Ich zitiere:
A total of 299 samples from the 12 tailings piles were obtained. Samples were obtained at random locations on the top surface of those piles from small holes excavated with an excavator and systematically at 2 meter spacings in the walls (slopes) of the piles from hand dug or excavated trenches, all at depths of 1.2 to 1.5 meters. The samples were then preserved, stored, secured, and transported following industry standard methods ….. As a next step, Prophecy intends to conduct a drilling program to determine the uniformity of tailings piles grades and a bulk sampling program for metallurgical testing to calculate metals recoveries. Further mapping has shown several additional tailings piles approximately 0.4 to 10 km away from Pulacayo, and the Company intends to conduct sampling, and if appropriate, drilling, and metallurgical testing programs to ascertain the economic viability of those piles.
Das Drillprogramm macht man wohl, um die Anleger bei Laune zu halten?
PS: Bist du wenigstens in der Lage, das Wort "additional" zu übersetzen?
Du hattest ja mein post als erbärmlich beschimpft, nur weil ich von neuen Geröllhalden schrieb. |