https://hotcopper.com.au/threads/...targets-beneath-hill-800.4953526/
Hill 800 is the most advanced prospect at the Jamieson Project, with drilling to date returning outstanding widths and grades of gold and copper mineralisation from intensely altered volcanics, including:•93m @ 3.22g/t Au from 2m (0.3g/t Au cut-off), hole H8DD006, including:12m @ 5.59g/t Aufrom 2m, and31m @ 6.64g/t Aufrom 58m (1g/t Au cut-off)•49m @ 2.54g/t Au, 0.2% Cu from 143m (0.3g/t Au cut-off), hole H8DD004, including:17m @ 6.62g/t Au, 0.3% Cu from 157m (1g/t Au cut-off)•43m @ 4.24g/t Au, 0.3% Cu from 177m (0.3g/t Au cut off), hole H8DD002 including:10m @ 5.66g/t Au, 0.9% Cu from 182m and5m @ 24.1g/t Au, 0.4% Cu from 203m (1g/t Au cut off)(Downhole widths, refer Figure 11 and ASX announcement 27 May 2019 for details)
Die Bohrergebnisse waren bisher auch ganz gut, im Gegensatz zur Kursentwicklung |