"To date, a total of 17 RC drill holes totaling 6,767 metres (22,200 feet) and five diamond core holes totaling 2,217 metres (7,274 feet) have been completed at Kinsley Mountain. At the Bolo Gold Project, 10 RC drill holes totaling 3,054 metres (10,020 feet) have been completed. During 2020 New Placer Dome has drilled a combined total of 32 RC and diamond core holes totaling over 12,000 metres (approximately 40,000 feet) from its Nevada gold projects. Sample preparation is complete and assay results are expected shortly from four Bolo gold project RC drill holes (BL20-02 through BL20-05) totaling 1,033 metres. A further 1,147 Bolo gold project samples from five RC drill holes (BL20-06 through BL20-10) totaling 1,542 metres will be shipped from Nevada this week to the ALS Geochemistry laboratory in North Vancouver."
Der fast 70prozentige Abverkauf vom Juli-Hoch erscheint mir völlig übertrieben. Bis Jahresende sollte zumindest der Newsflow stimmen. |