es geht hier um eine alte ( von PCY) Ausschreibung für EPC Contractor:
Project Name : Mongolia: Chandgana Mine-Mouth Power Plant project Project Background : Project Cost: US $744 Million Project Start:2013 Project End: April 2017
A positive feasibility study for its 600 megawatt (MW) Chandgana Mine-Mouth power plant project in central Mongolia, to be built next to the company%s Chandgana Tal coal deposit.
Construction of the power plant project is planned to start in April 2013, with the first 150 MW unit being commissioned in October 2015. The remainder of the units are to be rolled out in April 2016, October 2016, and April 2017.
With proper maintenance, the project is estimated to have 30 years of commercial operation.
Under the feasibility study, coal will be supplied by the Chandgana Tal deposit, which contains 140 million tonnes of measured coal, at a steady rate of 2.7 million tonne per year, with the delivered coal price set at $15.50/t with a 2 percent semi-annual price increase. The electricity tariff is targeted at US $0.06/kWh, with a 2 percent semi-annual increase.
The plant%s power production cost is currently estimated at US $0.023/kWh, including coal. Capital recovery, including loan principal and interest payments, is estimated to be US $0.025/kWh.
Capital cost is projected to be US $744 million for the 600MW project, or US $1,240 per kW. This includes the power plant, overhead transmission lines, and administrative costs, but excludes mine development costs. Goods and Services to be purchased: Project Status/Update N.A Project Location Mongolia Commencement Date -- Expected Completion Date Jan 1970 Project Value Not Provided Project Sector Energy, Power and Electrical, Non-Renewable Energy, Consultancy, Infrastructure and construction Project Ref No. 10412702 Last Updated On 18 January 2012
Contacts CLIENT PROPHECY COAL CORP Mongolia Tel : 976.11.331669 Fax : 976.11.312721 E-Mail: info@prophecycoal.com
|