in 2011: 28. Febr. "has received an initial order for the installation of a 50 kW mini combined heat and power plant" + Advanced talks regarding an extensive cooperation in Northern Germany; Objective: Development of a virtual power plant with at least 20 MW by 2013. 10.Mai: "GGC Energy s.r.o., a 50% subsidiary of listed Greenvironment plc (WKN: A0YEKX / Symbol: GIV), signed a supply agreement for the delivery of a 4 MW-microturbine plant this week. The order volume amounts to 6.5 million Euro. " 02.August: "Greenvironment Plc (WKN: A0YEKX / Symbol: GIV) today announced that it has received an order for a 200 kW Capstone microturbine for natural gas including other additional components as part of a cogeneration system." 08.August: "Greenvironment GmbH, a 100% subsidiary of Greenvironment Plc (WKN: A0YEKX / Symbol: GIV) has received an order from BioEnergie Zehnebeck GmbH to build a 400 kW microturbine plant at the site of the dairy farm Zehnebeck in Gramzow." 15.August: "Greenvironment GmbH, a 100% subsidiary of Greenvironment Plc (WKN: A0YEKX / Symbol: GIV) has received an order from Convoris Blankenhain GmbH & Co KG, Leipzig, to build two 200 kW microturbine plants. 15.September: "Greenvironment GmbH, a 100% subsidiary of Greenvironment Plc (WKN: A0YEKX / Symbol: GIV) has received orders from a well-known oil and gas producer to build two 200 kW microturbine CHP plants in Germany. 2012: 19.März: "Greenvironment Plc (WKN: A1JLT1 / Symbol: GIV1) today announced that a letter of intent (LOI) for a 1.8 MW microturbine plant for natural gas including other additional components as part oa Combined Cooling, 22.März: "GGC Energy s.r.o., a 50% subsidiary of listed Greenvironment Plc (WKN: A1JLT1 / Symbol: GIV1), received an order to prepare a feasibility study for Agnella Carpet Factory S.A., Bialystok (Poland), regarding the renewal of the existing energy solution of the production process with a modern and efficient trigeneration solution based on microturbines while providing process steam at the same time 12.April: "Greenvironment GmbH, a wholly-owned subsidiary of listed Greenvironment Plc (WKN: A1JLT1 / Symbol: GIV1), delivered a 200 kW microturbine power plant with waste-gas heat exchanger and remote monitoring module to a biogas treatment plant of enercity for testing purposes.The one-year trial operation has been successfully completed...Therefore enercity used its purchase option at the end of March and ordered a 200 kW microturbine system from Greenvironment. The target is to put the new system in operation before the next heating season." Sehen alle den Unterschied? In 2011 hat Greeni Aufträge erhalten und zwar ziemlich viele...in 2012 gibt es Absichterklärungen (Letter of intends) und Machbarkeitsstudien (Feasibility Studies) - davon kann Greeni nicht leben, das sollte allen klar sein!! Mit der Augustfinanzkrise in 2011 ist auch bei Greeni die Krsie eingezogen...fast keine Aufträge mehr zwischen September 2011 und März 2012- das sind Fakten und daran ändert die QP auch nichts. Denn Greeni berichtet über jeden Messeauftritt und jede Personaländeurng - Aufträge gibts leider keine mehr zu berichten. |