From the current reverse circulation drilling campaign highlights include 61 metres at 1.96% copper and 228 parts per million cobalt from 113 metres, and 47 metres at 1.81% copper from 113 metres, which includes 6 metres at 6.08% copper and 631 parts per million cobalt.
The market reaction to the copper results is that the stock spiked to $0.80 intra-day earlier in the month, almost three times the sub $0.30 price from October. The company last traded at $0.57 before the halt - which will last until the earlier of the announcement being made to the market, or the opening of trade on Wednesday 30 November.
google Übersetzung---------------
Montezuma Mining Company: ASX gewährt halt angemeldet butcherbird Projekt Ankündigung
Montag 28 November, 2011 von John Phillips
Montezuma Mining Company ( ASX: MZM ) wurde Grabbing einige Marktteilnehmer Aufmerksamkeit spät und hat heute Morgen ein Trading Halt durch die ASX gewährt, bis die Veröffentlichung einer Mitteilung auf der Neuntöter Projekt, mit dem Aktien der Gesellschaft in pre-open gelegt. Montezuma Mining ist noch nicht auf das, was die Ankündigung bezieht sich auf ausgearbeitete, aber das Unternehmen hat vor kurzem liefert einige atemberaubende fängt aus dem Projekt. Von der aktuellen Reverse-Circulation-Bohrprogramm Highlights zählen 61 Meter mit 1,96% Kupfer und 228 Teilen pro Million Cobalt von 113 Meter und 47 Meter bei 1,81% Kupfer aus 113 Meter, die 6 Meter auf 6,08% Kupfer und 631 Teilen pro Million Kobalt enthält. Die Reaktion des Marktes auf die Kupfer-Ergebnisse ist, dass die Aktie auf 0,80 $ innerhalb eines Tages früher im Monat aufgestockt, fast das Dreifache der sub $ 0,30 Preis ab Oktober. Das Unternehmen zuletzt bei 0,57 $, bevor der Stillstand gehandelt - das wird bis zum früheren der Ankündigung in den Markt gestellt, oder die Eröffnung des Handels am Mittwoch, 30. November letzten
Quelle proactivinvestor
Optionen
0
Optionen
2
Tuesday, November 29, 2011 by John Phillips
Montezuma Mining Company's (ASX: MZM) current reverse circulation drilling program at the Butcherbird Copper Project continues to deliver investors a string of very high grade intersections.
The latest highlights are 3 metres at 3.42% copper from 92 metres, 2 metres at 3.66% copper from 63 metres, and 2 metres at 4.74% copper from 102 metres.
The significance of the discoveries is that they have confirmed copper mineralisation associated with the Butcherbird Shear Zone over a strike of at least 250 metres, within a broader prospective corridor striking in excess of 6 kilometres within the company’s tenure.
Montezuma Mining is already planning a follow up campaign to further test the area of these high grade results.
These results follow hot on the heels from some other impressive intersections earlier in the month at Butcherbird, which included 61 metres of continuous mineralisation at 1.96% copper and 228 parts per million cobalt from 113 metres.
Other recent highlights include 47 metres at 1.81% copper from 113 metres, which includes a stunning high grade intercept of 6 metres at 6.08% copper and 631 parts per million cobalt.
google Übersetzung-----------
Montezuma Mining Company weiterhin hochgradige Kupfer-Kreuzungen auf butcherbird
Dienstag 29. November, 2011 von John Phillips
Montezuma Mining Company ( ASX: MZM ) aktuelle Reverse-Circulation-Bohrprogramm auf dem butcherbird Kupfer-Projekt weiterhin zu liefern Investoren eine Reihe von sehr hochgradige Abschnitte. Zu den aktuellen Highlights sind 3 Meter bei 3,42% Kupfer aus 92 Meter, 2 Meter von 3,66% Kupfer von 63 Meter und 2 Meter bei 4,74% Kupfer ab 102 Meter. Die Bedeutung der Entdeckungen ist, dass sie Kupfer-Mineralisierung mit dem Neuntöter Shear Zone über eine Streichlänge von mindestens 250 Metern verbunden sind, in einem breiteren potenziellen Korridor markante mehr bestätigt von 6 Kilometern innerhalb des Unternehmens Amtszeit. Montezuma Mining plant bereits ein Follow-up Kampagne, um weitere Tests im Bereich dieser hochwertigen Ergebnissen. Diese Ergebnisse folgen auf den Fersen von einigen anderen beeindruckenden Kreuzungen früher im Monat um butcherbird, davon 61 enthalten m kontinuierlicher Mineralisierung bei 1,96% Kupfer und 228 Teilen pro Million Cobalt von 113 Metern. Weitere aktuelle Highlights zählen 47 Meter mit 1,81% Kupfer ab 113 Metern, die eine atemberaubende hochgradigen Abschnitt von 6 Metern bei 6,08% Kupfer und 631 Teile pro umfasst Millionen Kobalt.
Optionen
1
29 November 2011 The Manager Companies Announcement Office ASX Limited Level 10, 20 Bond Street SYDNEY NSW 2000 OUTCOME OF ANNUAL GENERAL MEETING The Directors are pleased to advise that all resolutions detailed in the Notice of Meeting of Montezuma Mining Company Ltd issued to shareholders were passed by the requisite majority on a show of hands at the Annual General Meeting of the Company held on 29 November 2011. Listed below is a summary of the number of proxy votes cast in respect to each of the resolutions put to shareholders at the Annual General Meeting: Resolution 1. Remuneration Report 2.
Re-election of Mr John Ribbons as a Director 3. Election of Mr Seamus Cornelius as a Director 4. Approval of Grant of Options to Mr Justin Brown 5.
Approval of Grant of Options to Mr John Ribbons 6. Approval of Grant of Options to Mr Seamus Cornelius 7. Ratification of Allotment and Issue of Shares 8.
Ratification of Allotment and Issue of Options 9. Ratification of Allotment and Issue of Options For 21,225,693 21,237,293 21,237,293 21,182,436 21,182,436 21,182,436 21,236,293 21,236,293 21,236,293 Against 10,000 Nil Nil 88,407 88,407 88,407 1,000 1,000 1,000 Chairman’s Discretion 158,150 790,536 790,536 755,136 755,136 759,286 790,536 790,536 790,536 Abstain 1,600 Nil Nil Nil Nil Nil Nil Nil Nil John Ribbons Director and Company Secretary.
google Übersetzung------
Die Ergebnisse der Tagung Tue, 29 November 2011 13.56.00 1000 27 Minuten
29 November 2011 Der Manager Companies Announcement Office-ASX Ltd Level 10, 20 Bond Street Sydney NSW 2000 ERGEBNISSE DER HAUPTVERSAMMLUNG Die Direktoren beraten Sie gerne, dass alle Beschlüsse in der Einladung zur Hauptversammlung von Montezuma Mining Company Ltd detaillierte an die Aktionäre ausgegeben, indem übergeben wurden die erforderliche Mehrheit auf Handzeichen an der Hauptversammlung der Gesellschaft statt am 29 November 2011. Nachfolgend ist eine Zusammenfassung der Anzahl der Proxy-Stimmen in Bezug auf jede der vorgelegten Resolutionen Aktionären auf der Hauptversammlung Stimmen: Auflösung 1. Remuneration Report 2. Wiederwahl von Herrn John Ribbons als Director 3. Wahl von Herrn Seamus Cornelius als Direktor 4. Genehmigung der Gewährung von Optionen an Herrn Justin Brown 5. Genehmigung der Gewährung von Optionen an Herrn John Ribbons 6. Genehmigung der Gewährung von Optionen an Herrn Seamus Cornelius 7. Die Ratifizierung der Zuteilung und Ausgabe von Anteilen 8. Ratifizierung der Zuteilung und Ausgabe von Options 9. Die Ratifizierung der Zuteilung und Ausgabe von Optionen für 21.225.693 21.237.293 21.237.293 21.182.436 21.182.436 21.182.436 21.236.293 21.236.293 21.236.293 Vor 10.000 Nil Nil 88.407 88.407 88.407 1.000 1.000 1.000 Vorsitzenden Diskretion 158.150 790.536 790.536 755.136 755.136 759.286 790.536 790.536 790.536 Enthaltung 1.600 Nil Nil Nil Nil Nil Nil Nil Nil John Ribbons Director und Company Secretary.
Optionen
1
29 November 2011 The Manager Companies Announcement Office ASX Limited Level 10, 20 Bond Street SYDNEY NSW 2000 OPTION EXERCISE PRICE Montezuma Mining Company Ltd would like to advise the exercise price of Options proposed to be issued to Messrs Brown, Ribbons and Cornelius under Resolutions 4 to 6 of the Company’s Notice of Annual General Meeting has been calculated to be 80 cents. If approved by shareholders at the Annual General Meeting being held today, the proposed Options would expire on 30 November 2015 and are to be issued on the terms and conditions outlined in Annexure A of the Notice of Meeting. Yours faithfully John Ribbons Director and Company Secretary Montezuma Mining Ltd.
ABN 46 119 711 929 PO Box 910, West Perth WA 6872 Ground Floor, 31 Ventnor Ave, West Perth WA 6005 Phone: +61 8 6315 1400 Fax: +61 8 9486 7093 Website: www.montezumamining.com.au admin@montezumamining.com.au.
Optionen
1
0
Das es Leute gibt, die per Abstauberlimit einfach mal einen Versuch wagen billig reinzukommen kann ich nachvollziehen, aber werd verkauft zu solchen Kursen?
Ein Phänomen was ich nie verstehen werde. Noch krasser finde ich das allerdings bei Millennium, wo auf Tiefstkurs verkauft wurde obwohl die Aussichten die gleichen waren.
Optionen
0
Optionen
0
Erhöhung der Neuntöter Projekt Mangan Ressourcen Wed, 7 Dezember 2011 00.11.00 1000 2 Stunden, 17 Minuten
ASX RELEASE 7. Dezember 2011 ASX CODE: MZM ausgegebenen Aktien: 67.41M 52 Wochenhoch: 0,95 $ 52 Wochen Tief: 0,25 $ KONTAKT: Justin Brown Managing Director 61 438 745 675 BOARD: Seamus Cornelius: Vorsitzender Justin Brown: MD John Ribbons: Non- Exec KEY PROJECTS: Neuntöter (100%) Mangan, Kupfer PEAK HILL (85-100%) Gold Durack (Einkommen 85%) Gold, Kupfer MT Padbury (100% Gold) Gold, Mangan, Eisen 144% ERHÖHUNG butcherbird PROJECT GLOBAL MANGAN RESOURCE bis 119 Mt@11.6% Mn • Mineral Resource Schätzungen abgeschlossen für sieben zusätzliche Einlagen • Zusätzliche Inferred Resources insgesamt 70 Mio. tonnes@11.4% Mn bei 10% Mn cut-off gemeldet. • Global Inferred Mineral Resources für die butcherbird Mangan-Projekt liegt nun bei 119 Millionen tonnes@11.6% Mn auf 10% Mn cut-off, mit • Ein weiterer low grade Mineralressource von 55,9 Mio. Tonnen mit 9,3% Mn für Material mit Graden von 8 berechnet -10% Mn. Das Unternehmen freut sich darauf hinweisen, dass unabhängige Berater Snowden Mining Industry Consultants hat eine Reihe von aktualisierten Ressource-Schätzungen für die butcherbird Projekt abgeschlossen. Die Mineral Resources berichtet worden, wie im Einklang mit dem JORC Code Inferred (JORC, 2004) und die damit verbundenen Richtlinien (Tabelle 3) für sieben weitere Mangan Ablagerungen an den butcherbird Mangan-Projekt wie folgt: Klassifizierung Cut-off Deposit Bindi Bindi Hill Budgie Hills Cadgies Flats Coodamudgi Tonnen (Mt) 8,75 1,03 0,25 12,9 17,0 14,2 16,1 70,2 48,8 119,0 abgeleitete Ressource von 10% Mn Mn (% ) 11,09 10,82 11,08 11,48 10,71 12,23 11,56 11,4 11,8 11,6 KEY Aktienpositionen: AUVEX MANGAN LTD 3.750.000 FPO Aktien BUXTON RESOURCES LTD 3.760.000 FPO Aktien LITHEX RESOURCES LTD 1.525.000 FPO Aktien EXTERRA RESOURCES LTD 2.000.000 FPO Aktien Illgararie Ridge Mundawindi Richies Suche SUBTOTAL Yanneri Ridge GLOBAL TOTAL Tabelle 1: Inferred Mineral Resource Schätzungen der Neuntöter Mangan-Projekt werden auf 10% Mn geschnitten berichtet. Zusätzliche Ressourcen wurden auf einem 8% Mn für einen veredelten Mn Kornkurve Schnitt unter 35% Mn geschätzt. Diese Ressourcen fügen Sie eine weitere 55,9 Mio. tonnes@9.3% Mn auf die globale Schätzung. Diese zusätzlichen Tonnagen zu erwarten sind, um zusätzliche Flexibilität hinsichtlich der Vermischung bieten während der Produktion. Klassifizierung Cut-off Deposit Bindi Bindi Hill Budgie Hills Cadgies Flats Coodamudgi Illgararie Ridge Mundawindi Richies Suche SUBTOTAL Yanneri Ridge * GLOBAL TOTAL Ressource 8-10% Mn Tonnen (Mt) 5,7 3,5 0,2 3,6 18,5 2,1 6,6 40,1 15,8 55,9 Mn (%) 9,2 Inferred 8,9 9,1 9,5 9,2 9,4 9,4 9,3 9,4 9,3 Die extrapolierten Teile der ....
http://media.wotnews.com.au/asxann/01250724.pdf