Adex Basisinfos

Seite 1 von 1
neuester Beitrag: 25.04.21 01:31
eröffnet am: 01.07.08 14:05 von: Ölmaus Anzahl Beiträge: 20
neuester Beitrag: 25.04.21 01:31 von: Antjeswywa Leser gesamt: 9325
davon Heute: 7
bewertet mit 1 Stern

01.07.08 14:05
1

1575 Postings, 7617 Tage ÖlmausAdex Basisinfos

Hallo,

habe gerade bei w:o einige interessante Infos zu diesem Unternehmen Adex Mining (WKN A0mXC1)gefunden. Weiß einer noch mehr?

weitere Infos hier:

http://www.rohstoffwelt.de/aktien/profil.php?mid=1228#Adex-Mining-Inc.


Unternehmensprofil:

Kurzinfo

Branche: Bergbau und Metalle
Handelsplatz: TSX Venture Exchange, Frankfurt am Main
Symbol, WKN: ADE / A0MXC1
Ausgegebene Aktien: 74.459.015*
Marktkapitalisierung: 38,7 Mio. CAD*
Cash und Äquivalente: rund 7 Mio. CAD*

* Stand: zum 11. Dezember 2007


Adex Mining Inc. ist ein aufstrebendes, kanadisches Bergbauunternehmen, das sich darauf konzentriert, sein wichtigstes Projekt, Mount Pleasant, in Charlotte County, New Brunswick, schnellstmöglich voran zu treiben. Das Unternehmen wird von einem erfahrenen und technisch äußerst beschlagenen Management-Team geleitet.

Die Liegenschaft Mount Pleasant umfasst 102 äußerst aussichtsreiche Grubenfelder, die sich über rund 1.600 Hektar erstrecken. Diese Konzessionen enthalten äußerst viel versprechende Wolfram-Molybdän- und Zinn-Indium-Mineralisierungen.

Die Fire Tower-Zone der Liegenschaft enthält ein Bestimmung 43-101 konformes, berechnetes Vorkommen von 13.074.438 Tonnen Wolfram-Molybdän bei einem Gehalt von 0,35% Wolframoxid und 0,21% Molybdändisulfid. Von den North- und Deep-Zinnzonen liegen Berichte über ein nicht 43-101 konformes, historisches Gesamtvorkommen von 3.645.429 Tonnen Zinn-Indium mit einem Gehalt von 0,802% Zinn und 107 ppm (parts per million) Indium vor, die auf einer Machbarkeitsstudie basieren, welche 1997 von Kvaerner Metals Davy Ltd. fertig gestellt wurde.

Anfang der 1980er bestand auf der Mount Pleasant Liegenschaft eine aktive Wolfram-Mine, die von Billiton Exploration Canada Ltd. betrieben wurde. Diese Mine wurde jedoch 1985 auf Grund der stark gesunkenen Metallpreise geschlossen. Adex erwarb die Mount Pleasant-Mine 1995 und führte vorläufige Explorationsarbeiten an den Zinn-Indium-Vorkommen der Liegenschaft durch, unter anderem die bereits erwähnte Machbarkeitsstudie, die von Kvaerner Metals angefertigt wurde. 1997 war Adex jedoch gezwungen, die Liegenschaft auf Grund fallender Metallpreise und der unsicheren Lage in der Bergbaubranche vorübergehend stillzulegen.

Heute hat sich die Perspektive der Branche enorm verbessert, was das wirtschaftliche Potenzial des Projekts erheblich steigert. Die Nachfrage nach Wolfram, Molybdän, Zinn und Indium ist auf Grund des schnellen Wachstums in den Schwellenländern und der Einführung neuer Technologien stark gestiegen. Entsprechend sind die Preise für alle vier Metalle in den letzten Jahren geradezu explodiert.

Angesichts dieser neuen Perspektiven traf Adex im Sommer 2007 die Entscheidung, das Mount Pleasant-Projekt zu reaktivieren. Das Unternehmen arbeitet daran, die Liegenschaft schnell zu entwickeln, um in möglichst kurzer Zeit das Ziel der aktiven Produktion zu erreichen. Die Entwicklungsarbeiten umfassen unter anderem ein Bohrprogramm, um das Ausmaß der Mineralisierungen auf der Mount Pleasant-Liegenschaft genauer zu umreißen. Gleichzeitig nimmt das Unternehmen eine metallurgisches Testprogramm in Angriff, um die für eine wirtschaftlich sinnvolle Förderung notwendigen Prozesse zu etablieren.

Darüber hinaus arbeitet Adex daran, die bereits auf der Mount Pleasant-Mine vorhandene Infrastruktur auf den neuesten Stand zu bringen. Diese umfasst eine Abraumhalde, gut erhaltene Gebäude und Verarbeitungsausrüstung. Die Kosten für die Instandsetzung der vorhandenen Infrastruktur sind im Vergleich zu den Kosten, die anfielen, wollte man eine solche Infrastruktur von Grund auf neu errichten, gering - was für Adex eine erhebliche Senkung des Kapitalaufwands bedeutet, sollten Machbarkeitsstudien die wirtschaftliche Entwicklungsfähigkeit der Mine bestätigen.

Adex wird von President und CEO Kabir Ahmed (LLB, MBA) geleitet, einem erfahrenen Wertpapieranwalt, der bereits mehrere aufstrebende Bergbauunternehmen gegründet und auf den Erfolgsweg geführt hat; darunter NWT Uranium Corp. (TSX-V: NWT) und Southampton Ventures Inc. (TSX-V: SV).

Herr Ahmed wird von Errol Farr (CMA) unterstützt, der umfassende Erfahrungen im Bereich Corporate Finance mitbringt und die Rolle des Chief Financial Officers und Direktors bei Adex einnimmt.

Das technische Team von Adex wird von William B. Burton (Geologe und Direktor), J. Dean Thibault (Ingenieur chemische Prozesse/Projektmanager für Hüttenwesen und Planung in Umweltfragen) und Dr. Trevor Boyd (PhD, PGeo, Geologieberater) geleitet.
 

02.07.08 16:23

220 Postings, 6500 Tage SergioHHAktuelle News Adex!

Hab was Interessantes und Aktuelles zu dem Unternehmen gefunden!


ADEX MINING INC. ENGAGES LEADING GLOBAL ENGINEERING FIRM TO COMPLETE SCOPING STUDY AT MOUNT PLEASANT

Adex Mining Inc. has contracted Aker Metals, a division of Aker Solutions Canada Inc., to conduct a scoping study on the Fire Tower Zone of Adex's wholly-owned Mount Pleasant Mine property in southwestern New Brunswick, Canada. An important step in assessing the economic potential of the Fire Tower Zone's tungsten-molybdenum mineralization, the scoping study will be undertaken in compliance with National Instrument 43-101 technical requirements. The study was commenced on June 30, 2008 and a site visit to the Mount Pleasant Mine property on July 3, 2008 has been scheduled by Aker Solutions. The scoping study is expected to be completed in approximately 12 to 14 weeks.

"The scoping study is a key step forward for Adex that will greatly assist us in our efforts to fast-track mine development at the Mount Pleasant Mine property, with a view to resuming active production," said Kabir Ahmed, President and CEO of Adex Mining. "The study will provide Adex's management team with an important decision-making tool in preparation for definitive feasibility work at the property. We are very pleased to have an organization of Aker Solutions' calibre and track record working with us on this project."

The scoping study is designed to generate capital and operating cost estimates for the Fire Tower Zone at a scoping level of definition. In support of these cost estimates, the study is to include a process equipment list, process building major equipment layout, proposed tailings management systems and projected additional site infrastructure needs, as well as a number of other deliverables. Information in the scoping study is designed to be suitable for inclusion, in summarized form, in a National Instrument 43-101-compliant technical report.

A positive indication from the scoping study would assist Adex in determining the viability of proceeding with a full feasibility study on the Mount Pleasants Mine property, which would be an important step towards the resumption of active mining. In addition, a positive indication would assist the Company in planning for any necessary financing in preparation for feasibility work, and in placing orders for equipment for timely delivery ahead of the commencement of feasibility activities.

The property's Fire Tower Zone contains a National Instrument 43-101-compliant inferred resource of 13,074,438 tonnes at 0.35% tungsten oxide (WO3) and 0.21% molybdenum disulphide (MoS2). In the early 1980s, Billiton Exploration Canada Ltd. invested over $150 million in the construction of a tungsten mine and mill at Mount Pleasant's Fire Tower Zone. The facility was active from 1983 to 1985, milling 990,200 tonnes of tungsten ore at a grade of 0.35%. Difficult economic conditions and a downturn in the price of tungsten led to the mine's closure in 1985.

Existing infrastructure of the Mount Pleasant Mine property includes a tailings pond and well-preserved surface facilities, such as ore storage areas, conveyor galleries, warehouse space and office space. The cost of upgrading the existing infrastructure at the Mount Pleasant Mine property is inexpensive relative to the cost of constructing such infrastructure from zero, meaning material reductions to Adex's capital costs if feasibility studies indicate that the property is economically viable.

ABOUT AKER SOLUTIONS:

Until recently known as Aker Kvaerner, Aker Solutions is a leading global provider of engineering and construction services, technology products and integrated solutions. The businesses within Aker Solutions comprise several industries, including Oil & Gas, Refining & Chemicals, Mining & Metals and Power Generation. The Aker Solutions group is organized in a number of separate legal entities. Aker Solutions is used as the common brand/trademark for most of these entities. The parent company in the group is Aker Solutions ASA. Aker Solutions has aggregated annual revenues of approximately NOK 50 billion and employs approximately 23,000 people in about 30 countries. With its Metals Headquarters based in Santiago, Chile, Aker Solutions has other Metals offices located in Toronto, Canada; Tucson, Arizona, U.S.A.; combined with regional metals capabilities in Perth, Brisbane, and Melbourne, Australia; Mumbai, India and Stockton-on-Tees, U.K. The Metals Division of Aker Solutions provides global capability to serve its clients across the full project cycle from studies through to design engineering, procurement, construction, commissioning and startup. Specialized expertise spans: precious metals, nickel, copper, molybdenum, iron ore, zinc, uranium, evaporites and industrial minerals.

© 2008 Canjex Publishing Ltd.  

02.07.08 17:45

1575 Postings, 7617 Tage Ölmausauf deutsch:

sehr gut, immer einen Schritt nach dem nächsten.
D.h. dann im Herbst die Ergebnisse und dann gehts
vielleicht direkt los mit der Machbarkeitsstudie!

Adex Mining Inc.: Adex Mining engagiert weltweit führende Ingenieursfirma für Scoping-Studie auf Mount Pleasant-Liegenschaft

Adex Mining Inc. / Strategische Unternehmensentscheidung

Veröffentlichung einer Corporate News, übermittelt durch die DGAP - ein
Unternehmen der EquityStory AG.
Für den Inhalt der Mitteilung ist der Emittent / Herausgeber verantwortlich.
--------------------------------------------------

Toronto, 2. Juli 2008 – Adex Mining Inc. ('Adex' oder das 'Unternehmen')
(WKN A0MXC1 / ISIN CA0069032070) ist erfreut bekannt zu geben, dass man
Aker Metals, eine Tochter der Aker Solutions Canada Inc. ('Aker
Solutions'), damit beauftragt hat, eine Scoping-Studie der Fire Tower-Zone
auf Adex’ 100%-iger Minenliegenschaft Mount Pleasant im Südwesten von New
Brunswick, Kanada, durchzuführen. Diese Studie, die ein wichtiger Schritt
bei der Evaluierung des wirtschaftlichen Potenzials der
Wolfram-Molybdän-Mineralisierung der Fire Tower-Zone ist, wird in
Übereinstimmung mit den technischen Anforderungen der nationalen Vorgabe
43-101 vorgenommen. Die Studie wurde am 30. Juni 2008 in Angriff genommen
und für den 3. Juli 2008 hat Aker Solutions einen Besuch der Mount
Pleasant-Mine veranschlagt. Man geht davon aus, die Studie in rund 12 bis
14 Wochen abschließen zu können.

'Die Scoping-Studie ist ein äußerst wichtiger Schritt für Adex, der uns
sehr helfen wird, die Entwicklung der Mine auf der Mount
Pleasant-Liegenschaft schnell voranzutreiben, um unser Ziel der
Wiederaufnahme der aktiven Produktion zu erreichen', sagte Kabir Ahmed,
President und CEO von Adex Mining. 'Die Studie wird dem Management-Team von
Adex eine wichtige Entscheidungshilfe in der Vorbereitung der endgültigen
Machbarkeitsarbeiten auf dem Grundstück sein. Wir sind hocherfreut, dass
wir ein Unternehmen vom Kaliber von Aker Solutions mit seiner
ausgezeichneten Erfolgsgeschichte für die Arbeit an diesem Projekt gewinnen
konnten.'

Die Scoping-Studie soll Schätzungen der Kapital- und Betriebskosten für die
Fire Tower-Zone erstellen. Zur Unterstützung dieser Kostenschätzungen soll
die Studie Listen zu der nötigen Verarbeitungsausrüstung, die Prozesskosten
für die Errichtung größeren Equipments, der notwendigen
Abraummanagementsysteme und verschiedener Infrastrukturbedürfnisse des
Projekts sowie weiterer durchzuführender Arbeiten umfassen. Die in der
Studie enthaltenen Informationen sollen für die Einbindung, in
zusammengefasster Form, in einen technischen Bericht gemäß nationaler
Vorgabe 43-101 geeignet sein.

Eine positive Indikation aus der Scoping-Studie würde Adex Mining helfen,
die Durchführbarkeit einer vollen Machbarkeitsstudie für das Mount
Pleasant-Grundstück zu bestimmen, was ein wichtiger Schritt hin zu einer
Wiederaufnahme des Abbaus wäre. Darüber hinaus würde eine positive
Indikation dem Unternehmen helfen, möglicherweise notwendige Finanzierungen
zur Vorbereitung der Arbeiten für eine Machbarkeitsstudie zu planen, und
rechtzeitig die Aufträge für die nötigen Gerätschaften zu erteilen, bevor
die Arbeiten für die Machbarkeitsstudie beginnen.

Die Fire Tower-Zone der Liegenschaft enthält ein gemäß Bestimmung 43-101
konformes, berechnetes Vorkommen von 13.074.438 Tonnen Wolfram-Moybdän bei
einem Gehalt von 0,35% Wolframoxid (WO3) und 0,21% Molybdändisulfid (MoS2).
Anfang der 1980er investierte Billiton Exploration Canada Ltd. mehr als 150
Millionen Dollar in die Errichtung einer Wolframmine und Mühle auf der Fire
Tower-Zone von Mount Pleasant. Die Anlage war von 1983 bis 1985 aktiv und
mahlte 990.200 Tonnen Wolframerz bei einem Gehalt von 0,35%. Schwierige
wirtschaftliche Bedingungen und ein Verfall der Wolframpreise führten 1985
zur Schließung der Mine.

Die bereits vorhandene Mineninfrastruktur – unter anderem Gebäude,
Verarbeitungsausrüstung und ein Abraumplatz (der zurzeit ausgebaut wird) -
wird Adex’ Kapitalaufwand erheblich senken, wenn Machbarkeitsstudien die
Entwicklungsfähigkeit der Mine bestätigen.

Über Aker Solutions:

Aker Solutions, bis vor Kurzem als Aker Kvaerner bekannt, ist ein weltweit
führender Anbieter von Ingenieurs- und Bauservices, Technologieprodukten
und integrierten Lösungen. Die Geschäftsbereiche, die Aker Solutions
abdeckt, umfassen mehrere Branchen, darunter Öl & Gas, Raffinerie &
Chemikalien, Bergbau & Metalle und Stromerzeugung. Die Aker
Solutions-Gruppe besteht aus einer Reihe von eigenständigen Einheiten. Aker
Solutions wird für die meisten dieser Einheiten als Marke genutzt. Das
Dachunternehmen der Gruppe ist Aker Solutions ASA. Aker Solutions hat
jährliche Gesamtumsätze von rund 50 Milliarden Norwegischen Kronen und
beschäftigt ungefähr 23.000 Angestellte in rund 20 Ländern. Das
Hauptquartier der Abteilung Metalle liegt in Santiago, Chile, doch Aker
Solutions verfügt auch über andere Metallniederlassungen in Toronto,
Kanada; Tucson, Arizona, U.S.A., sowie regionale Kapazitäten im Bereich
Metalle in Perth, Brisbane und Melbourne, Australien, Mumbai, Indien und
Stockton-on-Tees, im Vereinigten Königreich. Die Abteilung Metalle von Aker
Solutions verfügt weltweit über die Kapazitäten, seinen Kunden über den
gesamten Projektzyklus hinweg zur Seite zu stehen, von Studien bis hin zum
Ingenieurswesen, Beschaffung, Bau, Inbetriebnahme und Betrieb.
Spezialisierte Expertise umfasst: Edelmetalle, Kupfer, Nickel, Molybdän,
Eisenerz, Zink, Uran, Salzgesteine und Industriemetalle.

Über Adex:

Adex Mining Inc. ist ein junges, aufstrebendes Bergbauunternehmen aus
Kanada mit einem erfahrenden Managementteam. Das Unternehmen konzentriert
sich auf die Entwicklung seines Flagschiffprojekts, der Mount
Pleasant-Liegenschaft, einem Multimetallprojekt, auf dem vielversprechende
Wolfram-Molybdän- und Zinn-Indium-Zinkmineralisierungen zu finden sind. Die
Mount Pleasant-Minenliegenschaft liegt in Charlotte County, New Brunswick,
knapp 80 Kilometer südlich von Fredericton, der Provinzhauptstadt, und rund
65 Kilometer von der Grenze zu den Vereinigten Staaten entfernt. Die Aktien
des Unternehmens werden am TSX Venture Exchange mit dem Symbol 'ADE' und in
Frankfurt mit der WKN A0MXC1 gehandelt.

Keine Wertpapier- oder andere Behörde hat den Inhalt dieser
Pressemitteilung genehmigt oder abgelehnt.

Der TSX Venture Exchange übernimmt keine Verantwortung für die
Angemessenheit oder Fehlerfreiheit dieser Pressemitteilung.

Kontakt::

Adex Mining Inc.
Kabir Ahmed
President, Chief Executive Officer und Director
+1-866-508-2339 oder +49 40 41 33 09 50
Email: investorrelations@adexmining.com
Homepage: www.adexmining.com

Vorausschauende Aussagen

Bestimmte Aussagen in dieser Pressemitteilung könnten so genannte
Vorausschauende Aussagen darstellen, die bekannte und unbekannte Risiken,
Unsicherheiten und andere Faktoren beinhalten, die dazu führen könnten,
dass die tatsächlichen Ergebnisse, die Performance oder Erfolge von Adex,
seiner Tochtergesellschaften oder der Branche, in der diese tätig sind,
substanziell von zukünftigen Ergebnissen, Performance oder Erfolgen
abweichen können, die durch solche zukunftsorientierte Aussagen ausgedrückt
oder impliziert werden. Wenn in dieser Pressemitteilung die Worte
'schätzen', 'glauben', 'erwarten', 'vorhaben', 'davon ausgehen', 'planen',
'könnte', 'sollte', 'werden', deren negative Form oder andere Variation
derselben Worte oder vergleichbare Terminologie genutzt wird, sollen diese
solche vorausschauenden Aussagen identifizieren. Solche Aussagen spiegeln
die derzeitigen Erwartungen des Managements von Adex in Bezug auf
zukünftige Ereignisse basierend auf den derzeit verfügbaren Informationen
wieder und unterliegen Risiken und Unsicherheiten, die dazu führen könnten,
dass die tatsächlichen Ergebnisse, Performance oder Leistungen substanziell
von jenen abweichen, die in diese zukunftsorientierten Aussagen ausgedrückt
oder impliziert werden. Diese Risiken und Unsicherheiten werden von Zeit zu
Zeit, darin ohne Einschränkung eingeschlossen, unter der Überschrift
'Risikofaktoren' in den Berichten, die Adex bei der Alberta, British
Columbia und Ontario Securities Commissions einreicht, die unter
www.sedar.com eingesehen werden können, und auf die wir die Leser dieser
Pressemitteilung, die mehr über Adex, seine Aussichten sowie die Risiken
und Unsicherheiten erfahren möchten, hinweisen. Es kann geschehen, dass von
Zeit zu Zeit neue Risikofaktoren entstehen und es ist dem Management nicht
möglich, all diese Risikofaktoren oder das Ausmaß, in dem diese Faktoren
allein oder in Kombination dazu führen könnten, dass die tatsächlichen
Ergebnisse, Performance und Leistungen von Adex substanziell anders
ausfallen können, als in den vorausschauenden Aussagen dargestellt. Obwohl
die vorausschauenden Aussagen in dieser Pressemitteilung darauf basieren,
was das Management zu diesem Zeitpunkt für vernünftige Annahmen hält, kann
Adex Investoren nicht versichern, dass die tatsächlichen Ergebnisse mit
diesen vorausschauenden Aussagen übereinstimmen werden. Angesichts dieser
Risiken und Unsicherheiten, sollten Investoren nicht übermäßig auf
vorausschauende Aussagen als eine Vorhersage tatsächlicher Ergebnisse
vertrauen.

Die zukunftsorientierten Informationen in dieser Pressemitteilung sind nur
zum Erscheinungsdatum dieser Pressemitteilung aktuell. Adex unternimmt
nichts und übernimmt keine Verpflichtung, Änderungen an diesen
vorausschauenden Aussagen zu veröffentlichen, um Ereignissen oder Umständen
gerecht zu werden, die nach diesem Datum liegen, oder um nicht zu
erwartende Ereignisse dazustellen.

Die Ausgangssprache, in der der Originaltext veröffentlicht wird, ist die
offizielle und autorisierte Version. Übersetzungen werden zur besseren
Verständilichkeit mitgeliefert. Nur die Sprachversion, die im Original
veröffentlicht wurde, ist rechtsgültig. Gleichen Sie deshalb Übersetzungen
mit der originalen Sprachversion der Veröffentlichung ab.


Adex Mining Inc.
Kabir Ahmed
President, Chief Executive Officer und Director
+1-866-508-2339 oder +49 40 41 33 09 50
Email: investorrelations@adexmining.com
Homepage: www.adexmining.com


02.07.2008  Finanznachrichten übermittelt durch die DGAP
 

21.07.08 13:52

1575 Postings, 7617 Tage ÖlmausCEO Interview Adex

25.07.08 13:58

220 Postings, 6500 Tage SergioHHAdex-News!

Adex Mining engagiert führende Ingenieursfirma, um NI 43-101-konformetechnische Berichte für Mount Pleasant abzuschließen
10:00 25.07.08

Toronto, 24. Juli 2008 Adex Mining Inc. ('Adex' oder 'das Unternehmen')
(WKN: A0MXC1, ISIN: CA0069032070) gibt bekannt, dass man Watts, Griffis and
McOuat Limited ('WGM') engagiert hat, um aktuelle Schätzungen der
Erzressourcen des Unternehmens und National Instrument 43-101-konforme ('NI
43-101') technische Berichte für die Fire Tower-Zone (Wolfram-Molybdän) und
die North-Zone (Zinn-Indium) der Mount Pleasant-Minenliegenschaft (Mount
Pleasant) im Südwesten der Provinz New Brunswick, Kanada, zu erstellen.
Zweck des Engagements von WGM zur Erstellung der Berichte ist es,die
Schätzungen der Erzressourcen der zwei Zonen in die NI 43-101-konforme
Kategorie 'angezeigt' zu überführen und das Unternehmen dabei zu
unterstützen, die Machbarkeitsphase der Arbeiten auf Mount Pleasant
vorzubereiten.

WGM stellt zurzeit zwei von einander unabhängige NI 43-101-konforme
technische Berichte zur Fire Tower-Zone und der North-Zone fertig, um die
jeweiligen geschätzten Erzressourcen von einander getrennt zu halten und
Verzögerungen bei der Fertigstellung der Berichte zu vermeiden. Die beiden
Berichte werden Daten aus dem laufenden Explorationsbohrungsprogramm 2008
des Unternehmens enthalten, das umfassende Testbohrungen sowohl in der
Tower-Zone als auch der North-Zone umfasst.

Die Fire Tower-Zone war der Fokus der NI 43-101-konformen 'Technical Review
of the Mount Pleasant Property, Including a Mineral Resource Estimate for
the Fire Tower Zone Southwestern New Brunswick' vom 1. August 2006 (der
'2006 Fire Tower-Zone-Bericht') die von Paul Dunbar, M.Sc., P.Geo., Senior
Associate Geologist, Andrew Hara, P.Eng., Senior Associate Mining Engineer,
Robert de l’Etoile, M.Sc., P.Eng., Senior Associate Engineer, und Dorota A.
El-Rassi, M.Sc., P.Eng., Geological Engineer bei WGM und Dr. Trevor Boyd,
Ph.D., P.Geo., Unabhängiger Berater, fertig gestellt wurde, der auf at
www.sedar.com zur Verfügung steht.

Der neue technische Bericht zur Fire Tower-Zone wird den '2006 Fire Tower
Zone-Bericht' auf den neuesten Stand bringen. Damals meldete der Bereicht
eine 'geschlussfolgerte' Ressource von 13.074.438 Tonnen bei 0,35 %
Wolframoxid und 0,21 % Molybdändisulfid.

Die North-Zone und die Deep Tin-Zone enthalten laut einer
Machbarkeitsstudie, die 1997 von Kvaerner Metals erstellt wurde, eine nicht
NI 43-101-konforme historische Gesamtressource von 3.645.429 Tonnen bei
0,80 % Zinn, 107 Teile pro Million Indium, 0,87 % Zink und 0,19 % Kupfer.
Der neue technische Bericht zur North-Zone wird eine neue, 43-101-konforme
Ressourcenschätzung zur Verfügung stellen.

Die oben erwähnten historischen Schätzungen zur North-Zone und Deep
Tin-Zone wurden noch vor der Implementierung von NI 43-101 erstellt. Eine
qualifizierte Person hat noch keine ausreichenden Arbeiten durchgeführt, um
diese historischen Schätzungen gemäß der NI 43-101-Standards der Standatds
des Canadian Institute of Mining, Metallurgy and Petroleum Definition zu
klassifizieren und Adex behandelt diese historischen Schätzungen nicht als
aktuelle Ressourcenschätzungen gemäß NI 43-101.
Sie werden vorgestellt, da Adex sie als relevent und von historischer
Bedeutung ansieht. Sie sollten nicht auf diese historischen Schätzungen
vertrauen.

'Die Anpassung und Aktualisierung der Schätzungen der Erzressourcen für
Mount Pleasant stellt einen weiter, wichtigen Schritt in Adex schneller
Vorgehensweise bei der Überführung des Projekts in die Machbarkeitsphase,
was uns nun erlaubt, unsere Optionen in Bezug auf die Entwicklung und die
Aufnahme der Produktion einzuschätzen,' sagte Kabir Ahmed, President und
CEO von Adex. 'WGM hat bereits Erfahrung mit Mount Pleasant, da sie den
'2006 Fire Tower Zone-Bericht' erstellt haben und wir freuen uns darauf,
wieder mit ihnen zusammen zu arbeiten und diese viel versprechenden ersten
Befunde auszubauen.'

Seit März 2008 hat Adex insgesamt 22 Bohrlöcher auf Mount Plesant fertig
gestellt, die  ungefähr 7.400 Meter umfassen. Die Ergebnisse aus den ersten
drei Bohrlöchern des Programms wurden bereits in der Pressemitteilung des
Unternehmens vom 9. Juni 2008 und 7. Juli 2008 vorgestellt. Die Ergebnisse
der Proben der anderen 19 Bohrlöcher stehen noch aus sowie die Ergebnisse
zusätzlicher Aufspaltungen und Kernproben von 16 historischen Bohrlöchern.

Seit seiner Gründung 1962 hat WGM die Bergbaubranche unterstützt, indem man
Projekte in mehr als 120 Ländern abgeschlossen hat. Erfolgreiche,
technische Due Diligence-Prüfungen, Ressourcen- und Reservenschätzungen und
Prüfungen, Bewertungen, Minenplanung, ingenieurstechnische und
metallurgische Untersuchungen haben alle zum exzellenten Ruf des
Unternehmens beigetragen. Diese Studien wurden für Regierungen, Banken,
Bergbauunternehmen, Rechtsanwaltskanzleien und internationale
Finanzinstitutionen durchgeführt. Weitere Informationen zu WGMs
Dienstleistungen und Erfahrung finden sie auf der Website von WGM unter
www.wgm.ca.

Über Adex:
Adex Mining Inc. ist ein junges, aufstrebendes Bergbauunternehmen aus
Kanada mit einem erfahrenden Managementteam. Das Unternehmen konzentriert
sich auf die Entwicklung seines Flagschiffprojekts, der Mount
Pleasant-Liegenschaft, einem Multimetallprojekt, auf dem vielversprechende
Wolfram-Molybdän- und Zinn-Indium-Zinkmineralisierungen zu finden sind. Die
Mount Pleasant-Minenliegenschaft liegt in Charlotte County, New Brunswick,
knapp 80 Kilometer südlich von Fredericton, der Provinzhauptstadt, und rund
65 Kilometer von der Grenze zu den Vereinigten Staaten entfernt. Die Aktien
des Unternehmens werden am TSX Venture Exchange mit dem Symbol 'ADE' und in
Frankfurt mit der WKN A0MXC1 gehandelt.

Keine Wertpapier- oder andere Behörde hat den Inhalt dieser
Pressemitteilung genehmigt oder abgelehnt.

Der TSX Venture Exchange übernimmt keine Verantwortung für die
Angemessenheit oder Fehlerfreiheit dieser Pressemitteilung.

Kontakt::
Adex Mining Inc.
Kabir Ahmed
President, Chief Executive Officer and Director
+1-866-508-2339
Email: investorrelations@adexmining.com
Homepage: www.adexmining.com  

31.07.08 15:23

220 Postings, 6500 Tage SergioHHAdex wieder super Bohrergebnisse

Adex' Bohrergebnisse auf Mount Pleasant beinhalten weitere, hochgradige
Indium-, Zinkschnittpunkte

Toronto, 31. Juli 2008 - Adex Mining Inc. ('Adex' oder 'das Unternehmen')
(WKN A0MXC1, ISIN CA0069032070 ) gibt die Ergebnisse des vierten, sechsten
und siebten Bohrloches (AM-08-04, AM-08-06 und AM-08-07) des
Diamantkernbohrprogramms 2008 auf der Minenliegenschaft Mount Pleasant im
Südwesten von New Brunswick, Kanada, bekannt. Darüber hinaus gibt Adex
bekannt, dass die aktualisierten Ergebnisse aus der Überprüfung von vier
Proben mit überaus hohem Indiumgehalt (mehr als 1.000 Teile pro Million
('ppm')) aus dem bereits gemeldeten Bohrloch AM-08-03 nun verfügbar sind.
Die Ergebnisse dieser vier vertikalen Bohrungen aus Kernproben der Deep
Tin-Zone der Liegenschaft beinhalten eine Reihe von signifikanten
Indium-Spuren.

'Das Bohrtestprogramm 2008 von Adex auf Mount Pleasant ergibt auch
weiterhin ermutigende Ergebnisse', sagte Kabir Ahmed, President und CEO von
Adex Mining. 'Diese Arbeiten werden uns entscheidend dabei helfen,
aktualisierte Erzressourcenschätzungen für Mount Pleasant zu erstellen, was
wiederum einen wichtigen Schritt in der schnellen Überführung des Projekts
in die Machbarkeitsphase der Entwicklung darstellt.'

Die Ergebnisse aus der Bohrung AM-08-03 wurden nach oben korrigiert und
zeigen nun, dass die 198-Meter-Schnittfläche des Bohrlochs, von 12 bis auf
210 Meter Tiefe, die bereits in der Pressemitteilung des Unternehmens vom
7. Juli 2008 besprochen wurde, im Durchschnitt einen Gehalt von 258 Gramm
pro Tonne (g/t) Indium aufweist, wobei der 18-Meter-Abschnitt von 63 auf 81
Meter 1.920 g/t Indium enthält.

Die Ergebnisse der Bohrungen AM-08-04 und AM-08-07 enthalten jeweils zwei
Proben von äußerst hohem Indiumgehalt (mehr als 1.000 ppm). Diese Proben
werden neu untersucht, was dazu führen wird, dass der Indiumgehalt dieser
Bohrungen nach oben korrigiert wird.

Die Ergebnisse der Bohrungen AM-08-03, AM-08-04, AM-08-06 und AM-08-07
lauten im Detail wie folgt:

Bohrung  Von  Bis  Zinn Indium Zink Kupfer Wismut Wolfram Molybdän Arsen
        (m)  (m) (wt.%) g/t  (wt.%)(wt.%) (wt.%) (wt.%)  (wt.%)  (wt.%)
                                                 (WO3)   (MoS2)

AM-08-03  12  210  0.20  258   2.10  0.20   0.06   0.08    0.09    0.78
darunter  63   81  0.27 1,920  9.08  1.22   0.12   0.13    0.08    2.02

AM-08-04   7  195  0.12  106   0.53  0.04   0.04   0.14    0.07    0.68
darunter  27   42  0.21  676   7.47  0.19   Keine  Keine   Keine   3.66  
                                               signifikanten
                                           Werte  Werte   Werte
darunter 162  195  0.30  143   1.08  0.06   0.06   0.27    0.20    0.23

AM-08-06   3   84  0.25   44   1.04  0.06   Keine  Keine   Keine   1.33  
                                               signifikanten
                                           Werte  Werte   Werte
plus     258  285  1.24   38   0.70  0.08   0.11   0.18    0.14    0.36
darunter 261  264  10.7  146   3.61  0.14   0.12   0.25    0.20    0.44

AM-08-07   5  218  0.12   66   0.96  0.06   0.07   0.14    0.05    0.87
darunter  20   41  0.07  306   5.01  0.17   Keine  Keine   Keine   1.41  
                                               signifikanten
                                           Werte  Werte   Werte
darunter 125  185  0.26   62   0.35  0.04   0.07   0.13    0.07    0.74

AM-08-03, AM-08-04, AM-08-06 und AM-08-07 sind Definitionsbohrungen, die
als Teil von Adex’ National Instrument 43-101 ('NI 43-101')-konformer
Evaluierung der Zinn, Indium, Zink und Kupfer enthaltenden North- und Deep
Tin-Zonen durchgeführt wurden. Diese Bohrungen sind besonders ermutigend,
da die bisherigen Ergebnisse darauf hinzu deuten scheinen, dass die
Vererzung, die mit der Deep Tin-Zone in Verbindung steht (nicht NI 43-101
konform), sich in Richtung Oberfläche fortsetzt. Ein Bohrer wurde auf das
Zielgebiet bewegt, um weitere, anschließenden Tests, basierend auf diesen
Ergebnissen, durchzuführen. Die historische, nicht NI 43-101 konforme
'Gesamtressource' der North- und Deep Tin-Zonen besteht aus 3.645.429
Tonnen von 0,80 wt. % (Gewichtprozent) Zinn, 107 ppm (107 g/t) Indium, 0,87
wt. % Zink und 0,19 wt. % Kupfer, basierend auf einer Machbarkeitsstudie,
die 1997 von Kvaerner Metals Davy Ltd. erstellt wurde.

Die oben stehenden historischen Schätzungen in Bezug auf die North-Zone und
die Deep Tin-Zone wurden vor Inkrafttreten von NI 43-101 fertig gestellt.
Keine qualifizierte Person hat ausreichende Arbeiten vorgenommen, um diese
historischen Schätzungen nach NI 43-101-Standards oder den Standards des
Canadian Institute of Mining, Metallurgie und Petroleum zu klassifizieren
und Adex behandelt diese historischen Schätzungen nicht als aktuelle
Erzressourcen wie durch NI 43-101 definiert. Sie werden hier wiedergegeben,
da Adex der Ansicht ist, dass sie relevant und von historischer Bedeutung
sind. Sie sollten nicht auf diese historischen Schätzungen vertrauen.

Die Art der geologischen Lage der Erzvorkommen der North Zone führen zu
äußerst unterschiedlichen Formen und unterschiedlichen Ausrichtungen der
Zonen. Aus diesem Grund kann zu diesem Zeitpunkt noch keine Schätzung der
wahren Ausdehnung getroffen werden. Die Bohrungen sowohl auf den Zinn-,
Indium-, Zink-, Kupfer- als auch auf den Wolfram-, Molybdänzonen auf der
Minenliegenschaft Mount Pleasant laufen auch weiterhin, wobei beide Bohrer
auf der Liegenschaft im Einsatz sind.

Das Bohrprogramm 2008 wird als Teil einer laufenden Überprüfung der
Minenliegenschaft Mount Pleasant durchgeführt, die zum Zweck hat, eine
aktualisierte, NI 43-101-konforme Evaluierung der Erzressourcen
abzuschließen.

Weitere Informationen zur Mount Pleasant-Liegenschaft sind in der NI 43-101
konformen technischen Bewertung der Mount Pleasant-Liegenschaft (Technical
Review of the Mount Pleasant Property, Including a Mineral Resource
Estimate for the Fire Tower Zone Southwestern New Brunswick) vom 1. August
2006 zu finden, die von Paul Dunbar, M.Sc., P.Geo., Senior Associate
Geologist, Andrew Hara, P.Eng., Senior Associate Mining Engineer, Robert de
l’Etoile, M.Sc., P.Eng., Senior Associate Engineer und Dorota A. El-Rassi,
M.Sc., P.Eng., Geological Engineer von Watts, Griffis and McOuat Limited,
und Dr. Trevor Boyd, Ph.D., P.Geo., unabhängiger Berater, vorgenommen wurde
und unter www.sedar.com eingesehen werden kann.

Qualitätssicherung/Qualitätskontrolle

Adex Mining hat ein dem Branchenstandard entsprechendes
Qualitätssicherungs-/Qualitätskontrollprogramm installiert. Bohrkerne
werden mit Hilfe eines hydraulischen Kernteilers in zwei Hälften
aufgeteilt, sicher verpackt und per sicherem Frachtunternehmen in die
S.G.S. Labore in Toronto gebracht, wo sie per Natriumperoxidfusion mit
ICP-MS-Zurichtung für Indium und ICP-OES-Zurichtung für Wolfram, Molybdän,
Zinn, Wismut, Arsen, Zink, Kupfer und Blei untersucht werden. Pro 10 Proben
wird ein dem Labor unbekanntes Probendoppel eingereicht und ein dem Labor
unbekannter polymetallischer Standard wird jeder Lieferung von
Probendoppeln beigefügt. S.G.S. erfüllt alle Standardprotokolle zur
Qualitätssicherung/Qualitätskontrolle.

Fachkraft

Das Explorationsprogramm auf der Mount Pleasant-Liegenschaft wird unter der
Leitung von Trevor Boyd, P.Geo., durchgeführt, dem unabhängigen,
geologischen Berater des Unternehmens und einer Fachkraft gemäß NI 43-101.
Mr. Boyd überwachte die Aufbereitung der technischen Informationen in
dieser Pressemitteilung gemäß NI 43-101.

Über Adex:

Adex Mining Inc. ist ein junges, aufstrebendes Bergbauunternehmen aus
Kanada mit einem erfahrenden Managementteam. Das Unternehmen konzentriert
sich auf die Entwicklung seines Flagschiffprojekts, der Mount
Pleasant-Liegenschaft, einem Multimetallprojekt, auf dem vielversprechende
Wolfram-Molybdän- und Zinn-Indium-Zinkmineralisierungen zu finden sind. Die
Mount Pleasant-Minenliegenschaft liegt in Charlotte County, New Brunswick,
knapp 80 Kilometer südlich von Fredericton, der Provinzhauptstadt, und rund
65 Kilometer von der Grenze zu den Vereinigten Staaten entfernt. Die Aktien
des Unternehmens werden am TSX Venture Exchange mit dem Symbol 'ADE' und in
Frankfurt mit der WKN A0MXC1 gehandelt.

Keine Wertpapier- oder andere Behörde hat den Inhalt dieser
Pressemitteilung genehmigt oder abgelehnt.

Der TSX Venture Exchange übernimmt keine Verantwortung für die
Angemessenheit oder Fehlerfreiheit dieser Pressemitteilung.  

27.10.08 13:27

1575 Postings, 7617 Tage Ölmaus Aktualisierte NI 43-101-Ressourcenschätzung

Adex Mining Inc.: Aktualisierte NI 43-101-Ressourcenschätzung bestärkt Potenzial von Adex’ Fire Tower Zone auf dem Mount Pleasant-Projekt

Adex Mining Inc. / Sonstiges

Veröffentlichung einer Corporate News, übermittelt durch die DGAP - ein
Unternehmen der EquityStory AG.
Für den Inhalt der Mitteilung ist der Emittent / Herausgeber verantwortlich.
--------------------------------------------------

Toronto, 23. Oktober 2008 - Adex Mining Inc. ('Adex' oder 'das
Unternehmen') (WKN: A0MXC1, ISIN: CA0069032070) gibt bekannt, dass man eine
aktualisierte Ressourcenschätzung für die Wolfram-, Molybdän-Lagerstätte
der Fire Tower Zone (FTZ) auf der vollständig im Firmenbesitz befindlichen
Mount Pleasant-Minenliegenschaft ('Mount Pleasant' oder 'die Liegenschaft')
im Südwesten von New Brunswick, Kanada, gemäß National Instrument 43-101
('NI 43-101') abgeschlossen hat. Die Ressourcenschätzung beinhaltet eine
'angezeigte' Ressource von 13.489.000 Tonnen sowie eine 'geschlussfolgerte'
Ressource von 841.700 Tonnen.

'Die Aufwertung der FTZ-Ressourcenschätzung zur NI 43-101-Kategorie
'angezeigt' war eine notwendige Voraussetzung, um die FTZ in die
Machbarkeitsphase der Entwicklung voranzutreiben', sagte Kabir Ahmed,
President und CEO von Adex. 'Nachdem wir diesen wichtigen Meilenstein
effizient und effektiv erreicht haben, freuen wir uns nun darauf, unsere
schnelle Entwicklung der Mount Pleasant-Liegenschaft weiter
voranzutreiben.'

Die Ressourcenschätzung, die von SRK Consulting (Canada) Ltd. ('SRK') unter
Nutzung eines aktualisierten GEMCOM-Modells abgeschlossen wurde, wurde in
Verbindung mit der Erstellung eines unabhängigen technischen Berichts gemäß
NI 43-101 durchgeführt, der zurzeit von Watts, Griffis and McOuat Limited
('WGM') fertig gestellt wird, und zwar unter der Aufsicht von Trevor Boyd,
P.Geo., dem geologischen Berater des Unternehmens. Die Details der
Ressourcenschätzung lauten wie folgt:


                    Fire Tower Zone - Ressourcenschätzung,
                           Mount Pleasant-Minenliegenschaft

Gebiet             Tonnen       %WO3         %MoS2        %As          %Bi
                                        (Wolfram)     (Molybdän)   (Arsen)      (Wismut)
Angezeigt

 Fire Tower    9.148.900       0,32          0,21       0,29         0,04
 West
 Fire Tower
 North            4.340.100       0,35          0,20       1,15         0,09

Gesamt
Angezeigt     13.489.000       0,33          0,21       0,57         0,06

Geschlussfolgert

 Fire Tower      831.000         0,26          0,20       0,21         0,04
 West
 Fire Tower       10.700          0,26          0,17       0,26         0,05
 North

Gesamt
Geschlussfolgert 841.700       0,26          0,20       0,21         0,04

Die Ressourcenschätzung basierte auf einem Verschnittgrad von 0,3 %
WO3-Äquivalent, was % WO3 + 1,5 x % MoS2 entspricht. Der Verschnittgrad von
0,3 % WO3-Äquivalent wurde von Adex zur Verfügung gestellt und basiert auf
dem Wert des vererzten Materials von 30 USD / Tonne bei einem Wolframpreis
von 100 USD / MTU (Metric Tonne Unit) (10,0 USD / kg WO3), einem Minenleben
von zehn oder mehr Jahren und der bisherigen, zehnjährigen Preisbeziehung
von W und Mo. Im Einvernehmen mit SRK und basierend auf diesen
Metallpreisen hat das Unternehmen bestimmt, dass 0,3 %WO3-Äquivalent der
niedrigste, akzeptable Verschnittgrad ist, der gemeldet werden kann.

Die für den Verschnitt angesetzten Metallpreise werden als konservativ
angesehen, angesichts der Tatsache, dass die Preise zurzeit bei rund 20 USD
/ kg für WO3 und 30 USD / Pfund für MoO3 liegen. Bis eine wirtschaftliche
Evaluierung abgeschlossen ist, bleibt der wirtschaftliche Verschnitt für
diese Lagerstätte unbekannt. Ressourcen, die keine Reserven sind, verfügen
über keine ausgewiesene wirtschaftliche Lebensfähigkeit.

Die Begrenzungen der Vererzung wurden von Trevor Boyd, P.Geo., dem
geologischen Berater des Unternehmens von Hand ausgewertet. Die
Vererzungszonen schnitten im Allgemeinen geologische Einheiten und
strukturelle Begrenzungen. Infolgedessen wurden die Begrenzungen der
Ressource ausschließlich über % WO3- und % MoS2-Werte definiert. Diese
wurden auf Querschnitte aufgetragen und die Begrenzungen der Vererzungen
wurden mittig zwischen den Bohrlöchern eingetragen. Existierten keine
Bohrlöcher, um die Abgrenzung der Vererzungen einzugrenzen, wurden die
Abgrenzungen maximal auf eine Entfernung von zwanzig Metern vom nächsten
Bohrloch ausgedehnt. Im Allgemeinen wurde die Ausdehnung der Grenzen mit
den Trends in Übereinstimmung gebracht, die entstanden, indem bekannte
Verschnittgrenzen verbunden wurden. Ein Minimum von drei Metern wurde
genutzt, um die Zonen zu definieren, während eine gesteinsspezifische
Schwere von 2,65 genutzt wurde, um die Ressource zu berechnen.

Die Ressourcen werden in Übereinstimmung mit NI 43-101 und den
Definitionsstandards des Canadian Institute of Mining, Metallurgy and
Petroleum ('CIM') vom November 2004 gemeldet und wurden in Übereinstimmung
mit den CIM Estimation of Mineral Resource and Mineral Reserves Best
Practices Guidelines vom November 2003 geschätzt.

Das Unternehmen verfügt seit Aufnahme des Bohrprogramms über ein
branchenübliches Qualitätskontrollprogramm für seine Kernbohrungen und
Punzierung.

Paul Dunbar, M.Sc., P.Geo., Senior Associate Geologist bei WGM und eine
qualifizierte Person gemäß NI 43-101, besuchte die Mount
Pleasant-Minenliegenschaft im Mai und Juni 2008. Während dieser Besuche vor
Ort untersuchte er das Bohrprogramm und die Bohrkerne und schloss
Überprüfungen der Kernproben ab. Dorota El-Rassi, M.Sc., P.Eng., Geological
Engineer bei SRK und eine qualifizierte Person gemäß NI 43-101, verglich
die Probenergebnisse mit der GEMCOM-Datenbank. Die Datenbanküberprüfung
stellte keine signifikanten Diskrepanzen in den geologischen Informationen
fest, was dem Branchenstandard entspricht. Duplikate der Bohrkernproben
wurden, ohne Wissen des Labors, an ein zweites Labor geschickt, womit
Standardqualitätssicherungsprotokolle erfüllt wurden. Die analytischen
Ergebnisse einiger dieser Proben stehen noch aus.

Niemandem, weder Trevor Boyd, der geologische Berater des Unternehmens,
noch Paul Dunbar, Dorota El-Rassi oder das Management des Unternehmens sind
irgendwelche bekannte umwelttechnische, Genehmigungs-, rechtliche,
eigentumsrechtliche, steuerliche, sozialpolitische, Marketing- oder andere
relevante Probleme bekannt, die die Schätzung der Ressource wesentlich
beeinflussen könnten.

Trevor Boyd, P.Geo., der geologische Berater des Unternehmens, überwachte
die Erstellung der Ressourcenschätzung für die FTZ und die technischen
Informationen in dieser Pressemitteilung gemäß NI 43-101. Paul Dunbar,
M.Sc., P.Geo., Senior Associate Geologist bei WGM, erstellt den
aktualisierten technischen Bericht gemäß NI 43-101 zur Fire Tower Zone der
Mount Pleasant-Liegenschaft, den Adex innerhalb von 45 Tagen ab dem
heutigen Datum bei SEDAR einreichen wird.

Über Adex:

Adex Mining Inc. ist ein junges, aufstrebendes Bergbauunternehmen aus
Kanada mit einem erfahrenden Managementteam. Das Unternehmen konzentriert
sich auf die Entwicklung seines Flagschiffprojekts, der Mount
Pleasant-Liegenschaft, einem Multimetallprojekt, auf dem vielversprechende
Wolfram-Molybdän- und Zinn-Indium-Zinkmineralisierungen zu finden sind. Die
Mount Pleasant-Minenliegenschaft liegt in Charlotte County, New Brunswick,
knapp 80 Kilometer südlich von Fredericton, der Provinzhauptstadt, und rund
65 Kilometer von der Grenze zu den Vereinigten Staaten entfernt. Die Aktien
des Unternehmens werden am TSX Venture Exchange mit dem Symbol 'ADE' und in
Frankfurt mit der WKN A0MXC1 gehandelt.

Keine Wertpapier- oder andere Behörde hat den Inhalt dieser
Pressemitteilung genehmigt oder abgelehnt.

Der TSX Venture Exchange übernimmt keine Verantwortung für die
Angemessenheit oder Fehlerfreiheit dieser Pressemitteilung.

Kontakt:

Adex Mining Inc.
Kabir Ahmed
President, Chief Executive Officer and Director
+1-866-508-2339 oder +49 40 41 33 09 50
Email: investorrelations@adexmining.com
Homepage: www.adexmining.com

Die Ausgangssprache, in der der Originaltext veröffentlicht wird, ist die
offizielle und autorisierte Version. Übersetzungen werden zur besseren
Verständlichkeit geliefert. Nur die Sprachversion, die im Original
veröffentlicht wurde, ist rechtsgültig. Gleichen Sie deshalb Übersetzungen
mit der originalen Sprachversion der Veröffentlichung ab.

Vorausschauende Aussagen
Bestimmte Aussagen in dieser Pressemitteilung könnten so genannte
Vorausschauende Aussagen darstellen, die bekannte und unbekannte Risiken,
Unsicherheiten und andere Faktoren beinhalten, die dazu führen könnten,
dass die tatsächlichen Ergebnisse, die Performance oder Erfolge von Adex,
seiner Tochtergesellschaften oder der Branche, in der diese tätig sind,
substanziell von zukünftigen Ergebnissen, Performance oder Erfolgen
abweichen können, die durch solche zukunftsorientierte Aussagen ausgedrückt
oder impliziert werden. Wenn in dieser Pressemitteilung die Worte
'schätzen', 'glauben', 'erwarten', 'vorhaben', 'davon ausgehen', 'planen',
'könnte', 'sollte', 'werden', deren negative Form oder andere Variation
derselben Worte oder vergleichbare Terminologie genutzt wird, sollen diese
solche vorausschauenden Aussagen identifizieren. Solche Aussagen spiegeln
die derzeitigen Erwartungen des Managements von Adex in Bezug auf
zukünftige Ereignisse basierend auf den derzeit verfügbaren Informationen
wieder und unterliegen Risiken und Unsicherheiten, die dazu führen könnten,
dass die tatsächlichen Ergebnisse, Performance oder Leistungen substanziell
von jenen abweichen, die in diese zukunftsorientierten Aussagen ausgedrückt
oder impliziert werden. Diese Risiken und Unsicherheiten werden von Zeit zu
Zeit, darin ohne Einschränkung eingeschlossen, unter der Überschrift
'Risikofaktoren' in den Berichten, die Adex bei der Alberta, British
Columbia und Ontario Securities Commissions einreicht, die unter
www.sedar.com eingesehen werden können, und auf die wir die Leser dieser
Pressemitteilung, die mehr über Adex, seine Aussichten sowie die Risiken
und Unsicherheiten erfahren möchten, hinweisen. Es kann geschehen, dass von
Zeit zu Zeit neue Risikofaktoren entstehen und es ist dem Management nicht
möglich, all diese Risikofaktoren oder das Ausmaß, in dem diese Faktoren
allein oder in Kombination dazu führen könnten, dass die tatsächlichen
Ergebnisse, Performance und Leistungen von Adex substanziell anders
ausfallen können, als in den vorausschauenden Aussagen dargestellt. Obwohl
die vorausschauenden Aussagen in dieser Pressemitteilung darauf basieren,
was das Management zu diesem Zeitpunkt für vernünftige Annahmen hält, kann
Adex Investoren nicht versichern, dass die tatsächlichen Ergebnisse mit
diesen vorausschauenden Aussagen übereinstimmen werden. Angesichts dieser
Risiken und Unsicherheiten, sollten Investoren nicht übermäßig auf
vorausschauende Aussagen als eine Vorhersage tatsächlicher Ergebnisse
vertrauen.

Die zukunftsorientierten Informationen in dieser Pressemitteilung sind nur
zum Erscheinungsdatum dieser Pressemitteilung aktuell. Adex unternimmt
nichts und übernimmt keine Verpflichtung, Änderungen an diesen
vorausschauenden Aussagen zu veröffentlichen, um Ereignissen oder Umständen
gerecht zu werden, die nach diesem Datum liegen, oder um nicht zu
erwartende Ereignisse dazustellen.
 

09.12.08 08:52

1575 Postings, 7617 Tage ÖlmausAdex files final Fire Tower zone technical report

Adex files final Fire Tower zone technical report

Adex Mining Inc (C:ADE) Shares Issued 88,117,361Last Close  12/5/2008 $0.03Monday December 08 2008 - News Release

Mr. Kabir Ahmed reports

ADEX ANNOUNCES FILING OF FIRE TOWER ZONE NI 43-101 COMPLIANT TECHNICAL REPORT

Adex Mining Inc. has filed a National Instrument 43-101-compliant technical report on the Fire Tower zone (FTZ) with the Ontario, B.C. and Alberta securities commissions. The technical report, completed by Watts, Griffis and McOuat Ltd., consulting geologists and engineers, is the final technical report in relation to the updated NI 43-101 resource estimate for the FTZ announced by Adex in a news release reported in Stockwatch on Oct. 23, 2008, titled "Updated NI 43-101 Resource Estimate Reinforces Potential Of Adex Mining's Fire Tower Zone At Mount Pleasant."

The FTZ, one of two mineralized zones found at the company's Mount Pleasant mine property  located in southwestern New Brunswick, Canada, is the site of a past-producing tungsten-molybdenum underground mining operation during the 1980s.

The technical report also includes an executive summary of the recently completed scoping study on the FTZ, the results of which were announced in a news release reported in Stockwatch on  Oct. 30, 2008, titled "Adex Announces Results For Fire Tower Zone Scoping Study." The FTZ scoping study was completed by Aker Metals, a division of Aker Solutions Canada Inc. The scoping study and the economic analyses contained therein are preliminary in nature and contain inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the results of the scoping study will be realized with more detailed work. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

The technical report, entitled "A Technical Review of the Mount Pleasant Property, Including an updated Mineral Resource Estimate on the Fire Tower Zone, Southwestern New Brunswick for ADEX Mining Inc" dated Dec. 1, 2008, and completed by Paul Dunbar, MSc, PGeo, senior associate geologist of Watts, Griffis and McOuat Ltd., Dorota A. El-Rassi, MSc, PEng, geological engineer of SRK Consulting, and John S. Rogers, PEng, of Aker Metals, a division of Aker Solutions Canada Inc., is now available on SEDAR.

Qualified person

Trevor Boyd, PGeo, the company's geological consultant and a qualified person as defined by National Instrument 43-101, supervised the preparation of the technical information contained in this news release in compliance with NI 43-101.

© 2008 Canjex Publishing Ltd.  

20.01.09 11:43

1575 Postings, 7617 Tage Ölmaus+25% heute

mit 490.000 Stücken. (okay, nur 24 1/2 T Euro, aber immerhin)
War das einer von euch? ;)  

21.01.09 09:01

1575 Postings, 7617 Tage Ölmausin Canada +66%

gestern bei ebenfalls mehr als einer halben Million Stücke. Okay, auch das ist in Geld nicht so viel Umsatz, aber deutlich mehr als in den letzten Monaten. Heute in Frankfurt schon wieder knapp 300T Stücke und weuter rauf auf 0,05 Euro. Hat irgendwer was gesehen? News? Empfehlung etc?  

27.01.09 08:28

237 Postings, 5854 Tage nullkommanixInvestor Verlag macht mit Adex gerade

massiv Werbung.
Die Werbemails kommen heraus, nachdem die Abonenten den Brief (RohstoffInvestor) schon erhalten haben.
Deshalb der höhere Umsatz die letzten Tage, sind wohl einige der Abonenten drauf gesprungen.
Wer will, kann von mir die Werbemail zugeschickt bekommen.  BM mit email Adresse genügt, leite es dann einfach weiter. Gilt aber nicht für ewig, sagen wir die nächsten 4 Tage. Dann könnte ich die Mail an alle Interessenten gleichzeitg abschicken.
:) bin kein Abonent :)  aber man kann sich aus dem Inhalt und der schönen Beschreibung das meiste herauslesen um die Empfehlung zu erkennen.
-----------
>>>  das leben ist zu kurz um zu zögern  <<<

16.02.09 11:17

1575 Postings, 7617 Tage ÖlmausAuch ohne

weitere Werbung geht es in Übersee - zumindest etwas - aufwärts.
Sind in Kanada bei 0,06 CAD, was in Euro 0,0378 entspricht. Also
deutlich über den 0,025, die die Quote-Machine in Frankfurt ausweist.
Mal schaun, was passiert, wenn die nächsten News kommen...  

19.02.09 11:38

1575 Postings, 7617 Tage ÖlmausÜbrigens gabs ne Menge News

seit Oktober, wenn auch "nur" auf englisch:

Adex Announces Filing of Fire Tower Zone NI 43-101 Compliant Technical Report
Toronto – December 8, 2008 – Adex Mining Inc. (“Adex” or the “Company”) (TSX-V: ADE) is pleased to announce the filing of a National Instrument 43-101 (“NI 43-101”) compliant technical report (the “Technical Report”) on the Fire Tower Zone (“FTZ”) with the Ontario, British Columbia and Alberta securities commissions.  The Technical Report, completed by Watts, Griffis and McOuat Limited, consulting geologists and engineers, is the final technical report in relation to the updated NI 43-101 resource estimate for the FTZ announced by Adex in a press release dated October 23, 2008 titled “Updated NI 43-101 Resource Estimate Reinforces Potential Of Adex Mining’s Fire Tower Zone At Mount Pleasant.”

The FTZ, one of two mineralized zones found at the Company’s Mount Pleasant Mine Property (“Mount Pleasant” or the “Property”) located in southwestern New Brunswick, Canada, is the site of a past-producing tungsten-molybdenum underground mining operation during the 1980s.

The Technical Report also includes an Executive Summary of the recently completed scoping study on the FTZ, the results of which were announced in a press release dated October 30, 2008 titled “Adex Announces Results For Fire Tower Zone Scoping Study” The FTZ scoping study was completed by Aker Metals, a division of Aker Solutions Canada Inc. The scoping study and the economic analyses contained therein are preliminary in nature and contain “Inferred” mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the results of the scoping study will be realized with more detailed work. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

The Technical Report, entitled “A Technical Review of the Mount Pleasant Property, Including an updated Mineral Resource Estimate on the Fire Tower Zone, Southwestern New Brunswick for ADEX Mining Inc.” dated December 1, 2008 and completed by Paul Dunbar, M.Sc., P.Geo. Senior Associate Geologist of Watts, Griffis and McOuat Limted, Dorota A. El-Rassi, M.Sc., P.Eng., Geological Engineer of SRK Consulting and John S. Rogers, Professional Engineer of Aker Metals, a division of Aker Solutions Canada Inc., is now available on www.sedar.com.

Qualified Person

Trevor Boyd, P.Geo., the Company’s Geological Consultant and a qualified person as defined by National Instrument 43-101 (“NI 43-101”), supervised the preparation of the technical information contained in this press release in compliance with NI 43-101.

ABOUT ADEX

Adex Mining Inc. is a Canadian junior mining company with an experienced management team. The Company is focused on developing its flagship Mount Pleasant Mine Property, a multi-metal project that is host to promising tungsten-molybdenum and tin-indium-zinc-copper mineralization. Located in Charlotte County, New Brunswick, the Mount Pleasant Mine Property is situated approximately 80 kilometres south of Fredericton, the provincial capital, and is 65 kilometres from the United States border. The common shares of Adex trade on the TSX Venture Exchange under the stock symbol “ADE.”
No securities commission or regulatory authority has approved or disapproved the contents of this press release.
The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this press release.

CONTACT INFORMATION:

Adex Mining Inc.
Kabir Ahmed
President, Chief Executive Officer and Director
1-866-508-2339 (ADEX)
Email: investorrelations@adexmining.com
Website: www.adexmining.com

FORWARD-LOOKING STATEMENTS

Certain statements in this press release may constitute "forward-looking" statements which involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements of Adex, its subsidiary or the industry in which they operate to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. When used in this press release, the words "estimate", "believe", "anticipate", "intend", "expect", "plan", "may", "should", "will", the negative thereof or other variations thereon or comparable terminology are intended to identify forward-looking statements. Such statements reflect the current expectations of the management of Adex with respect to future events based on currently available information and are subject to risks and uncertainties that could cause actual results, performance or achievements to differ materially from those expressed or implied by those forward-looking statements. These risks and uncertainties are detailed from time to time, including, without limitation, under the heading "Risk Factors", in reports filed by Adex with the Alberta, British Columbia and Ontario Securities Commissions which are available at www.sedar.com and to which readers of this press release are referred for additional information concerning Adex, its prospects and the risks and uncertainties relating to Adex and its prospects. New risk factors may arise from time to time and it is not possible for management to predict all of those risk factors or the extent to which any factor or combination of factors may cause actual results, performance and achievements of Adex to be materially different from those contained in forward-looking statements. Although the forward-looking statements contained in this press release are based upon what management believes to be reasonable assumptions, Adex cannot assure investors that actual results will be consistent with these forward-looking statements. Given these risks and uncertainties, investors should not place undue reliance on forward-looking statements as a prediction of actual results.

The forward-looking information contained in this press release is current only as of the date of the press release. Adex does not undertake or assume any obligation to release publicly any revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except as required by law.  

19.02.09 11:38

1575 Postings, 7617 Tage ÖlmausAdex Mining Provides Year-End Update

Adex Mining Provides Year-End Update
Toronto – December 9, 2008 – Adex Mining Inc. (“Adex” or the “Company”) (TSX-V: ADE) is pleased to provide a year-end update with respect to the 2008 development program at its Mount Pleasant Mine Property (“Mount Pleasant” or the “Property”), located in southwestern New Brunswick Canada.

The Property hosts the tungsten-molybdenum bearing Fire Tower Zone (“FTZ”) and the tin-indium-zinc-copper bearing North Zone (“NZ”).  The FTZ is the site of a past-producing tungsten-molybdenum underground mining operation that was active between 1983 and 1985.

Completion of 2008 Drill Program

To date, the Company has completed a combined 13,300 metre definition and expansion drill program at the FTZ and NZ, the purpose of which to prepare an updated National Instrument 43-101 (“NI 43-101)-compliant mineral resource estimate on the FTZ and a NI 43-101-compliant mineral resource estimate on the NZ.

Completion and Filing of NI 43-101-Compliant FTZ Technical Report

As announced in a press release dated December 8, 2008, the Company has now completed and filed its NI 43-101-compliant technical report (the “FTZ Technical Report”) entitled “A Technical Review of the Mount Pleasant Property, Including an updated Mineral Resource Estimate on the Fire Tower Zone, Southwestern New Brunswick for ADEX Mining Inc.” dated December 1, 2008. The FTZ Technical Report was prepared by Paul Dunbar, M.Sc., P.Geo. Senior Associate Geologist of Watts, Griffis and McOuat Limited, Consulting Geologists and Engineers, Dorota A. El-Rassi, M.Sc., P.Eng., Geological Engineer of SRK Consulting and John S. Rogers, P.Eng., of Aker Metals, a division of Aker Solutions Canada Inc.

The FTZ Technical Report, which is now available on www.sedar.com, contains the updated NI 43-101-compliant mineral resource estimate for the FTZ which was the subject of the Company’s press release dated October 23, 2008.

Completion of FTZ Scoping Study

The Company has also completed a scoping study on the FTZ, the results of which were announced in the Company’s press release dated October 30, 2008.  The FTZ scoping study was completed by Aker Metals, a division of Aker Solutions Canada Inc.

The scoping study and the economic analyses contained therein are preliminary in nature and contain “Inferred” mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the results of the scoping study will be realized with more detailed work. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Proposed Completion of NZ Updated Resource Estimate and NI 43-101 Compliant Technical Report

The Company’s technical team, along with Watts, Griffis and McOuat Limited, is in the process of completing a NI 43-101-compliant mineral resource estimate for the tin-indium-zinc-copper NZ which Adex anticipates will be completed in early January 2009, with a NI 43-101-compliant technical report supporting such estimate to be filed on www.sedar.com within 45 days thereafter. The completion of this technical report will mark the completion by the Company of all of its targeted milestones for fiscal 2008.

Completion of Repair and Upgrade of Tailings Impoundment Facility and Update on Environmental Compliance

Pursuant to the requirements of an Approval to Operate granted by the New Brunswick Ministry of Environment in November 2007, the Company has now completed the repair and upgrade of its Tailings Impoundment Facility (“TIF”).  The TIF is an integral part of the infrastructure required for carrying out future mining operations at Mount Pleasant.

The Company is also working closely with provincial and federal regulatory agencies, including the New Brunswick Ministry of Environment, New Brunswick Ministry of Natural Resources, Environment Canada and Fisheries and Oceans Canada to complete baseline environmental monitoring, impact and sampling studies at Mount Pleasant.  The completion of these environmental studies is required in order to obtain future regulatory approvals necessary for the de-watering and development of the Mount Pleasant mine.

Comments on Current Market Conditions

The Company is pleased to report that it is well financed and, as of September 30, 2008, had a cash position of approximately $4.0 million.  The Company is, therefore, well-positioned to advance Mount Pleasant forward to the next stage of development, being the completion of a feasibility study on the FTZ.  However, given the unprecedented deterioration of the global capital markets over the past few months and growing uncertainty in worldwide demand for commodities, including for the metals hosted at Mount Pleasant, the Company will review the schedule for advancing development of the Property carefully on the basis of prevailing market conditions.

Qualified Person

Trevor Boyd, P.Geo., the Company’s Geological Consultant and a qualified person as defined by NI 43-101 supervised the preparation of the technical information contained in this press release in compliance with NI 43-101.

ABOUT ADEX

Adex Mining Inc. is a Canadian junior mining company with an experienced management team. The Company is focused on developing its flagship Mount Pleasant Mine Property, a multi-metal project that is host to promising tungsten-molybdenum and tin-indium-zinc-copper mineralization. Located in Charlotte County, New Brunswick, the Mount Pleasant Mine Property is situated approximately 80 kilometres south of Fredericton, the provincial capital, and is 65 kilometres from the United States border. The common shares of Adex trade on the TSX Venture Exchange under the stock symbol “ADE.”
No securities commission or regulatory authority has approved or disapproved the contents of this press release.
The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this press release.

CONTACT INFORMATION:

Adex Mining Inc.
Kabir Ahmed
President, Chief Executive Officer and Director
1-866-508-2339 (ADEX)
Email: investorrelations@adexmining.com
Website: www.adexmining.com

FORWARD-LOOKING STATEMENTS

Certain statements in this press release may constitute "forward-looking" statements which involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements of Adex, its subsidiary or the industry in which they operate to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. When used in this press release, the words "estimate", "believe", "anticipate", "intend", "expect", "plan", "may", "should", "will", the negative thereof or other variations thereon or comparable terminology are intended to identify forward-looking statements. Such statements reflect the current expectations of the management of Adex with respect to future events based on currently available information and are subject to risks and uncertainties that could cause actual results, performance or achievements to differ materially from those expressed or implied by those forward-looking statements. These risks and uncertainties are detailed from time to time, including, without limitation, under the heading "Risk Factors", in reports filed by Adex with the Alberta, British Columbia and Ontario Securities Commissions which are available at www.sedar.com and to which readers of this press release are referred for additional information concerning Adex, its prospects and the risks and uncertainties relating to Adex and its prospects. New risk factors may arise from time to time and it is not possible for management to predict all of those risk factors or the extent to which any factor or combination of factors may cause actual results, performance and achievements of Adex to be materially different from those contained in forward-looking statements. Although the forward-looking statements contained in this press release are based upon what management believes to be reasonable assumptions, Adex cannot assure investors that actual results will be consistent with these forward-looking statements. Given these risks and uncertainties, investors should not place undue reliance on forward-looking statements as a prediction of actual results.

The forward-looking information contained in this press release is current only as of the date of the press release. Adex does not undertake or assume any obligation to release publicly any revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except as required by law.  

19.02.09 11:39

1575 Postings, 7617 Tage ÖlmausAdex Mining Completes Mineralogy Study

Adex Mining Completes Mineralogy Study
Toronto, Tuesday, December 23, 2008 – Adex Mining Inc. (“Adex” or the “Company”) (TSX-V: ADE) is pleased to announce the completion of a mineralogy characterization test program for the recovery and extraction of tungsten, molybdenum, tin and indium at the Company’s Mount Pleasant Mine Property (the “Property”) located in southwestern New Brunswick.  The Property hosts two mineralized zones: the tungsten-molybdenum bearing Fire Tower Zone (“FTZ”) and the tin-indium bearing North Zone (“NZ”).

The mineralogy characterization test program was undertaken with the purpose of assisting the Company develop and validate a metallurgical process for optimum metal recovery from the Property’s FTZ and NZ.  Specifically, a detailed analysis of the grain size and liberation characteristics of the metals hosted at the Property was completed to confirm an optimum grinding and metal recovery circuit.

SGS Lakefield Research Limited of Lakefield, Ontario completed the mineralogy characterization test program by assessing ore samples from the FTZ and NZ using a series of metallurgical technologies, including QEMSCAN, X-ray diffraction and Electron Microprobe analysis.

Qualified Person

Trevor Boyd, P.Geo., the Company’s Geological Consultant and a qualified person as defined by NI 43-101, supervised the preparation of the technical information contained in this press release in compliance with National Instrument 43-101.

ABOUT ADEX:

Adex Mining Inc. is a Canadian junior mining company with an experienced management team. The Company is focused on developing its flagship Mount Pleasant Mine Property, a multi-metal project that is host to promising tungsten-molybdenum and tin-indium-zinc-copper mineralization. Located in Charlotte County, New Brunswick, Mount Pleasant is situated approximately 80 kilometers south of Fredericton, the provincial capital, and is 65 kilometers from the United States border. The common shares of Adex trade on the TSX Venture Exchange under the stock symbol “ADE”.

FORWARD-LOOKING STATEMENTS

Certain statements in this press release may constitute "forward-looking" statements which involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements of Adex, its subsidiary or the industry in which they operate to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. When used in this press release, the words "estimate", "believe", "anticipate", "intend", "expect", "plan", "may", "should", "will", the negative thereof or other variations thereon or comparable terminology are intended to identify forward-looking statements. Such statements reflect the current expectations of the management of Adex with respect to future events based on currently available information and are subject to risks and uncertainties that could cause actual results, performance or achievements to differ materially from those expressed or implied by those forward-looking statements. These risks and uncertainties are detailed from time to time, including, without limitation, under the heading "Risk Factors", in reports filed by Adex with the Alberta, British Columbia and Ontario Securities Commissions which are available at www.sedar.com and to which readers of this press release are referred for additional information concerning Adex, its prospects and the risks and uncertainties relating to Adex and its prospects. New risk factors may arise from time to time and it is not possible for management to predict all of those risk factors or the extent to which any factor or combination of factors may cause actual results, performance and achievements of Adex to be materially different from those contained in forward-looking statements. Although the forward-looking statements contained in this press release are based upon what management believes to be reasonable assumptions, Adex cannot assure investors that actual results will be consistent with these forward-looking statements. Given these risks and uncertainties, investors should not place undue reliance on forward-looking statements as a prediction of actual results.

The forward-looking information contained in this press release is current only as of the date of the press release. Adex does not undertake or assume any obligation to release publicly any revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except as required by law.

FOR FURTHER INFORMATION PLEASE CONTACT:

Kabir Ahmed
President, Chief Executive Officer and Director
Adex Mining Inc.
1-866-508-2339 (ADEX)
Email: investorrelations@adexmining.com
Website: www.adexmining.com

No securities commission or regulatory authority has approved or disapproved the contents of this press release.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this press release.  

07.04.09 10:00

1575 Postings, 7617 Tage ÖlmausGeil!

Mahlzeit, das kam gestern über den Ticker
In den USA + 43 Prozent in den letzten Handelsstunden :D

Adex Announces NI 43-101 Compliant "Indicated" Mineral Resource Estimate of 10.88 Million Tonnes for the North Zone's Tin-Indium-Zinc Deposit at Mount Pleasant

* Monday April 6, 2009, 8:40 am EDT

TORONTO, ONTARIO--(Marketwire - April 6, 2009) - Adex Mining Inc. ("Adex" or the "Company") (TSX VENTURE:ADE - News) is pleased to announce that it has completed a National Instrument 43-101 ("NI 43-101") compliant Mineral Resource estimate for seven tin-indium-zinc (Sn-In-Zn) sub-(zones and one tungsten-molybdenum-bismuth (WO3-MoS2-Bi) sub-zone which make up) the North Zone ("NZ") at its wholly-owned Mount Pleasant Mine Property in southwestern New Brunswick, Canada ("Mount Pleasant" or the "Property"). The total Sn-In-Zn resource estimate includes an Indicated Mineral Resource of 10,882,000 tonnes, plus an Inferred Mineral Resource of 7,603,000 tonnes.

The NI 43-101 compliant Mineral Resource estimate for the NZ indicates the opportunity for both near surface and at depth mineralization. This will have implications for further studies when assessing the economic potential of developing a near surface, open pit and/or underground mining operation at the NZ.

The NI 43-101 compliant Mineral Resource estimate, completed by Watts, Griffis and McOuat Limited ("WGM") using an updated GEMCOM model, was completed in conjunction with the preparation by WGM of an independent NI 43-101 Technical Report under the supervision of Trevor Boyd, P.Geo., the Company's Geological Consultant.

Details of the NI 43-101 compliant mineral resource estimate are as follows.


NORTH ZONE - MINERAL RESOURCE ESTIMATE,
MOUNT PLEASANT MINE PROPERTY
--------------------------------------------------
--------------------------------------------------

Sub-Zones Tonnes % Sn g/t In g/t In % Zn % As %WO3 %MoS2 % Cu % Bi
(Capped)
--------------------------------------------------
--------------------------------------------------
Indicated
Deep Tin 5,006,000 0.39 101.0 95.2 0.86 1.25 0.08 0.06 0.14 0.08
Endogranitic 4,336,000 0.55 21.8 20.3 0.28 0.85 0.12 0.06 0.10 0.09
Upper Deep
Tin 838,000 0.22 102.8 94.9 1.36 0.76 0.08 0.06 0.07 0.05
#4 Tin Lode 702,000 0.25 74.1 74.1 1.00 0.19 0.01 0.01 0.09 0.00

Total
Indicated 10,882,000 0.43 67.8 64.0 0.67 0.98 0.09 0.06 0.11 0.08

Inferred
#1-3 Tin
Lode 2,345,000 0.18 76.8 73.5 1.08 0.28 0.02 0.03 0.09 0.01
#5 Tin Lode 1,267,000 0.15 115.4 111.3 1.50 0.70 0.07 0.04 0.08 0.03
North Adit 3,076,000 0.27 62.1 62.1 0.83 1.16 0.09 0.06 0.09 0.07
North W-Mo 915,000 0.26 54.3 49.8 0.58 1.14 0.25 0.12 0.12 0.10

Total
Inferred 7,603,000 0.22 74.6 72.3 0.99 0.80 0.08 0.05 0.09 0.05
--------------------------------------------------
--------------------------------------------------


The resource estimate for the Sn-In-Zn sub-zones was based on a cut-off grade of 0.25% Sn equivalent (Sn eqv.), equal to % Sn + 41.67 x % In. The 0.25% Sn equivalent cut-off grade was provided by Adex based on a value of the mineralized material of US$30/tonne derived from the previous six-year price trend and price relationship between tin and indium using an estimated tin price of US$12.0/kg and indium price of $500/kg. Zinc was not incorporated into the estimation of the cut-off grade. In consultation with WGM and based upon these metal prices, Adex has determined that 0.25% Sn equivalent is an acceptable cut-off grade to report the resources.

Until an economic evaluation is completed, the economic cut-off for this deposit is unknown. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

A policy of capping of high indium grades was implemented based upon the statistical distribution of the metal within each individual sub-zone. Hence the Upper Deep Tin, Deep Tin, #5 Tin Lode, #1-3 Tin Lode, Endogranitic and North W-Mo sub-zones had capped indium grades at 965, 830, 750, 500, 200 and 200 g/t, respectively. No capping of indium was required for the North Adit or the #4 Tin lode.

If a cut-off grade of 0.30% WO3 equivalent is applied to the estimate of the North W-Mo sub-zone then the Inferred Resource is estimated to be 3,278,800 tonnes grading 0.10 % Sn, 23.5 g/t In (21.9 g/t In capped) 0.27 % Zn, 1.02 % As, 0.27 % WO3, 0.16 % MoS2, 0.05 % Cu, and 0.14 % Bi. The cut-off grade of 0.30% WO3 equivalent, equal to % WO3 + 1.5 x % MoS2, was provided by Adex. This was based on a value of the mineralized material of US$30/tonne at a tungsten price of US$100/MTU (US$10.0/kg WO3) similar) to that used for the NI 43-101 resource estimation and technical report for the Fire Tower Zone (the "FTZ") at the Property. The technical report on the FTZ (the "FTZ Technical Report") entitled "A Technical Review of the Mount Pleasant Property, Including an updated Mineral Resource Estimate on the Fire Tower Zone, Southwestern New Brunswick for ADEX Mining Inc." dated December 1, 2008 and completed by Paul Dunbar, M.Sc., P.Geo. Senior Associate Geologist of Watts, Griffis and McOuat Limited, Dorota A. El-Rassi, M.Sc., P.Eng., Geological Engineer of SRK Consulting and John S. Rogers, P.Eng., of Aker Metals, a division of Aker Solutions Canada Inc., is available on www.SEDAR.com.

The boundaries of the mineralized body were interpreted manually by Trevor Boyd, P.Geo., the Company's Geological Consultant. Mineralized zones were commonly cross-cutting geological units and structural boundaries. Consequently, resource boundaries were defined based solely on % Sn and % In values (or % WO3 and % MoS2 values in the case of the North W-Mo sub-zone). These were plotted on cross sections spaced 25 metres apart and mineralization boundaries were drawn halfway between drill holes. If no holes existed to limit the mineralization outlines, the boundaries were extended to a maximum of 20 metres away from the nearest hole. In general, extensions of the boundaries were made consistent with the trends defined by joining known cut-off boundaries. A minimum width of 3 metres was used for defining the zones, and a specific gravity of 2.70 was used for estimating the resources.

The eight modeled sub-zones that make up the North Zone are distributed over an area of 450 by 250 metres extending from the surface to a vertical depth of 450 metres. They are located 800 metres north of the WO3 - MoS2 FTZ for which an NI 43-101 compliant Indicated Resource of 13,489,000 tonnes, plus an Inferred Resource of 841,700 tonnes, was reported in FTZ Technical Report.

The #4 Tin Lode and #5 Tin Lode sub-zones extend from the surface to a vertical depth of 70 metres. The #1-3 Tin Lode sub-zone extends from the surface to a vertical depth of 160 metres. The Upper Deep Tin sub-zone is situated beneath the #5 Tin Lode extending from 80 to 160 metres vertical depth. The Deep Tin sub-zone reaches to within 40 metres laterally of the Upper Deep Tin Zone extending from 140 to 270 metres vertical depth. The North Adit sub-zone consists of four mineralized regions distributed from the surface to a vertical depth of 250 metres. The North W-Mo sub-zone consists of three mineralized regions extending from 80 to 350 metres vertical depth. The Endogranitic sub-zone extends from 250 to 450 metres vertical depth. An 1,100 metre decline, which was used to collect bulk samples in 1986, extends from the Fire Tower Zone underground workings to the Endogranitic sub-zone. The decline and underground workings are presently flooded. An exploration drive developed in the 1960s extends from the surface to the vicinity of the #4 Tin Lode and the #1-3 Tin Lode sub-zones. The condition of the drive is presently unknown.

The mineral resources are reported in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards, November 2004 and have been estimated in conformity with the CIM Estimation of Mineral Resource and Mineral Reserves Best Practices Guidelines, November 2003. The Company has implemented an industry standard quality control program on its drill core and assaying since the inception of its drilling program.

Paul Dunbar, M.Sc., P.Geo., Senior Associate Geologist of WGM, an independent qualified person as defined by National Instrument 43-101, carried out site visits to the Property in May and June, 2008 during which he examined the drilling program and core, and completed check sampling and assaying of core samples. Robert de l'Etoile, P.Eng., Geological Engineer and consultant to WGM, an independent qualified person as defined by National Instrument 43-101, checked assay results against the GEMCOM database. The database verification found no significant discrepancies in the geological information, which conformed to industry standards. Pulp duplicates of the drill core samples, unknown to the laboratory, were sent to a second laboratory fulfilling standard QA/QC protocols. Analytical results for some of these samples remain pending.

None of Trevor Boyd, the Company's Geological Consultant, Paul Dunbar, Robert de l'Etoile or Management of the Company is aware of any known environmental, permitting, legal, title, taxation, socio-political, marketing or other relevant issues that may materially affect the estimate of the mineral resource.

Trevor Boyd, P.Geo., the Company's Geological Consultant, supervised the preparation of the mineral resource estimate for the North Zone and the technical information contained in this press release in compliance with NI 43-101. Paul Dunbar is preparing the NI 43-101 Technical Report on the North Zone, which Adex will file on SEDAR within 45 days of today's date.

Additional information concerning the Property is contained in the FTZ Technical Report.

ABOUT ADEX

Adex Mining Inc. is a Canadian junior mining company with an experienced management team. The Company is focused on developing its flagship Mount Pleasant Mine Property, a multi-metal project that is host to promising tungsten-molybdenum and tin-indium-zinc mineralization. Located in Charlotte County, New Brunswick, the Mount Pleasant Mine Property is situated approximately 80 kilometres south of Fredericton, the provincial capital, and is 65 kilometres from the United States border. The common shares of Adex trade on the TSX Venture Exchange under the stock symbol "ADE," and the Company has 88,117,361 common shares issued and outstanding.

No securities commission or regulatory authority has approved or disapproved the contents of this press release.

FORWARD-LOOKING STATEMENTS

Certain statements in this press release may constitute "forward-looking" statements which involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements of Adex, its subsidiary or the industry in which they operate to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. When used in this press release, the words "estimate", "believe", "anticipate", "intend", "expect", "plan", "may", "should", "will", the negative thereof or other variations thereon or comparable terminology are intended to identify forward-looking statements. Such statements reflect the current expectations of the management of Adex with respect to future events based on currently available information and are subject to risks and uncertainties that could cause actual results, performance or achievements to differ materially from those expressed or implied by those forward-looking statements. These risks and uncertainties are detailed from time to time, including, without limitation, under the heading "Risk Factors", in reports filed by Adex with the Alberta, British Columbia and Ontario Securities Commissions which are available at www.sedar.com and to which readers of this press release are referred for additional information concerning Adex, its prospects and the risks and uncertainties relating to Adex and its prospects. New risk factors may arise from time to time and it is not possible for management to predict all of those risk factors or the extent to which any factor or combination of factors may cause actual results, performance and achievements of Adex to be materially different from those contained in forward-looking statements. Although the forward-looking statements contained in this press release are based upon what management believes to be reasonable assumptions, Adex cannot assure investors that actual results will be consistent with these forward-looking statements. Given these risks and uncertainties, investors should not place undue reliance on forward-looking statements as a prediction of actual results.

The forward-looking information contained in this press release is current only as of the date of the press release. Adex does not undertake or assume any obligation to release publicly any revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except as required by law.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this press release.
Contact:

Kabir Ahmed
Adex Mining Inc.
President, Chief Executive Officer and Director
1-866-508-2339 (ADEX)
investorrelations@adexmining.com
www.adexmining.com  

08.04.09 09:42

1575 Postings, 7617 Tage Ölmausauf deutsch:

:)

Adex Mining Inc. ('Adex' oder 'das Unternehmen')
(WKN: A0MXC1, ISIN: CA0069032070) gibt bekannt, dass man eine National
Instrument 43-101 ('NI 43-101') konforme Ressourcenschätzung für sieben
Zinn-Indium-Zink-Subzonen (Sn-In-Zn) und eine Wolfram-Molybdän-Wismut
(WO3-MoS2-Bi) Subzone, die zusammen die North Zone ('NZ') auf der
vollständig im Firmenbesitz befindlichen Mount Pleasant-Minenliegenschaft
im Südwesten von New Brunswick von Kanada ('Mount Pleasant' oder 'die
Liegenschaft') darstellen, abgeschlossen hat. Die Gesamtschätzung für die
Sn-In-Zn-Ressource beinhaltet eine Ressource der Kategorie 'angezeigt' von
10.882.000 Tonnen sowie eine Ressource der Kategorie 'geschlussfolgert' von
7.603.000 Tonnen.

Die NI 43-101 konforme Ressourcenschätzung für die NZ deutet darauf hin,
dass die Möglichkeit für sowohl nah an der Oberfläche gelegene als auch für
in der Tiefe gelegene Vererzungen gegeben ist. Dies ist von Bedeutung für
weitere Untersuchungen, wenn man das wirtschaftliche Potenzial der
Entwicklung eines nahe der Oberfläche gelegenen Tagebaubetriebs und/oder
eines Untertagebaus auf der NZ beurteilt.

Die NI 43-101 konforme Ressourcenschätzung, die von Watts, Griffis and
McOuat Limited ('WGM') unter Nutzung eines aktualisierten GEMCOM-Modells
abgeschlossen wurde, wurde in Verbindung mit der Bereitstellung eines
unabhängigen technischen Berichts gemäß NI 43-101 durch WGM, unter Aufsicht
von Trevor Boyd, P.Geo., dem geologischen Berater des Unternehmens,
erstellt.

Die Details der Ressourcenschätzung gemäß NI 43-101 finden Sie im
folgenden.

NORTH ZONE - RESSOURCENSCHÄTZUNG,

MOUNT PLEASANT-MINENLIEGENSCHAFT

Subzonen Tonnen % Sn g/t g/t In % % %- %- % %
In (gedec- Zn As WO3 M- Cu Bi
kelt) oS2
Angeze-
igt
Deep Tin 5.006 0,39 101 95,2 0, 1, 0, 0, 0, 0,
.000 ,0 86 25 08 06 14 08
Endogr- 4.336 0, 0, 0, 0, 0, 0,
anitic .000 0,55 21,8 20,3 28 85 12 06 10 09
Upper 838.0 102 1, 0, 0, 0, 0, 0,
Deep Tin 00 0,22 ,8 94,9 36 76 08 06 07 05
#4 Tin 702.0 1, 0, 0, 0, 0, 0,
Lode 00 0,25 74,1 74,1 00 19 01 01 09 00
Gesamt
Angeze- 10.88 0, 0, 0, 0, 0, 0,
igt 2.000 0,43 67,8 64,0 67 98 09 06 11 08
Inferred
#1-3 Tin 2.345 0,18 76,8 73,5 1, 0, 0, 0, 0, 0,
Lode .000 08 28 02 03 09 01
#5 Tin 1.267 0,15 115 111,3 1, 0, 0, 0, 0, 0,
Lode .000 ,4 50 70 07 04 08 03
North 3.076 0,27 62,1 62,1 0, 1, 0, 0, 0, 0,
Adit .000 83 16 09 06 09 07
North 915.0 0,26 54,3 49,8 0, 1, 0, 0, 0, 0,
W-Mo 00 58 14 25 12 12 10
Total 7.603 0,22 74,6 72,3 0, 0, 0, 0, 0, 0,
Inferred ,000 99 80 08 05 09 05

Die Ressourcenschätzung für die Sn-In-Zn Subzonen basierte auf einem
Cut-off-Grad von 0,25% Sn-Äquivalent (Sn Äqv.), d.h. gleich % Sn + 41.67 x
% In. Die 0,25% Sn-Äquivalent-Cut-off wurden von Adex basierend auf einem
Wert des vererzten Materials von 30 USD/Tonne geliefert, hergeleitet vom
vorhergehenden Sechsjahrespreistrend und der Preisbeziehung zwischen Zinn
und Indium unter Anwendung eines geschätzten Zinnpreises von 12,0 USD/kg
und eines Indiumpreises von 500USD/kg. Zink wurde in die Schätzung des
Cut-off-Grades nicht eingeschlossen. Im Einvernehmen mit WGM und basierend
auf diesen Metallpreisen, hat Adex beschlossen, dass 0,25% Sn-Äquivalent
ein akzeptabler Cut-off-Grad ist, um die Ressource zu melden.

Bis eine wirtschaftliche Einschätzung abgeschlossen ist, bleibt der
wirtschaftliche Cut-off für diese Lagerstätte unbekannt. Ressourcen, die
nicht in die Kategorie Reserven überführt wurden, haben ihre
wirtschaftliche Tragfähigkeit noch nicht nachgewiesen.

Eine Richtlinie, zur Deckelung hoher Indiumgehalte wurde, basierend auf der
statistischen Verteilung des Metalls in jeder einzelnen Subzone,
implementiert. Deshalb weisen die Subzonen Upper Deep Tin, Deep Tin, #5 Tin
Lode, #1-3 Tin Lode, Endogranitic und North W-Mo gedeckelte Indiumgehalte
von 965, 830, 750, 500, 200 und 200 g/t aus. Für die North Adit- Ader oder
die #4 Zinnader war keine Deckelung des Indiums erforderlich.

Wenn ein Cut-off-Grad von 0,30% WO3-Äquivalent auf die Schätzung der North
W-Mo Subzone angewendet wird, dann wird die geschlussfolgerte Ressource auf
3.278.800 Tonnen mit Gehalten von 0,10 % Sn, 23,5 g/t In (21,9 g/t In
gedeckelt) 0,27 % Zn, 1,02 % As, 0,27 % WO3, 0,16 % MoS2, 0,05 % Cu und
0,14 % Bi geschätzt. Der Cut-off-Grad von 0,30% WO3-Äquivalent,
entsprechend % WO3 + 1,5 x % MoS2, wurde von Adex geliefert. Dies basiert
auf einem Wert des vererzten Materials von 30 USD/Tonne bei einem
Wolframpreis von 100USD/metrischer Tonne (MTU) (10,0/kg WO3) ähnlich jenem,
der für die Ressourcenschätzung gemäß NI 43-101 und den technische Bericht
für die Fire Tower Zone ('FTZ') auf der Liegenschaft angesetzt wurde. Der
technische Bericht über die FTZ ('technische Bericht FTZ') mit dem Titel 'A
Technical Review of the Mount Pleasant Property, Including an updated
Mineral Resource Estimate on the Fire Tower Zone, Southwestern New
Brunswick for ADEX Mining Inc.' vom 01. Dezember2008, der von Paul Dunbar,
M.Sc., P.Geo. Senior Associate Geologist of Watts, Griffis and McOuat
Limited, Dorota A. El-Rassi, M.Sc., P.Eng., Geological Engineer of SRK
Consulting und John S. Rogers, P.Eng., of Aker Metals, einer Division von
Aker Solutions Canada Inc. abgeschlossen wurde, ist auf www.SEDAR.com
verfügbar.

Die Begrenzungen der Vererzungen wurden manuell von Trevor Boyd, P.Geo.,
dem geologischen Berater des Unternehmens interpretiert. Die
Vererzungszonen schnitten im Allgemeinen geologische Einheiten und
strukturelle Grenzen. Entsprechend wurden die Ressourcenbegrenzungen
ausschließlich anhand der % Sn- und % In-Werte (oder % WO3- und %
MoS2-Werte im Fall der North W-Mo Subzone) bestimmt. Diese wurden auf
Querschnitte mit einem Abstand von 25 Metern aufgezeichnet und die
Vererzungsbegrenzungen wurden auf halbem Wege zwischen den Bohrlöchern
eingetragen. Wo keine Bohrlöcher existierten, um die Vererzungen zu
begrenzen, wurden die Grenzen um maximal 20 Meter vom nächsten Bohrloch
ausgedehnt. Im allgemeinen wurden die Ausdehnungen der Begrenzungen
übereinstimmend mit den Trends eingezeichnet, die definiert wurden, indem
man die bekannten Cut-off-Begrenzungen miteinander verband. Eine minimale
Breite von 3 Metern wurde verwendet, um die Zonen zu definieren und eine
spezifische Schwere von 2,70 wurde zur Schätzung der Ressourcen angewendet.

Die acht so modellierten Subzonen, aus denen die North Zone besteht, sind
über eine Fläche von 450 mal 250 Metern verteilt, die sich von der
Oberfläche bis zu einer vertikalen Tiefe von 450 Metern erstreckt. Sie
liegen 800 Meter nördlich der WO3 - MoS2 FTZ für die eine NI 43-101
konforme angezeigte Ressource von 13.489.000 Tonnen sowie eine
geschlussfolgerte Ressource von 841.700 Tonnen im technischen Report zur
FTZ gemeldet wurden.

Die Subzonen der #4 Zinnader und der #5 Zinnader erstrecken sich von der
Oberfläche bis in eine vertikale Tiefe von 70 Metern. Die Subzone der #1-3
Zinnadern erstreckt sich von der Oberfläche bis zu einer vertikalen Tiefe
von 160 Metern. Die Zinnsubzone Upper Deep liegt unter der #5 Zinnader und
erstreckt sich von 80 bis 160 Metern vertikaler Tiefe. Die Subzone Deep Tin
erstreckt sich 40 Meter seitlich der Zinnzone Upper Deep Tin Zone von 140
bis 270 Meter vertikaler Tiefe. Die Subzone North Adit besteht aus vier
Vererzungsbereichen von nahe der Oberfläche bis zu einer vertikalen Tiefe
von 250 Metern. Die Subzone North W-Mo besteht aus drei
Vererzungsbereichen zwischen 80 und 350 Metern vertikaler Tiefe. Die
Subzone Endogranitic erstreckt sich von 250 bis 450 Meter vertikaler Tiefe.
An Abhang von 1.100 Metern, der 1986 genutzt wurde, um Großproben zu
sammeln, erstreckt sich von den unterirdischen Arbeiten der Fire Tower Zone
bis zu der Subzone Endogranitic. Der Abhang und die unterirdischen Arbeiten
sind zurzeit geflutet. Eine Explorationsbohrung aus den 1960ern erstreckt
sich von der Oberfläche bis in die Nähe Subzonen der Zinnader #4 und der
Zinnadern #1-3. Der Zustand dieser Bohrung ist derzeit nicht bekannt.

Die Ressourcen werden in Übereinstimmung mit NI 43-101 und den
Definitionsstandards des Canadian Institute of Mining, Metallurgy and
Petroleum ('CIM') von November 2004 gemeldet und wurden zudem in
Übereinstimmung mit den Estimation of Mineral Resource and Mineral Reserves
Best Practices Guidelines des CIM von November 2003 geschätzt. Das
Unternehmen hat mit Aufnahme des Bohrprogramms ein branchenübliches
Qualitätskontrollprogramm für seine Kernbohrungen und Punzierung
implementiert.

Paul Dunbar, M.Sc., P.Geo., Senior Associate Geologist bei WGM und eine
qualifizierte Person gemäß NI 43-101, besuchte die Mount
Pleasant-Minenliegenschaft im Mai und Juni 2008. Während dieser Besuche vor
Ort untersuchte er das Bohrprogramm und die Bohrkerne und schloss
Überprüfungen der Kernproben ab. Robert de l'Etoile, P.Eng., Geological
Engineer und Berater für WGM eine qualifizierte Person gemäß NI 43-101,
überprüfte die Probeergebnisse mithilfe der GEMCOM-Datenbank. Die
Datenbanküberprüfung stellte keine signifikanten Diskrepanzen in den
geologischen Informationen fest, was dem Branchenstandard entspricht.
Duplikate der Bohrkernproben wurden, ohne Wissen des Labors, an ein zweites
Labor geschickt, womit Standardqualitätssicherungsprotokolle erfüllt
wurden. Die analytischen Ergebnisse einiger dieser Proben stehen noch aus.

Weder Trevor Boyd, der geologische Berater des Unternehmens, noch Paul
Dunbar, Robert de l'Etoile oder dem Management des Unternehmens sind
irgendwelche bekannte umwelttechnische, Genehmigungs-, rechtliche,
eigentumsrechtliche, steuerliche, sozialpolitische, Marketing- oder andere
relevante Probleme bekannt, die die Schätzung der Ressource wesentlich
beeinflussen könnten.

Trevor Boyd, P.Geo., der geologische Berater des Unternehmens, überwachte
die Erstellung der Ressourcenschätzung für die North Zone und die
technischen Informationen in dieser Pressemitteilung gemäß NI 43-101. Paul
Dunbar erstellt den technischen Bericht gemäß NI 43-101 für die North Zone,
en Adex innerhalb von 45 Tagen ab dem heutigen Datum bei SEDAR einreichen
wird.

Weitere Informationen zu der Liegenschaft finden Sie im technischen Bericht
zur FTZ.

ÜBER ADEX

Adex Mining Inc. ist ein junges, aufstrebendes Bergbauunternehmen aus
Kanada mit einem erfahrenden Managementteam. Das Unternehmen konzentriert
sich auf die Entwicklung seines Flagschiffprojekts, der Mount
Pleasant-Liegenschaft, einem Multimetallprojekt, auf dem vielversprechende
Wolfram-Molybdän- und Zinn-Indium-Zinkmineralisierungen zu finden sind. Die
Mount Pleasant-Minenliegenschaft liegt in Charlotte County, New Brunswick,
knapp 80 Kilometer südlich von Fredericton, der Provinzhauptstadt, und rund
65 Kilometer von der Grenze zu den Vereinigten Staaten entfernt. Die Aktien
des Unternehmens werden am TSX Venture Exchange mit dem Symbol 'ADE' und in
Frankfurt mit der WKN A0MXC1 gehandelt. Das Unternehmen hat 88.117.361
Stammaktien ausstehend und ausgegeben.

Keine Wertpapier- oder andere Behörde hat den Inhalt dieser
Pressemitteilung genehmigt oder abgelehnt.

Der TSX Venture Exchange übernimmt keine Verantwortung für die
Angemessenheit oder Fehlerfreiheit dieser Pressemitteilung.

Kontakt:

Adex Mining Inc.
Kabir Ahmed
President, Chief Executive Officer und Director

+1-866-508-2339
Email: investorrelations@adexmining.com

Die Ausgangssprache, in der der Originaltext veröffentlicht wird, ist die
offizielle und autorisierte Version. Übersetzungen werden zur besseren
Verständlichkeit geliefert. Nur die Sprachversion, die im Original
veröffentlicht wurde, ist rechtsgültig. Gleichen Sie deshalb Übersetzungen
mit der originalen Sprachversion der Veröffentlichung ab.

Vorausschauende Aussagen

Bestimmte Aussagen in dieser Pressemitteilung könnten so genannte
Vorausschauende Aussagen darstellen, die bekannte und unbekannte Risiken,
Unsicherheiten und andere Faktoren beinhalten, die dazu führen könnten,
dass die tatsächlichen Ergebnisse, die Performance oder Erfolge von Adex,
seiner Tochtergesellschaften oder der Branche, in der diese tätig sind,
substanziell von zukünftigen Ergebnissen, Performance oder Erfolgen
abweichen können, die durch solche zukunftsorientierte Aussagen ausgedrückt
oder impliziert werden. Wenn in dieser Pressemitteilung die Worte
'schätzen', 'glauben', 'erwarten', 'vorhaben', 'davon ausgehen', 'planen',
'könnte', 'sollte', 'werden', deren negative Form oder andere Variation
derselben Worte oder vergleichbare Terminologie genutzt wird, sollen diese
solche vorausschauenden Aussagen identifizieren. Solche Aussagen spiegeln
die derzeitigen Erwartungen des Managements von Adex in Bezug auf
zukünftige Ereignisse basierend auf den derzeit verfügbaren Informationen
wieder und unterliegen Risiken und Unsicherheiten, die dazu führen könnten,
dass die tatsächlichen Ergebnisse, Performance oder Leistungen substanziell
von jenen abweichen, die in diese zukunftsorientierten Aussagen ausgedrückt
oder impliziert werden. Diese Risiken und Unsicherheiten werden von Zeit zu
Zeit, darin ohne Einschränkung eingeschlossen, unter der Überschrift
'Risikofaktoren' in den Berichten, die Adex bei der Alberta, British
Columbia und Ontario Securities Commissions einreicht, die unter
www.sedar.com eingesehen werden können, und auf die wir die Leser dieser
Pressemitteilung, die mehr über Adex, seine Aussichten sowie die Risiken
und Unsicherheiten erfahren möchten, hinweisen. Es kann geschehen, dass von
Zeit zu Zeit neue Risikofaktoren entstehen und es ist dem Management nicht
möglich, all diese Risikofaktoren oder das Ausmaß, in dem diese Faktoren
allein oder in Kombination dazu führen könnten, dass die tatsächlichen
Ergebnisse, Performance und Leistungen von Adex substanziell anders
ausfallen können, als in den vorausschauenden Aussagen dargestellt. Obwohl
die vorausschauenden Aussagen in dieser Pressemitteilung darauf basieren,
was das Management zu diesem Zeitpunkt für vernünftige Annahmen hält, kann
Adex Investoren nicht versichern, dass die tatsächlichen Ergebnisse mit
diesen vorausschauenden Aussagen übereinstimmen werden. Angesichts dieser
Risiken und Unsicherheiten, sollten Investoren nicht übermäßig auf
vorausschauende Aussagen als eine Vorhersage tatsächlicher Ergebnisse
vertrauen.

Die zukunftsorientierten Informationen in dieser Pressemitteilung sind nur
zum Erscheinungsdatum dieser Pressemitteilung aktuell. Adex unternimmt
nichts und übernimmt keine Verpflichtung, Änderungen an diesen
vorausschauenden Aussagen zu veröffentlichen, um Ereignissen oder Umständen
gerecht zu werden, die nach diesem Datum liegen, oder um nicht zu
erwartende Ereignisse dazustellen.  

09.04.09 09:25

1575 Postings, 7617 Tage ÖlmausPressebericht zu Adex Mining

gerade bei w:o gefunden

Adex hits $2.5B worth of resources
http://nbbusinessjournal.canadaeast.com/journal/article/6287…

Adex Mining Inc. (TSX.V:ADE) has released the results of a mineral resource estimate of the north zone of Mount Pleasant, 80 kilometres south of Fredericton. The report showed 10.88 million tonnes of tin-indium-zinc based on sample analysis and geologic projections and another 7.6 million tonnes of the resources from projections alone.

Based on "back of envelope calculations," the company said the partially sample-based resources estimates could be worth about $900 million and the projected resources could be worth $600 million.

"The results from our drill program, a 43-101 compliant mineral resource estimate, has not only significantly increased the size of the resource but it also has upgraded the quality of the resource," Adex president and chief executive Kabir Ahmed said. A 1997 report had estimated 3.65 million tonnes of resources in the north zone.

"Because of the dramatic increase in the size of the resource we have most likely increased the economic viability of this project," Ahmed said.

But Adex is holding back on development given the current low metal prices and tight credit markets.

"We are sort of taking a wait-and-see approach," Ahmed said. "The moment we see a revival of metal prices and a relaxing of the capital markets we would then proceed to feasibility, because feasibility would cost anywhere between three and five million dollars."

He said a 20 to 30 per cent increase on the current prices would be enough incentive to move ahead.

Tin is currently trading just under $11 per kilogram on the London Metal Exchange but last spring was at a high of $26 per kilogram. Indium is currently trading at around $300 per kilogram but was at about $700 per kilogram last spring.

When Adex came up with the $1.5 billion estimation it was based on a $12 per kilogram tin price and a $500 per kilogram indium price, which the company believed to be conservative given the prices were $17 and $675, respectively, at the time.

Though current prices are below Adex's estimates University of New Brunswick economic geology professor David Lentz said the company had the right approach considering "metal prices are still fluctuating much more than they ever have before."

Once prices increase to a stable level again, Adex's first course of action will be to have an economic assessment done to provide a more scientific estimate. In December Adex announced the results of a similar assessment of its Fire Tower zone, also at Mount Pleasant. That zone was said to have 13.5 million tonnes of resources, mainly tungsten, worth $1 billion over a thirteen year mine life.

Australian mining company BHP Billiton Ltd. (NYSE:ADR) had extracted a tonne of tungsten from the Fire Tower zone in the 1980s, but stopped mining because of low prices. Adex bought the Mount Pleasant site in 1997 and looked to mine the north zone as well.

With a possible $2.5 billion in resources Lentz said Adex is well positioned.

"It's not money in the bank but it's wealth in the ground," he said. "When we compare this world wide, Mount Pleasant is a very significant resource. One of the biggest indium resources in the world."

"We're looking at something that is going to be economically viable in high times and low times," Lentz said.

Indium is used in plasma, LCD and touch screens as well as solar panels, where as most of the other resources under Adex's land, like tin and tungsten, are used in various construction materials.  

13.04.09 09:13

1244 Postings, 5485 Tage haasyboyabwarten

unsere zeit kommt noch,,,,,2011,,,600% plus,,,,,nur die ruhe  

26.04.15 09:15

1244 Postings, 5485 Tage haasyboyLöschung


Moderation
Zeitpunkt: 28.04.15 11:41
Aktion: Löschung des Beitrages
Kommentar: Off-Topic

 

 

   Antwort einfügen - nach oben