"The field season in the Snettisham region extends from April through to September. While it is possible to drill during the winter, it becomes very inefficient when drilling shorter holes. A two phase, exploration program is proposed to complete the drilling necessary to confirm a CIM and NI 43-101 compliant inferred (and possibly indicated) mineral resource in the Snettisham area. If chemical analysis results are favourable, then further drilling at closer spacing will be required to identify a measured or indicated resource." Jetzt wird mir der Plan ein wenig klarer. AWS plant einen abgespeckten NI-43-101 konformen Bericht, in dem eine "vermutete" (inferred) Resource definiert werden soll. Dafür braucht man dann auch weniger Bohrlöcher und der finanzielle Rahmen könnte passen, Nachteil einer "inferred resource": "Inferred Mineral Resource is defined as a mineral resource inferred from geo-scientific evidence, drill holes, underground openings, or other sampling procedures where the lack of data is such that continuity cannot be predicted with confidence and where geo-scientific data may not be known with a reasonable level of confidence." (http://www.miningiq.com/glossary/inferred-mineral-resource/#VRC) Um die Ressourcenschätzung wasserdicht zu machen, müssen dann erheblich mehr Löcher gebohrt werden. Erst dann kann eine vorläufige wirtschaftliche Machbarkeitsstudie folgen - danach dann die Bankenstudie und darauf folgende die endgültige wirtschaftliche Machbarkeitsstudie, in der dann auch die tatsächlichen Kapitalkosten Berücksichtigung finden werden. Wie war das, mav? Ende 2013 die erste Mio Tonnen? |