#12181 und mindestens Kouga ist schon seit einiger Zeit auf der Liste hier...dennoch sinnoll darauf hinzuweisen, dass es eine Wiederholung ist...btw, passiert auf den china seiten sehr häufig das alte Beiträge mit aktuellem Datum nochmals eingestellt werden...da ist es manchmal schwer die Projekte auseinander zu halten...aber es gibt ja zum Glück auch Nutzer, die dann dankenswerterweise freundlich auf solche Dinge hinweisen, ohne gleich nach dem "Fegefeuer" zu rufen... Dank dafür 28-02-2012 - The National Energy Regulator of South Africa (NERSA) will hold public hearings at Pine Lodge on Friday, March 2 between 10am and 3pm on a number of generation licence applications by the operators of wind farms in Nelson Mandela Bay and the greater Eastern Cape. The five applicants are: Metrowind Van Stadens Wind Farm, Red Cap Kouga Wind Farm, Dorper Wind Farm, Jeffrey’s Bay Wind Farm, and Cookhouse Wind Farm....http://www.getnews.co.za/story?id=1141 13 March 2012 The Kouga renewable energy project – renewable, sustainable and community owned The R2bn Red Cap Kouga wind farm project at Oyster Bay in the Eastern Cape is expected to go into operation during the second quarter of 2014 and inject in excess of R250 million into projects that will directly benefit members of historically disadvantaged communities in the region. The wind farm, which in December 2011 was named as one of the preferred bidders in the Government’s independent power producer procurement programme, will generate 80MW of power and the first phase will consist of 32 turbines close to Oyster Bay. The Kouga Municipality’s Standing Committee on Infrastructure Planning and Development will meet on Thursday 15 March 2012 to consider Red Cap’s application to rezone the areas on which the turbines will be erected…. The German turbine manufacturer Nordex is employed to provide the 2.5MW turbines….“The Red Cap Kouga wind farm is the first step in developing a substantial proudly South African renewable energy portfolio,” says Tanton. http://www.splashpr.co.za/...enewable-sustainable-and-community-owned Thu, 15 March 2012 - Kouga wind farm project moves a step closer The development of a R2bn rand wind farm in the Kouga district has moved a step closer. The municipality's standing committee on Infrastructure Planning and Development has approved a rezoning application by the developers, Red Cap Kouga, but [b]the final nod must still come from the Kouga Council http://www.algoafm.co.za/article.aspx?id=1256 der Zeitplan im November 2011 "hope to begin construction 2012/2013"... http://www.savannahsa.com/documents/1997/...ipation%29%20combined.pdf das andere erwähnte Projekt: The Rainmaker-linked Dorper wind farm project was recently named as a preferred bidder under the renewable-energy IPP procurement pro-gramme (REIPPPP) being run by the South African Department of Energy (DoE)….. The construction of the project is due to start during July 2012, with the planned date for commercial operations being in the first half of 2014. http://www.engineeringnews.co.za/article/...n-the-pipeline-2012-01-27 Dorper Wind Farm (Pty) Ltd 01/03/2012
The Project activity is planned to be developed in five phases with a final capacity of up to 547.2 MW Phase Capacity (new) Date 1 100.8 June 2012 2 100.8 June 2013 3 100.8 June 2014 4 100.8 June 2015 5 144 June 2016 Total 547.2
Parameter Value Unit Capacity 547.2 MW ... Capacity of individual turbines 2.4 MW Number of turbines to be installed 228 turbines... Rotor diameter 95-102 meter
Parameter Value Unit Basis of assumption Wind Turbine Capacity: 2.4 MW Proposal from manufacturer No. of Wind Turbines: 228 See Environmental Impact Assessment (EIA) authorisation http://www.energy.gov.za/files/esources/kyoto/...rPDD_01March2012.pdf zu Dorper findet sich aber auch: Dec. 08, 2011 Sumitomo Corporation Sumitomo Corporation Selected as a Preferred Bidder for Wind Farm Project in South Africa http://www.sumitomocorp.co.jp/english/news/2011/20111208_120000.html , http://www.ey.com/Publication/vwLUAssets/...CAI_issue_32_Feb_2012.pdf Financial close on or prior to 30 June 2012 http://www.nersa.org.za/Admin/Document/Editor/...0%28Pty%29%20Ltd.pdf Warum iwr folgendes meldet...und Nordex wie so oft zu wenig... 09.12.2011 , 17:43 Uhr Das erste Projekt "Dorper" umfasst 40 N100 Anlagen http://www.iwr.de/wind/archiv/11/12/0909.html muss mal jeder mit sich ausmachen...
|