15.11.11 19:11

4 Postings, 4816 Tage GozillaDas sieht ja alles toll aus

Habe gerade 10.000 Aktien eingelocht. Hoffentlich klappt das auch alles so.

 

16.11.11 05:42
1

183 Postings, 4991 Tage blue labelAltona Mining drilling extends copper....

 

Altona Mining

Altona Mining's (ASX: AOH) two key assets are the  Outokumpu Project in Finland and the Roseby Project in Queensland,  Australia. The Kylylahti mine at Outokumpu is under development, Altona  is targeting production of 8,000 tonnes of copper, 8,400 ounces of gold  and 1,600 tonnes of zinc annually.

 

Roseby is one of the largest copper resources in Australia, where  Altona is targeting copper production of up to 40,000 tonnes per annum.

                Altona Mining drilling extends copper mineralisation at Roseby project

Wednesday, November 16, 2011 by Jeff Coote

Altona Mining drilling extends copper mineralisation at Roseby project

Altona Mining (ASX: AOH) has intersected further copper  mineralisation from reverse circulation drilling at its 100%-owned  Roseby Copper Project in the Mt Isa-Cloncurry mining district in  Queensland.

The drilling targeted strike and dip extensions to  the Blackard Deposit and the Lady Clayre Deposit whilst drilling at  Little Eva North tested a possible repeat of the Little Eva main zone.

Better intersections from drilling at a 0.30% copper cut-off grade include:

Blackard

- 67 metres at 0.89% copper from 94 metres;
- 91 metres at 0.87% copper from 65 metres; and
- 72 metres at 0.81% copper from 32 metres.

Lady Clayre

- 9 metres at 1.41% copper and 0.48 grams per tonne (g/t) gold from 6 metres;
- 16 metres at 1.20% copper and 0.50 g/t gold from 144 metres; and
- 15 metres at 1.11% copper and 0.76 g/t gold from 71 metres.

Little Eva North

- 4 metres at 2.26% copper and 0.89 g/t gold from 47 metres;
- 7 metres at 0.43% copper from 20 metres; and
- 10 metres at 0.38% copper and 0.2 g/t gold from 59 metres.

The  latest drilling consisted of 41 reverse circulation drill holes for  6,006 metres and three diamond drill holes for 549 metres.

The  drilling was designed to increase resources and improve understanding of  the continuity and style of mineralisation. Diamond drilling at  Blackard was also conducted to provide material for metallurgical test  work.

The wet season has now commenced in the Cloncurry area and  as a result the final resource estimate is not expected until late  December at the earliest.

Roseby is one of Australia’s largest  undeveloped copper resources covering over 1,400 square kilometres and  is a major strategic land holding being only 95 kilometres northeast of  the major mining centre of Mt Isa.

Despite the large copper and  gold Resources that have already been declared, the project remains  highly prospective and under-explored.

In addition to excellent  copper and gold exploration potential, the project is prospective for  the discovery of uranium, molybdenum, rare earth elements (REE) and zinc  deposits

A Definitive Feasibility Study (DFS) completed in 2009  envisaged the production of 26,000 tonnes per annum of copper, and 7,500  ounces per annum of gold for 10 years from a 5Mtpa open pit-mining  operation.

Environmental and regulatory approvals for  construction of this substantial mining operation are well advanced. A  new DFS targeting a larger operation is scheduled for completion in  2012.

 

 

 

16.11.11 17:48

3754 Postings, 5544 Tage tolksvarund nocheinmal

Ressourcen auf Roseby



Altona Mining Ltd.: Bohrungen erweitern nachgewiesene Ressourcen auf Roseby

DGAP-News: Altona Mining Ltd. / Schlagwort(e): Bohrergebnis Altona Mining Ltd.: Bohrungen erweitern nachgewiesene Ressourcen auf Roseby

16.11.2011 / 14:16


--------------------------------------------------


West Perth, Western Australia, Australien. 16. November 2011. Altona Mining Limited (WKN: A1C15Y; ASX: AOH) (kurz 'Altona Mining' oder 'das Unternehmen') gibt hervorragende Bohrergebnisse vom sich vollständig in Unternehmensbesitz befindlichen Roseby-Kupferprojekt im australischen Bundesstaat Queensland bekannt.

Die jüngsten Bohrergebnisse basieren auf 41 Rückspül-Bohrungen im Umfang von 6.006 Bohrmetern und drei Kern-Bohrungen im Umfang von 549 Bohrmetern. Die Bohrungen waren dazu ausgelegt, die nachgewiesenen Ressourcen zu erhöhen und das Verständnis über die Kontinuität und den Typ der Vererzung zu verbessern.

Die Rückspül-Bohrungen zielten auf Erweiterungen der Lagerstätten Blackard und Lady Clayre in Streichrichtung und zur Tiefe hin ab. Rückspül-Bohrungen auf der Lagerstätte Little Eva North zielten darauf ab zu prüfen, ob sich die Hauptzone Litte Eva wiederholt. Kern-Bohrungen auf Blackard zielten auf die Gewinnung von Material für metallurgische Prüfungen ab.

Einige herausragende Ergebnisse der Bohrungen bei einem Cut-Off-Kupfergehalt von 0,3 %:

Blackard

Bohrung BCR889: 67 Bohrmeter mit 0,89 % Kupfergehalt ab 94 m Tiefe BCR884: 91 m mit 0,87 % Kupfer ab 65 m BCR893: 72 m mit 0,81 % Kupfer ab 32 m BCR882: 62 m mit 0,79 % Kupfer ab 97 m BCR890: 66 m mit 0,73 % Kupfer ab 20 m BCR894: 110 m mit 0,72 % Kupfer ab 12 m BCR896: 77 m mit 0,71 % Kupfer ab 24 m

Lady Clayre

LCR172: 9 m mit 1,41 % Kupfer und 0,48 g/t Gold ab 6 m LCR177: 16 m mit 1,20 % Kupfer und 0,50 g/t Gold ab 144 m LCR169: 15 m mit 1,11 % Kupfer und 0,76 g/t Gold ab 71 m LCR176: 14 m mit 0,80 % Kupfer und 0,32 g/t Gold ab 88 m

Little Eva North

LER638: 4 m mit 2,26 % Kupfer und 0,89 g/t Gold ab 47 m LER640: 7 m mit 0,43 % Kupfer ab 20 m LER646: 10 m mit 0,38 % Kupfer und 0,2 g/t Gold ab 59 m

Blackard

Die Bohrungen auf Blackard bestanden aus 15 Rückspül-Bohrungen als Auffüll- und Erweiterungs-Bohrungen und aus drei Kern-Bohrungen zur Gewinnung von metallurgischen Proben. Die Bohrungen sind mit sehr guten Ergebnissen, die die Interpretation einer Kontinuität der bekannten Ressource bestätigen, abgeschlossen worden. Weitere vier Rückspül-Bohrungen sind niedergebracht worden, um das Potenzial für eine oberflächennahe und damit im Tagebau abbaubare Sulfid-Vererzung zu prüfen.

Lady Clayre

Die Bohrungen bestanden aus 10 Bohrungen im Umfang von 1.176 Bohrmetern und dienten sowohl zur Bestätigung der Ressource in einem engeren Raster als auch der Prüfung der Kontinuität und von Erweiterungen der Vererzung innerhalb der östlichen Zone. Der Großteil der Bohrungen traf auf kurze Bereiche mit hohen Gehalten an Kupfer-Gold-Erz. Der längste Bohrabschnitt mit Vererzung ist 16 m lang und hat 1,2 % Kupfer und 0,50 g/t Gold ab 144 m Bohrtiefe in Bohrung LCR177. Der Ein-Meter-Bohrabschnitt mit den höchsten Gehalten hatte 5,93 % Kupfer und 4,09 g/t Gold (LCR169 ab 73 m). Außerdem sind bedeutende Silber- und Zink-Vererzungen in mehreren Bohrungen angetroffen worden. Einzelne Proben haben Gehalte von bis zu 51 g/t Silber und 0,6 % Zink.

Die Bohrungen bestätigen das Potenzial für Erweiterungen nach Norden, Westen und zur Tiefe hin entlang der Zone F. Außerdem haben Auffüll-Bohrungen in Streichrichtung eine bessere Kontinuität der Vererzung nachgewiesen als vorangegangene Bohrungen im größeren Raster ergeben haben.

Little Eva North

Mehrere Zielbereiche mit übereinstimmenden geochemischen, geophysikalischen und geologischen Anomalien sind auf 500 m in Streichrichtung auf Little Eva North durch Bohrungen geprüft worden. Bohrungen trafen in zwei Bereichen auf kurze Abschnitte mit Kupfer-Gold-Erz, ca. 400 m nördlich der aktuell nachgewiesenen Ressource. Hierzu gehört auch ein Bohrabschnitt von 4 m Länge mit 2,26 % Kupfer und 0,89 g/t Gold.

Die Bohrungen bestätigen, dass ähnliche Arten von Vererzungen entlang einer beträchtlichen Länge in Streichrichtung auftreten. Es verbleiben weitere Potenziale für Erweiterungen, die durch Bohrungen zu prüfen sind.

Ressourcen-Schätzung

Im Gebiet Cloncurry hat die Regenzeit eingesetzt. Das hat die Exploration behindert. Aktuell stehen weitere Untersuchungen an ca. 100 Bohrlöchern aus. Die Verzögerung in der Verfügbarkeit der so zu gewinnenden Daten verschiebt die endgültige Ressourcen-Schätzung auf frühestens Ende Dezember.

Details der Bohrergebnisse, die bisherige Ressourcen-Schätzung, schematische geologische Karten und weitere Angaben sind im Anhang der ursprünglichen englischen Pressemitteilung angegeben, die als PDF-Datei mit folgendem Link abrufbar ist.

http://www.altonamining.com/static/uploads/documents/AOH0244AC_-_Dri lling_ continues_to_expand_Roseby.pdf

Für weitere Informationen wenden Sie sich bitte an:

Altona Mining Limited Ground Floor, 1 Altona Street West Perth, WA 6005 Australien Tel: +61 8 9485 2929 www.altonamining.com

AXINO AG investor & media relations Königstraße 26 70173 Stuttgart Germany Tel. +49 (711) 253592-30 Fax +49 (711) 253592-33 www.axino.de

Dies ist eine Übersetzung der ursprünglichen englischen Pressemitteilung. Nur die ursprüngliche englische Pressemitteilung ist verbindlich. Eine Haftung für die richtige Übersetzung wird ausgeschlossen.  

17.11.11 14:39

3754 Postings, 5544 Tage tolksvarendlich, sieht sehr gut aus

Altona Mining: Neueste Bohrungen weiten Kupfervererzungen auf dem Roseby-Projekt erneut aus

09:34 16.11.11Altona Mining: Neueste Bohrungen weiten Kupfervererzungen auf dem Roseby-Projekt erneut aus Im Rahmen eines umfassenden Bohrprogramms zur Erweiterung der Ressourcen auf seinem australischen Roseby-Projekt kann der angehende Kupferproduzent Altona Mining (WKN A1C15Y) erneut positive Ergebnisse präsentieren. Hatte man sich zuletzt erfolgreich auf die Lagerstätte Little Eva konzentriert und dort nach der Ressourcenausweitung von 30,4 auf 74,7 Mio. Tonnen Erz weitere positive Resultate präsentiert, so kann Altona dies nun auch von den Lagerstätten Blackard und Lady Clayre melden.

Denn wie das Unternehmen bekannt gab hat man auf Blackard 15 Bohrungen zur Bestätigung und Ausweitung der bekannten Ressourcen durchgeführt und zudem drei weitere Bohrungen zur Entnahme von Proben für metallurgische Tests gesetzt. Die Ergebnisse fielen laut dem Unternehmen sehr gut aus und bestätigten die geologische Interpretation der Ausdehnung der bekannten Ressource. Weitere vier Bohrungen wurden bereits durchgeführt, um das Potenzial auf nahe der Oberfläche gelegene im Tagebau zu fördernde Sulfidvererzung zu testen. Die Highlights der Bohrungen auf Blackard waren unter anderem:

- 67 Meter bei0,89% Kupfer
- 91Meter bei 0,87% Kupfer
- 72 Meter bei 0,81% Kupfer
- 62 Meter bei 0,79% Kupfer und
- 66 Meter mit 0,73% Kupfer

Mit den Bohrungen auf der Lagerstätte Lady Clayre wollte Altona Mining die bestehenden Ressourcen genauer definieren und die Ausdehnung der Vererzung innerhalb der östlichen Zone überprüfen, was auch gelang. Zu diesem Zweck brachte das Unternehmen hier 10 Bohrungen von insgesamt 1.176 Meter Länge nieder. Mit dem Großteil der Bohrungen stieß das Unternehmen von Managing Director Alistar Cowden auf schmale aber hochgradige Kupfervererzung.

Der breiteste einzelne Abschnitt betrug dabei 16 Meter bei 1,2% Kupfer und 0,50 Gramm Gold pro Tonne, während der höchste aufgefundene Kupfergehalt bei 5,93% und der höchste Goldgehalt bei 4,09 Gramm pro Tonne lag. Die Bohrungen bestätigten insgesamt das Potenzial auf weitere Ausdehnungen der Vererzung nach Norden, Westen sowie im Abfallen der Zone F und deuten darüber hinaus auf eine höhere Kontinuität der Vererzung hin, als auf Grund der bisherigen Ressourcenmodelle angenommen wurde. Zusätzlich konnte Altona noch signifikante Silber- und Zinkvererzungen in mehreren Bohrlöchern nachweisen. Die Highlights der Bohrungen auf Lady Clayre waren unter anderem:

- 9 Meter mit 1,41% Kupfer und 0,48 Gramm Gold pro Tonne




- 16 Meter mit 1,20% Kupfer und 0,50 Gramm Gold pro Tonne
- 15 Meter mit 1,11% Kupfer und 0,76 Gramm Gold pro Tonne sowie
- 14 Meter mit 0,80% Kupfer und 0,32 Gramm Gold pro Tonne

Auch auf Little Eva, genauer gesagt auf der Zone Little Eva North, war Altona Mining erneut aktiv. Hier testete man mehrere geochemische, geophysikalische und geologische Hinweise über eine Streichlänge von rund 500 Metern. Dabei stieß das Unternehmen in zwei Sektionen, rund 400 Meter nördlich der bisherigen Ressource, auf schmale Zonen von Kupfer- und Goldvererzung. Darunter fand sich unter anderem ein Abschnitt von 4 Metern Länge mit 2,26% Kupfer und 0,89 Gramm Gold je Tonne. Die Bohrungen bestätigten zudem, dass ähnliche Vererzung in Streichrichtung über erhebliche Längen aufzufinden ist. Damit besteht weiteres Potenzial für eine Ausdehnung der Lagerstätte, das durch zusätzliche Bohrungen überprüft werden soll. Die Highlights der Bohrungen auf Little Eva North waren unter anderem:

- 4 Meter mit 2,26% Kupfer und 0,89 Gramm Gold je Tonne
- 7 Meter mit 0,43% Kupfer und
- 10 Meter mit 0,38% Kupfer sowie 0,2 Gramm Gold pro Tonne

Wir betrachten die neuen Bohrergebnisse von Altonas Roseby-Projekt als exzellent. Es zeigt sich, dass nicht nur die Lagerstätte Little Eva zum Wachstum der Ressource der Liegenschaft beitragen dürfte, sondern auch Blackard und Lady Clayre einen nicht unerheblichen Beitrag liefern sollten. Damit dürfte die Gesamtressource des Projekts – auch angesichts der anderen, seit dem letzten Ressourcenupdate vorgelegten Bohrergebnisse von Little Eva – deutlich über die bislang gemeldeten 1,1 Mio. Tonnen enthaltenen Kupfers und 296.000 Unzen enthaltenen Goldes hinaus anwachsen.

Dies ist insbesondere positiv, da die Bohrungen dem Zweck dienen, die bestehende Machbarkeitsstudie zu aktualisieren, die „nur“ von einer Kupferproduktion von 26.000 Tonnen Kupfer pro Jahr auf Roseby ausgeht. Laut Managing Director Alistair Cowden glaubt das Unternehmen aber, dass eine Produktion von 40.000 Tonnen des roten Metalls pro Jahr möglich sein sollte.

Allerdings wird eine neue Ressourcenschätzung wohl frühestens Ende Dezember 2011 vorgelegt werden können, wie das Unternehmen heute ebenfalls mitteilte. Das ist auf den Beginn der Regenzeit zurückzuführen, die es erschwert, die zusätzlich nötigen Informationen von den Bohrungen einzuholen. Diese Verzögerung ist zwar schade, aber unserer Ansicht nach kein Beinbruch. Das Potenzial des Roseby-Projekts ist unserer Meinung nach auch so klar erkennbar und gewaltig  

17.11.11 17:22
2

183 Postings, 4991 Tage blue labelOutperform: Credit Suisse sieht Kursziel...

 

Outperform: Credit Suisse sieht Kursziel für Altona Mining bei 0,65 australischen Dollar

14:35 17.11.11

Outperform: Credit Suisse sieht Kursziel für Altona Mining bei 0,65  australischen Dollar <AU000000AOH9> Die Analysten der Credit  Suisse haben Anfang November die Berichterstattung zu dem angehenden  Kupferproduzenten Altona Mining (WKN A1C15Y) aufgenommen. Sie vergeben das Rating „outperform“ und ein Kursziel von 0,65 australischen Dollar.

Altona Mining sei ein Kupferunternehmen in der Entwicklungsphase, also  im Übergang vom Explorer zum Produzenten, mit Projekten in Finnland und  im australischen Queensland, so die Experten. Man betrachte das  Outokumpu-Projekt in Finnland, das von moderater Größe sei, als einen  Einstieg mit vergleichsweise geringem Risiko in eine historische  Bergbauregion, hieß es weiter. Die Aufnahme der kommerziellen Produktion  erwartet die Credit Suisse dort für das zweite Quartal 2012. Das  größere, weniger weit fortgeschrittene Roseby-Projekt in Queensland  befinde sich in der Explorations- bzw. anfänglichen Entwicklungsphase in  der erstklassigen Bergbauregion Mount Isa/Cloncurry. Das Projekt  schreite auf dem Weg zu einer mittelgroßen, technisch einfachen  Kupferproduktion ab 2014 voran, so die Analysten.

Für das Outokumpu-Projekt geht die Credit Suisse von einer Kapazität von  zunächst 550.000 Tonnen Erz pro Jahr aus, die später auf 800.000 Tonnen  pro Jahr erweitert werden sollte. Bei den für die auf Outokumpu  gemeldeten Reservengehalten sollte so eine Produktion von 8.000 und  später von 12.000 Tonnen Kupfer pro Jahr erreicht werden können,  erklären die Experten der Credit Suisse. Für das Roseby-Projekt geht man  von einer Anlage mit einer Kapazität von 6 Mio. Tonnen pro Jahr aus,  die ab 2015 40.000 Tonnen Kupfer produzieren soll und später dann auf 10  Mio. Tonnen Durchsatz pro Jahr erweitert werden dürfte.

Nach Ansicht der Credit Suisse machen Altonas Ressource von 1,1 Mio.  Tonnen Kupfer und der gewaltige Landbesitz des Unternehmens in  Australien das Unternehmen zu einem potenziellen Übernahmeziel. Der  weitere Weg des Roseby-Projekts hänge allerdings an einer Deadline zum  30. Juni 2012. Denn dann habe der Bergbauriese Xstrata die Option, unter  bestimmten Voraussetzungen 51% an dem Projekt zu erwerben. Sollte  dieser Fall eintreten, so die Analysten, müsse man wohl die Annahmen zur  Finanzierung, den Eigentumsverhältnissen und potenziell auch zum  Projektausbau überarbeiten.

Das Kursziel von 0,65 AUD basiere auf dem operativen, groben NPV (Net  Present Value) für beide Projekte von Altona Mining sowie auf den  Prognosen der Credit Suisse zu den Rohstoffpreisen und Wechselkursen  sowie einer Abzinsungsrate von 8,2%. Dabei nehmen die Analysten einen  langfristigen Kupferpreis von 2,50 USD pro Pfund Kupfer sowie einen  Wechselkurs von AUD zu USD von 0,85 Dollar an. Somit komme man zu dem  Rating „outperform“.


Die hier angebotenen Artikel stellen keine Kauf- bzw.  Verkaufsempfehlungen dar, weder explizit noch implizit sind sie als  Zusicherung etwaiger Kursentwicklungen zu verstehen. Die GOLDINVEST  Media GmbH und ihre Autoren schließen jede Haftung diesbezüglich aus.  Die Artikel und Berichte dienen ausschließlich der Information der Leser  und stellen keine wie immer geartete Handlungsaufforderung dar.  Zwischen der GOLDINVEST Media GmbH und den Lesern dieser Artikel  entsteht keinerlei Vertrags- und/oder Beratungsverhältnis, da sich  unsere Artikel lediglich auf das jeweilige Unternehmen, nicht aber auf  die Anlageentscheidung, beziehen. Wir weisen darauf hin, dass Partner,  Autoren und Mitarbeiter der GOLDINVEST Media GmbH Aktien der jeweils  angesprochenen Unternehmen halten oder halten können und somit ein  möglicher Interessenkonflikt besteht. Wir können nicht ausschließen,  dass andere Börsenbriefe, Medien oder Research-Firmen die von uns  empfohlenen Werte im gleichen Zeitraum besprechen. Daher kann es in  diesem Zeitraum zur symmetrischen Informations- und Meinungsgenerierung  kommen.
 

Hinweis: ARIVA.DE veröffentlicht in  dieser Rubrik Analysen, Kolumnen und Nachrichten aus verschiedenen  Quellen. Verantwortlich für den Inhalt ist allein der jeweilige Autor.

 

 

21.11.11 09:01

3754 Postings, 5544 Tage tolksvarnews

Initial Director`s Interest NoticeMon, 21 Nov 2011 17:11:00 +1000       49 minutes ago


Appendix 3X Initial Director’s Interest Notice Rule 3.19A.1 Appendix 3X Initial Director’s Interest Notice Information or documents not available now must be given to ASX as soon as available. Information and documents given to ASX become ASX’s property and may be made public. Introduced 30/9/2001.

Name of entity ABN Bass Metals Ltd 31 109 933 995 We (the entity) give ASX the following information under listing rule 3.19A.1 and as agent for the director for the purposes of section 205G of the Corporations Act. Name of Director Date of appointment Rickman Victor Rajasooriar 18 November 2011 Part 1 - Director’s relevant interests in securities of which the director is the registered holder In the case of a trust, this includes interests in the trust made available by the responsible entity of the trust Note: In the case of a company, interests which come within paragraph (i) of the definition of “notifiable interest of a director” should be disclosed in this part. Number & class of securities NA + See chapter 19 for defined terms.

11/3/2002 Appendix 3X Page 1 Appendix 3X Initial Director’s Interest Notice Part 2 – Director’s relevant interests in securities of which the director is not the registered holder In the case of a trust, this includes interests in the trust made available by the responsible entity of the trust Name of holder & nature of interest Note: Provide details of the circumstances giving rise to the relevant interest. Number & class of Securities Susan Mary Rajasooriar (spouse) 100,000 ordinary shares. 200,000 20.5c unlisted options expiring 11/10/14.

200,000 29c unlisted options expiring 11/10/14. 200,000 41c unlisted options expiring 11/10/14. R V Rajasooriar & S M Rajasooriar 100,000 ordinary shares.

(trustee and beneficiary of account). Part 3 – Director’s interests in contracts Note: In the case of a company, interests which come within paragraph (ii) of the definition of “notifiable interest of a director” should be disclosed in this part. Detail of contract Nature of interest Name of registered holder (if issued securities) No.

and class of securities to which interest relates NA + See chapter 19 for defined terms. Appendix 3X Page 2 11/3/2002  

24.11.11 09:20

3754 Postings, 5544 Tage tolksvarresults

Results of Annual General MeetingThu, 24 Nov 2011 12:03:00 +1000       6 hours, 17 minutes ago


ABN 35 090 468 018 Ground Floor, 1 Altona Street, West Perth WA 6005 Telephone:             +61 8 9485 2929       Facsimile: +61 8 9486 8700 www.altonamining.com Ref: AOH0250-EH/LW 24 November 2011 Australian Securities Exchange Exchange Plaza 2 The Esplanade PERTH WA 6000 Dear Sir/Madam In accordance with Listing Rule 3.13.2 and Section 251AA of the Corporations Act, notice is given that all resolutions put to the Annual General Meeting of Altona Mining Limited held on 23 November 2011 were passed on a show of hands. Details of the resolutions and valid proxy votes received in respect of each resolution are set out in the attached proxy summary. Yours sincerely ERIC HUGHES Company Secretary Att.

Altona Mining Limited Annual General Meeting 1) Proxy Summary Wednesday, 23 November 2011 Non binding Resolution to adopt Remuneration Report The instructions given to validly appointed proxies in respect of the resolution were as follows: For 120,867,009 Against 26,636,272 Abstain 960,354 Proxy's discretion 20,073 The motion was carried on a show of hands as an ordinary resolution. 2) Re-election of Kevin Maloney as a Director The instructions given to validly appointed proxies in respect of the resolution were as follows: For 162,234,847 Against 1,376,319 Abstain 577,521 Proxy's discretion 2,406,250 The motion was carried on a show of hands as an ordinary resolution. 3) Appointment of Auditor The instructions given to validly appointed proxies in respect of the resolution were as follows: For 163,454,392 Against 162,836 Abstain 571,459 Proxy's discretion 2,406,250 The motion was carried on a show of hands as an ordinary resolution.

Australian Securities Exchange: AOH, Frankfurt Stock Exchange: A20, Berlin: A20, Norwegian OTC ("NOTC"): ALTM 2..  

24.11.11 14:05

183 Postings, 5053 Tage Axel K.nicht viel passiert auf der HV

- Vergütung des Managements
- Wiederwahl eined Direktors
- Benennung des Jahresabschluss-Prüfer

http://ariva.de/news/...gebnisse-der-Hauptversammlung-deutsch-3902596

Hätte auch nicht gedacht, dass wir noch mal Kurse unter 0,17 €-Cent sehen. Aber ich bin was AOH angeht weiterhin positiv gestimmt. Kupfer bewegt sich heute zumindest wieder im plus.

http://ariva.de/chart/...erse_id=33&secu=101622754&t=intraday  

25.11.11 03:56

183 Postings, 4991 Tage blue labelAltona Mining hits 2m at 19% copper...

ltona  Mining's (ASX: AOH) two key assets are the Outokumpu Project in Finland  and the Roseby Project in Queensland, Australia. The Kylylahti mine at  Outokumpu is under development, Altona is targeting production of 8,000  tonnes of copper, 8,400 ounces of gold and 1,600 tonnes of zinc  annually.

 

Roseby is one of the largest copper resources in Australia, where  Altona is targeting copper production of up to 40,000 tonnes per annum.

       
Altona Mining hits 2m at 19% copper at Ivy Ann deposit within Roseby Project Friday, November 25, 2011 by Jeff Coote  
Altona Mining hits 2m at 19% copper at Ivy Ann deposit within Roseby Project
 

Altona Mining (ASX: AOH) has intersected a very high grade 2  metres at 19% copper at shallow levels from drilling at the north of the  Ivy Ann copper-gold deposit, which remains open to the north.

Ivy  Ann is located within Altona's 100% owned Roseby Copper Project in the  Mt Isa-Cloncurry mining district in Queensland, where the company  continues to receive high grade copper intercepts.

Highlights from 12 drillholes at a 0.30% copper cut-off grade include:

-  13 metres at 3.42% copper and 0.45 grams per tonne (g/t) gold from 21  metres, including 2 metres at 19.4% copper and 2.69 g/t gold from 22  metres;
- 25 metres at 1.21% copper and 0.15 g/t gold from 184  metres, including 9 metres at 2.17% copper and 0.29 g/t gold from 185  metres; and
- 23 metres at 1.18% copper and 0.25 g/t gold from 41  metres, including 7 metres at 2.16% copper and 0.48 g/t gold from 42  metres.

Altona has now completed a 15 hole and 2,850 metres  reverse circulation drilling program at Ivy Ann which is 30 kilometres  south-east of the main Roseby project area. The majority of the holes  intersected sulphide copper-gold mineralisation.

Results confirm  continuations to north, west and down dip. Numerous zones of  mineralisation up to 35 metres down hole were intersected often  including high grade intervals above 1% copper. Drilling will also  provide material for initial metallurgical test work.

The  significance of the Ivy Ann deposit is that it has potential to provide  supplementary feed to the proposed new mine and mill at Little Eva at a  higher grade than the average grade of Little Eva.

Ivy Ann currently has an Inferred Resource of 4 million tonnes at 0.72% copper and 0.12g/t gold.

The  company expects assay results in late November and work on an updated  resource model will commence in 2012 following down hole and collar  surveys.

Altona has a market capitalisation of A$140 million and had A$45 million cash on hand at the end of the September quarter.

 

 

30.11.11 06:06
1

183 Postings, 4991 Tage blue labelKylylahti Mine in ...

finnland zu 95% fertig gestellt

                                                              UTOKUMPU PROJECT, FINLAND


Altona Mining Limited (Altona) recently announced that the Kylylahti mine at its Outokumpu Project in Finland had exposed first ore in the mine decline. It is planned that the ore will be transported 41km to the Luikonlahti mill.
Excellent progress has been made in refurbishing the Luikonlahti mill and we have now achieved the milestone of commencement of equipment commissioning.
The refurbishment programme is 95% complete, wet testing of flotation equipment has commenced and first low grade ore to be used to commission the crushing circuit has been delivered to the mill. Crushing circuit commissioning will take place next week.
All earthworks at the tailings dam and concentrate dam were completed prior to winter and these facilities have been certified by the authorities.
The plant has had all electrical reticulation replaced and a new process automation system installed.
All refurbishment activity is scheduled for completion in late December – early January with production commissioning on ore scheduled for late January in line with the timing previously advised.
Plant capacity is currently designed to be 550,000tpa and initial engineering studies indicate this capacity can be increased by 45% to 800,000tpa for expenditure of approximately A$7M.
Local authorities have also completed a €2M upgrade of the road between the mine and the mill.
The forecast capital cost for the refurbishment of the mill, before receipt of government grants was €13.8M. Approximately €9.5M has been expended to date and forecast total expenditure to the end of December is approximately €13M with a further €1.9M of capital to expand the concentrate dam deferred until mid 2012.
The mine continues to produce development ore with low grade material to be used for initial commissioning. It is expected that some 15,000 tonnes of ore will be available on the ROM pad at the mill by the end of January.
The Company is developing a detailed commissioning and ramp up schedule and will release its forecasts for production in 2012.
Please direct enquiries to:
Alistair Cowden Anna Staples Axino AG
Managing Director Investor Relations Investor & Media Relations
Altona Mining Limited Altona Mining Limited Germany

 

30.11.11 16:46

183 Postings, 5053 Tage Axel K.nach den News von AOH und von den Finanzmärkten

... siehts nach Jahresend-Rallye aus:)  

02.12.11 09:32

3754 Postings, 5544 Tage tolksvarunterbewertung

Altona Mining beginnt mit der Anlagenkommissionierung auf dem Kupferprojekt Outokumpu

10:18 30.11.11Altona Mining beginnt mit der Anlagenkommissionierung auf dem Kupferprojekt Outokumpu  Der angehende australische Kupferproduzent Altona Mining (WKN A1C15Y) hat einen weiteren wichtigen Schritt in Richtung Produktionsaufnahme im ersten Halbjahr 2012 gemacht. Wie das Unternehmen aktuell meldet, ist die Instandsetzung der Luikonlahti-Mühle auf dem Outokumpu-Projekt in Finnland so weit fortgeschritten, dass man mit der Kommissionierung der Mühle beginnen konnte.

Erst vor Kurzem hatte Altona bekannt gegeben, dass man das erste Erz in den Stollen der Mine aufgedeckt hat. Dieses Erz soll in der 41 Kilometer entfernten Luikonlahti-Mühle verarbeitet werden. Deren Instandsetzung ist nun zu 95% abgeschlossen, sodass Altona den wichtigen Meilenstein der Anlagenkommissionierung in Angriff nehmen konnte.

Die Nasstests des Flotationsequipments haben begonnen und das erste aus der Minenentwicklung gewonnene Erz wird ab der kommenden Woche bei der Kommissionierung des Mahlkreislaufs genutzt werden. Zudem konnten alle Erdarbeiten beim Abraumdamm und dem Konzentratdamm noch vor Einbruch des Winters abgeschlossen und zudem bereits von den Behörden abgenommen werden.

Zudem wurde in der Anlage das elektrische Verteilernetz vollständig ersetzt und ein neues Prozessautomatisierungssystem installiert. Gleichzeitig haben die Behörden vor Ort die Straße zwischen Mine und Mühle für rund 2 Mio. Euro erneuert. Bis Ende Dezember / Anfang Januar sollen nun alle Instandsetzungsarbeiten abgeschlossen werden, sodass die Produktionskommissionierung mit Erz wie geplant Ende Januar erfolgen kann.

Derzeit geht Altona von einer Produktionskapazität auf dem Outokumpu-Projekt von 550.000 Tonnen Erz pro Jahr aus, wobei nach Aussage des Unternehmens Ingenieursstudien zeigen, dass diese für „nur“ 7 Mio. AUD um 45% auf 800.000 Tonnen pro Jahr erweitert werden kann. Die geschätzten Kosten für die Instandsetzung der Mühle lagen bei 13,8 Mio. Euro, von denen Altona bislang rund 9,5 Mio. Euro investiert hat. Bis Ende Dezember wird man dann schätzungsweise 13 Mio. Euro ausgegeben haben. Mitte 2012 werden dann laut Aussage des Unternehmens weitere 1,9 Mio. Euro für die Erweiterung des Konzentratdamms fällig.





Derzeit produziert die Mine weiteres Entwicklungserz mit niedrigen Gehalten, das für die anfängliche Kommissionierung eingesetzt werden soll. Altona geht davon aus, dass man zu diesem Zweck bis Ende Januar rund 15.000 Tonnen Erz an der Mühle gelagert haben wird.

Aktuell arbeitet Altona auch noch an einem detaillierten Zeitplan zur Kommissionierung der Mühle und zum An- und Hochfahren der Produktion. Die Produktionsprognosen wird man dann 2012 veröffentlichen.

Wir beurteilen die jüngsten Nachrichten vom Beginn der Kommissionierungsphase als sehr positiv – wenn vielleicht auch nicht als äußerst spektakulär. Sie zeigen aber wieder einmal, dass Altona Mining seinen Weg kontinuierlich macht und dabei die selbst gesetzten Budget- und Zeitplanungen im Großen und Ganzen einhält.

Damit sinkt das Risiko in Bezug auf die Minenentwicklung weiter und die Chancen steigen unserer Ansicht nach, dass das Unternehmen von Managing Director Dr. Alistair Cowden auch seine Produktionsplanungen – 8.000 Tonnen Kupfer, 1.600 Tonnen Zink sowie 8.400 Unzen Gold pro Jahr – in die Tat umsetzen können wird.

Wir glauben, dass Altona Mining auf dem aktuellen Kurs schon allein auf Grund des Potenzials von Outokumpu unterbewertet ist. Bezieht man darüber hinaus das riesige, australische Roseby-Projekt mit ein, von dem das Unternehmen erst vor Kurzem wieder positive Neuigkeiten meldete, wird diese Unterbewertung unserer Ansicht nach noch deutlicher.  

06.12.11 14:35

3754 Postings, 5544 Tage tolksvarspitze, wenn das nichts ist

Altona Mining: Die Arbeiten in Finnland schreiten problemlos voran..

20:07 05.12.11
Von Stefan Bender (Silbernews.com)



Altona Mining ist ein angehender Kupferproduzent mit einer Mine in Finnland. Erst vor kurzem meldete das Unternehmen, dass man das erste Erz in der Untertagemine erreicht hat. Alle Arbeiten gehen zügig voran. So auch die weitere Instandsetzung der Verarbeitungsanlage in Luikonlahti.

Das Erz was aus der Untertagemine abgebaut wird, soll wie geplant zu der 41 km entfernt liegenden Verarbeitungsanlage transportiert werden. Es wurden bereits 2 Millionen Dollar für den Straßenbau zwischen der Mine und der Verarbeitungsanlage ausgegeben.

Die Instandsetzung der Verarbeitungsanlage ist zu 95% abgeschlossen. Hierfür wurden bislang 9,5 Millionen Euro ausgegeben. Vorgesehen sind hier ohne die Berücksichtigung der staatlichen Zuschüsse, ca. 13.8 Millionen Euro. Bis Ende Dezember werden ca. 13 Millionen Euro aufgebraucht sein.



Es wurde bereits erstes Erz mit geringem Rohstoffgehalt bei der Verarbeitungsanlage angeliefert. Die Prüfung des Prozesses in dem nasses Erz verarbeitet werden soll, hat bereits begonnen. Mit der Inbetriebnahme der Verarbeitungsanlage wird in der 2. Dezemberwoche gerechnet.
Bis Ende Januar 2012 will man ca. 15.000 Tonnen Erz an der Verarbeitungsanlage angeliefert haben. Auch sollen die Arbeiten für den Damm des Rückhaltebeckens noch vor dem Winter abgeschlossen werden. Die Erweiterung des Zementdamms ist für Mitte 2012 vorgesehen. Die Kosten dafür belaufen sich auf ca. 1,9 Millionen Euro.






Alle Bauten sind von der Behörde besichtigt und abgenommen worden. Das komplette elektrische Netz wurde vollständig ausgetauscht und es wurde ein neues System zur Prozessautomatisierung installiert. Die gesamte Instandsetzung soll gegen Ende Dezember/Anfang Januar abgeschlossen sein und damit liegt das Unternehmen voll im Plan. Altona Mining wird einen detaillierten Plan zur Inbetriebnahme aufstellen und wird auch eine erste Schätzung der Produktionsmenge bekannt geben.
Technische Untersuchungen haben bereits aufgezeigt, dass man durch Investitionen von ca. 7 Millionen Dollar die Verarbeitungskapazität um 45% steigern kann. Das heißt, dass man die Verarbeitungskapazität von jetzt 550.000 Tonnen Erz pro Jahr auf 800.000 Tonnen Erz pro Jahr steigern kann.

Mein Fazit:

Es wird ein spannender Jahresabschluss erwartet und ein noch spannenderer Jahresbeginn in 2012. Läuft weiter alles nach Plan, so wird Anfang nächsten Jahres in Finnland ein neuer Kupferproduzent entstanden sein.
Wenn Ihr mehr spannende Informationen zu Explorern und anderen interessanten Werten erfahren möchtet, würde ich mich über die Teilnahme an meinen Diskussionen freuen!

» http://www.wallstreet-online.de/diskussion/...unde-reelle-depots-2011

Viel Erfolg beim Handeln wünscht Euch
Euer TimLuca  

07.12.11 11:07
1

942 Postings, 6089 Tage surdoSieht alles seeeehr gut aus..

...also wenn die Umstände nicht so währen , hätten Wir ganz andere Kurse, die Amis versuchen die eigenen Probleme auf die Welt zu verteilen , was sie ja auch seit langer Zeit machen, aber...so bald Europa es schafft sich stärker zu Präsentieren und eine Inflation in Kauf zu nehmen , was nach meiner Meinung nicht mehr lange dauert, werden die Aktien nach oben gehen, einige so schnell das es schwer sein werden kann sie zu kaufen um einen Gewinn zu realisieren bis zur nächsten Korrektur, bin ziemlich Optimist mit diesem Wert.  
-----------
Eine Lüge reist einmal um die Erde,
während sich die Wahrheit die Schuhe anzieht.

07.12.11 17:35

3754 Postings, 5544 Tage tolksvarauf deutsch, alles bestens

Roseby

12:01 07.12.11

Altona Mining Ltd. / Schlagwort(e): Bohrergebnis

Altona Mining Ltd.: Abschluss der Bohrungen auf Roseby

07.12.2011 11:59
--------------------------------------------------

West Perth, Western Australia, Australien. 7. Dezember 2011. Altona Mining
Limited (WKN: A1C15Y; ASX: AOH) (kurz 'Altona Mining' oder 'das
Unternehmen') gibt die letzten noch ausstehenden Ergebnisse der Bohrungen
vom Roseby-Projekt bekannt. Das Projekt befindet sich vollständig in
Unternehmensbesitz und liegt in der Bergbau-Region Mount-Isa-Cloncurry im
australischen Bundesstaat Queensland (siehe Abbildung 1 der ursprünglichen
englischen Pressemitteilung, die am Ende verlinkt ist).

In diesem Jahr hat Altona Mining 148 Rückspül-Bohrungen im Umfang von
29.221 Bohrmetern und 10 Kern-Bohrungen im Umfang von 2.590 Bohrmetern
durchgeführt.

Die bedeutendsten unter den neu vorliegenden Ergebnissen stammen von den
Lagerstätten Blackard und Ivy Ann.

Die Highlights bei einem Cut-Off-Kupfergehalt von 0,30 % sind:

Bohrung IAR230: 50 m Bohrabschnittslänge mit 1,01 % Kupfer ab 38 m
Bohrtiefe (und 0,16 g/t Gold)

BCR902: 23 m mit 1,10 % Kupfer ab 146 m
BCR900: 38 m mit 0,98 % Kupfer ab 73 m
BCR901: 15 m mit 0,84 % Kupfer ab 85 m
BCR903: 75 m mit 0,68 % Kupfer ab 24 m

Vollständige Tabellen mit Ergebnissen und eine Beschreibung der verwendeten
Methoden sind im Anhang der ursprünglichen englischen Pressemitteilung
enthalten.

Die in diesem Jahr durchgeführten Bohrungen hatten sehr großen Erfolg und
haben zu Folgendem geführt:

Lagerstätte Little Eva: Die nachgewiesene Ressource wurde von 30,4 Mio. t
Erz mit 0,78 % Kupfer auf 74,7 Mio. t mit 0,6 % Kupfer erhöht. Eine weitere
Erhöhung wird erwartet. Der große Zuwachs hat es Altona Mining ermöglicht,
sich auf die endgültige Machbarkeits- und Wirtschaftlichkeitsuntersuchung
(Definitive Feasibility Study) über nur eine einzige große Tagebaugrube mit
Verarbeitungsanlage auf Little Eva zu konzentrieren.

Lagerstätte Ivy Ann: Diese Satelliten-Ressource mit 4,0 Mio. t Erz mit 0,72
% Kupfer und 0,12 % Gold besitzt ein deutliches Wachstumspotenzial und
könnte zur bedeutendsten Zubringer-Lagerstätte werden. Diese Lagerstätte
zusammen mit Little Eva wird die Betriebsdauer der Mine verlängern und die
Verarbeitungsmenge der Verarbeitungsanlage auf Little Eva maximieren.

Lagerstätte Blackard: Blackard ist eine große und komplizierte Lagerstätte
mit 46,3 Mio. t Erz mit 0,63 % Kupfer. Die Ressource besteht aus einer
oberflächennahen Schicht aus supergenem Oxid-Kupfererz, einer mächtigen
Schicht aus supergenem nativen Kupfererz und einer darunter liegenden
Schicht aus primärem Sulfid-Erz. Die Bohrungen waren dazu ausgelegt, die
Kontinuität des primären Sulfid-Erz zu prüfen. Es sind bedeutende
Fortschritte bei der Bestimmung des Typs und der Geometrie der Vererzung im
frischen Gestein erzielt worden. Das erlaubt eine Hochstufung der
Ressource.

Altona Mining wird in den kommenden Wochen eine neue Ressourcen-Schätzung
für die Little-Eva-Lagerstätte bekannt geben. In 2012 wird das Unternehmen
eine systematische Neu-Schätzung der Ressourcen aller anderen Lagerstätten
auf Roseby durchführen.

Die ursprüngliche englische Pressemitteilung enthält weitere Angaben, wie
eine schematische geologische Karte, Tabellen mit Bohrergebnissen und eine
detaillierte Aufschlüsselung der bisher nachgewiesenen Ressourcen auf
Roseby, und ist als PDF-Datei mit folgendem Link abrufbar.

http://www.altonamining.com/static/uploads/...s/AOH0263_-_Roseby_Dril
l_Programme_Complete.pdf
Für weitere Informationen wenden Sie sich bitte an:

Altona Mining Limited
Ground Floor, 1 Altona Street
West Perth, WA 6005
Australien
Tel:             +61 8 9485 2929      
www.altonamining.com

AXINO AG
investor & media relations
Königstraße 26
70173 Stuttgart
Germany
Tel.             +49 (711) 253592-30      
Fax +49 (711) 253592-33
www.axino.de

Dies ist eine Übersetzung der ursprünglichen englischen Pressemitteilung.
Nur die ursprüngliche englische Pressemitteilung ist verbindlich. Eine
Haftung für die richtige Übersetzung wird ausgeschlossen.

07.12.2011 Veröffentlichung einer Corporate News/Finanznachricht,  
übermittelt durch die DGAP - ein Unternehmen der EquityStory AG.
Für den Inhalt der Mitteilung ist der Emittent / Herausgeber verantwortlich.

Die DGAP Distributionsservices umfassen gesetzliche Meldepflichten,  
Corporate News/Finanznachrichten und Pressemitteilungen.  
DGAP-Medienarchive unter www.dgap-medientreff.de und www.dgap.de

--------------------------------------------------  

08.12.11 10:44
1

3754 Postings, 5544 Tage tolksvarund noch eins drauf, einfach super

Altona Mining stellt Ressourcenerhöhung aller Lagerstätten auf dem Roseby-Projekt in Aussicht

10:32 07.12.11Altona Mining stellt Ressourcenerhöhung aller Lagerstätten auf dem Roseby-Projekt in Aussicht  Der angehende Kupferproduzent Altona Mining (WKN: A1C15Y) hat 2011 auf seinem Roseby-Projekt in Australien 148 Bohrungen mit einer Gesamtlänge von 31.811 Metern durchgeführt. Nun liegen auch die letzten, erneut positiven Ergebnisse dieser Arbeiten vor. Sie legen, zusammen mit den bereits gemeldeten Resultaten, steigende Ressourcen auf mehreren Lagerstätten des gigantischen Projekts nahe.

Die Highlights der neuesten Bohrergebnisse stammen dabei von den Lagerstätten Blackard und Ivy Ann:

- 50 Meter mit 1,01% Kupfer und 0,16 Gramm Gold pro Tonne
- 23 Meter mit 1,10% Kupfer
- 38 Meter mit 0,98% Kupfer
- 15 Meter 0,84% Kupfer und
- 75 Meter mit 0,68% Kupfer

(Die vollständige Tabellen mit Ergebnissen finden sich auf der Website des Unternehmens.)





Nach Ansicht von Altona Mining waren die 2011 niedergebrachten Bohrungen ein voller Erfolg. Sie führten unter anderem dazu, dass die Ressource auf der Lagerstätte Little Eva von 30,4 Mio. Tonnen Erz mit 0,78 % Kupfer auf 74,7 Mio. Tonnen mit 0,6 % Kupfer erhöht wurden – und Altona geht davon aus, dass die Little Eva-Ressource noch weiter steigen wird. Doch schon der bisherige Anstieg hat es dem Unternehmen ermöglicht, sich auf die endgültige Machbarkeits- und Wirtschaftlichkeitsuntersuchung (Definitive Feasibility Study) mit nur einer einzigen großen Tagebaugrube mit Verarbeitungsanlage auf Little Eva zu konzentrieren.

In Bezug auf die Lagerstätte Ivy Ann, einer Satellitenressource mit 4,0 Mio. Tonnen Erz bei 0,72% Kupfer und 0,12 Gramm Gold pro Tonne, stellten die Bohrungen heraus, dass das Vorkommen über deutliches Wachstumspotenzial verfügt. Sie könnte zur bedeutendsten Zubringerlagerstätte für Little Eva werden. Diese Lagerstätte zusammen mit Little Eva wird nach Aussage von Altona die Betriebsdauer der Mine verlängern und die Verarbeitungsmenge der Verarbeitungsanlage auf Little Eva maximieren.

Die Lagerstätte Blackard ist ein großes und kompliziertes Vorkommen mit 46,3 Mio. Tonnen Erz mit 0,63% Kupfer. Die Ressource besteht aus einer oberflächennahen Schicht aus supergenem Oxidkupfererz, einer mächtigen Schicht aus supergenem nativen Kupfererz und einer darunter liegenden Schicht aus primärem Sulfiderz. Mit den Bohrungen, die dazu ausgelegt waren, die Kontinuität des primären Sulfiderzes zu prüfen, sind bedeutende Fortschritte bei der Bestimmung des Typs und der Geometrie der Vererzung im frischen Gestein erzielt worden. Und das dürfte hier eine Hochstufung der Ressource erlaubt.

Für Little Eva will Altona Mining bereits in den nächsten Wochen eine neue Ressourcenschätzung bekannt geben. 2012 wird dann eine systematische Neuschätzung der Ressourcen aller anderen Lagerstätten auf Roseby folgen.

Little Eva, Blackard, Lady Clayre und Ivy Ann – das Bohrprogramm von Altona Mining auf dem Roseby-Projekt scheint tatsächlich von anhaltendem Erfolg gekennzeichnet. Es wird immer wahrscheinlicher, dass Altona Mining mit diesen Bohrungen sein Ziel erreichen wird, eine überarbeitete Machbarkeitsstudie erstellen zu können, die eine Produktionsausweitung über die bislang angedachten 26.000 Tonnen pro Jahr hinaus unterstützen wird. Angedacht ist eine Erweiterung der geplanten Produktion auf rund 40.000 Tonnen pro Jahr.  

14.12.11 19:20

183 Postings, 5053 Tage Axel K.Kupfer war heute tlw. 5% im Minus



Ich finde das alles erheblich übertrieben...  

19.12.11 02:59
1

183 Postings, 4991 Tage blue labelAltona erhöht Resource...

Altona erhöht Resource auf Little Eva und auf dem Roseby-Projekt.

 

Link:

 

http://www.altonamining.com/static/uploads/...ittle_Eva_turns_100.pdf

 

19.12.11 10:05

3754 Postings, 5544 Tage tolksvarnochmal in deutsch,ist doch was

Altona Mining Ltd.: Geschätzte Ressource auf Little Eva auf 108 Mio. t Erz erhöht



Altona Mining Ltd.: Geschätzte Ressource auf Little Eva auf 108 Mio. t Erz erhöht

DGAP-News: Altona Mining Ltd. / Schlagwort(e): Bohrergebnis Altona Mining Ltd.: Geschätzte Ressource auf Little Eva auf 108 Mio. t Erz erhöht

19.12.2011 / 09:45


--------------------------------------------------


West Perth, Western Australia, Australien. 19. Dezember 2011. Altona Mining Limited (WKN: A1C15Y; ASX: AOH) (kurz 'Altona Mining' oder 'das Unternehmen') gibt eine weitere Erhöhung der geschätzten Ressource auf dem sich vollständig in Unternehmensbesitz befindlichen Projekt Roseby im australischen Bundesstaat Queensland bekannt.

Die geschätzte gesamte Ressource des Roseby-Projekts hat sich erhöht auf:

210 Mio. t Erzgestein mit 0,6 % Kupfer und 0,06 g/t Gold, also insgesamt 1,2 Mio. t Kupfer und 395.000 Feinunzen Gold.

Zum Vergleich: Die letzte Schätzung zum 26. Juli 2011 ergab 177 Mio. t Erzgestein mit 0,6 % Kupfer und 0,06 g/t Gold.

Die geschätzte gesamte Ressource der Lagerstätte Little Eva (Teil des Roseby-Projekts) hat sich erhöht auf:

108 Mio. t Erzgestein mit 0,52 % Kupfer und 0,09 g/t Gold, also insgesamt 564.000 t Kupfer und 305.000 Feinunzen Gold, bei einem unteren Cut-Off-Wert von 0,2 % Kupfer.

Zum Vergleich: Die vorangegangene Schätzung für Little Eva war 74,7 Mio. t Erzgestein mit 0,52 % Kupfer und 0,06 g/t Gold bei einem unteren Cut-Off-Wert von 0,2 % Kupfer.

Ca. 63 % der geschätzten Ressource sind in die Kategorien Measured (Gemessen) und Indicated (Angezeigt) eingestuft. Die Aufschlüsselung der neuen geschätzten Ressource findet sich im Anhang (der ursprünglichen englischen Pressemitteilung, die am Ende verlinkt ist). Diese Erhöhung der Ressourcen für Little Eva ist die endgültige nach dem Abschluss des Bohr-Programms auf der Lagerstätte in dieser Saison (von diesen Bohrungen wurden 21.085 Bohrmeter als Rückspül-Bohrungen und 2.041 Bohrmeter als Kern-Bohrungen niedergebracht). Die Menge an geschätztem enthaltenem Kupfer hat sich verdoppelt. Insgesamt wurden auf Little Eva Rückspül-Bohrungen im Umfang von 64.256 Bohrmetern und Kern-Bohrungen im Umfang von 12.270 Bohrmetern niedergebracht. Bohrungen wurden in Tiefen von 250 bis 300 m niedergebracht. Die Lagerstätte fällt steil ab, ist 1,3 km lang und hat eine Breite zwischen 20 und 400 m.

Little Eva ist nun eine bedeutende Erz-Lagerstätte mit ca. 560.000 t an Kupfer-äquivalentem Metall. Little Eva ist eine typische Lagerstätte vom Typ IOCG (Iron-Oxide Copper-Gold, deutsch: Eisenoxid Kupfer-Gold). Es ist eine große und einfache Kupfer-Gold-Sulfid-Lagerstätte mit hoher Tonnage mit hervorragenden metallurgischen Gewinnungsraten für Kupfer- (96 %) und Gold- (90 %) -Konzentrate. Die Verarbeitung wird mittels eines branchenüblichen Prozesses zur Gewinnung von Kupfer-Sulfid-Konzentrat erfolgen. Über der primären Vererzung aus Feldspar-Quarz-Hämatit-Karbonat-Calcopyrit befindet sich eine Schicht mit oxidierter Kupfer-Vererzung (in Form von Geothite, Malachit, etc.). Die Gewinnung von Kupfer aus oxidiertem Erz wird untersucht mittels der AmmLeach(R)-Technologie.

Die Erhöhung der geschätzten Ressource erfolgte hauptsächlich durch die Ausweitung vorheriger Grenzen Richtung Westen und zur Tiefe hin. Die bekannt gegebene Ressource basiert auf einem unteren Cut-Off-Wert (Abschneide-Wert) von 0,2 % Kupfer. Dieser wurde nach Analysen der geologischen Grenzen und nach Berücksichtigung von Grenzkosten festgelegt. Eine Tabelle mit Ressourcen-Angaben bei einem Cut-Off-Wert von 0,3 % Kupfer ist beigefügt, um einen Vergleich mit vorangegangenen Schätzungen zu ermöglichen.

Eine Beschreibung der Kriterien für die Beurteilung und Berichterstattung über die Ressourcen-Schätzung entspricht der Tabelle 1 des 'The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2004)' und ist in der Pressemitteilung vom 26. Juli 2011 detailliert wiedergegeben.

Little Eva ist auch der Künstlername von Eva Boyd, der Sängerin mit dem Nr. 1 Hit 'The Loco-Motion' im Jahr 1962 in den USA.

Es werden weitere Erhöhungen von Ressourcen von anderen Lagerstätten auf Roseby erwartet.

Die ursprüngliche englische Pressemitteilung enthält weitere Angaben, wie eine schematische geologische Karte und eine detaillierte Aufschlüsselung der geschätzten Ressource, und ist als PDF-Datei mit folgendem Link abrufbar.

http://www.altonamining.com/static/uploads/documents/AOH0260_-_Littl e_Eva_ turns_100.pdf

Für weitere Informationen wenden Sie sich bitte an:

Altona Mining Limited Ground Floor, 1 Altona Street West Perth, WA 6005 Australien Tel:             +61 8 9485 2929       www.altonamining.com

AXINO AG investor & media relations Königstraße 26 70173 Stuttgart Germany Tel.             +49 (711) 253592-30       Fax +49 (711) 253592  

19.12.11 11:21

183 Postings, 5053 Tage Axel K.Info aus der heutigen Pressemitteilung

..." Little Eva ist auch der Künstlername von Eva Boyd, der Sängerin mit dem Nr. 1 Hit 'The Loco-Motion' im Jahr 1962 in den USA."

wenigstens haben die Jungs von AOH  ihren Humor bei den Kursen nicht verloren:) oder macht diese Info irgendeinen Sinn?!  

22.12.11 11:28

942 Postings, 6089 Tage surdonochmal nachgekauft

hab mir noch mal 10000 ins Depot gelegt, werde weiter nach kaufen.
-----------
Eine Lüge reist einmal um die Erde,
während sich die Wahrheit die Schuhe anzieht.

26.12.11 18:59

2955 Postings, 5527 Tage bindabeiinteressant

kann mir jemand kurz erklären wie anfang 2010 der kurssprung entstand,eine kleine info wäre sehr nett  

10.01.12 19:50

942 Postings, 6089 Tage surdoAngebotsdefizit siehe Goldinvest.

Die Analysten von Harbor Intelligence gehen davon aus, dass sich 2012 am Kupfermarkt ein Angebotsdefizit von rund 194.000 ausbilden wird. Sie schätzen, dass die Nachfrage nach Garkupfer 2011 lediglich um 1,4% anstieg (2010: +7,2%), erwarten aber für das laufende Jahr ein Nachfragewachstum von 3,8%....es wird so kommen das der Kupfer preis weiter steigern wird und so glaubte man das auch 2010 eine große nachfrage kommen könnte, Ich werde hier weiter halten und sehe potenzial nach oben
-----------
Eine Lüge reist einmal um die Erde,
während sich die Wahrheit die Schuhe anzieht.

Seite: 1 | ... | 7 | 8 | 9 |
| 11 | 12 | 13 | ... | 39   
   Antwort einfügen - nach oben